21-101869Electrical
City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: WRIGHT
Project Address: 29115 9TH PL S
Permit #:21-101869-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 515330 0200
Project Description: Electrical connection for gas to gas furnace change out and run electrical for 4-ton Heat pump
Owner
Applicant
Contractor
DANIEL J WRIGHT
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
29115 9TH PL S
4601 S 134TH PL
(ELECTRICAL)
FEDERAL WAY WA 98003
SEATTLE WA 98168
BRENNHA962DU (3/31/22)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application? ..............-.. Yes
Electrical Fixtures
Circuits - Residential 2 Thermostat
PERMIT EXPIRES Thursday, 12 May, 2022
Permit Issued on Wednesday, May 12, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
() — Wash ington and the City of Federal Way.
Owner or agent: M. Date:
r-, A, n1 f
A�'
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 21 101869 00 Address: 29115 9TH PL S
Project: DANIEL J WRIGHT FEDERAL WAY WA 98003-3784
Scheduled inspections may be failed if this card is not on -site. DO i (Yl' LOSE THIS ctm. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspectio=i sequence. Qn-going inspections are logged on the back of this card.
Ell UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255)
Approved
By Date
❑ Pool Bonding (4195)
Approved
By Date
Feeders/Sub-panels (4045)
Approved
By Date
Final - Electrical (4055)
pproved
By 1155e Date
Approved
By
Date
❑
Temporary Power (4275)
Approved
By
Date
❑
Rough Electrical (4225)
Approved
By
Date
Approved to place concrete
By
Date
❑
By
Service (4235)
Approved
Date
❑
By
Ceiling Cover (4020)
Approved
Date
❑
Final Electrical
El
Right of Way
Rough Electrical
Approved
Approved
Approved
By
Date
By
Date
By
Date