Loading...
21-101869Electrical City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WRIGHT Project Address: 29115 9TH PL S Permit #:21-101869-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 515330 0200 Project Description: Electrical connection for gas to gas furnace change out and run electrical for 4-ton Heat pump Owner Applicant Contractor DANIEL J WRIGHT JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 29115 9TH PL S 4601 S 134TH PL (ELECTRICAL) FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA962DU (3/31/22) 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application? ..............-.. Yes Electrical Fixtures Circuits - Residential 2 Thermostat PERMIT EXPIRES Thursday, 12 May, 2022 Permit Issued on Wednesday, May 12, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of () — Wash ington and the City of Federal Way. Owner or agent: M. Date: r-, A, n1 f A�' CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 21 101869 00 Address: 29115 9TH PL S Project: DANIEL J WRIGHT FEDERAL WAY WA 98003-3784 Scheduled inspections may be failed if this card is not on -site. DO i (Yl' LOSE THIS ctm. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspectio=i sequence. Qn-going inspections are logged on the back of this card. Ell UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved By Date ❑ Pool Bonding (4195) Approved By Date Feeders/Sub-panels (4045) Approved By Date Final - Electrical (4055) pproved By 1155e Date Approved By Date ❑ Temporary Power (4275) Approved By Date ❑ Rough Electrical (4225) Approved By Date Approved to place concrete By Date ❑ By Service (4235) Approved Date ❑ By Ceiling Cover (4020) Approved Date ❑ Final Electrical El Right of Way Rough Electrical Approved Approved Approved By Date By Date By Date