21-102268City of Federal Way
Community Development Dept
33325 8th Ave S
FILE
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SHELLEY
Project Address: 35314 7TH AVE SW
Project Description: Replace gas furnace
Owner A_p I�nt
SHAWN SHELLEY JAIMIE HOWBRENNAN HEATING & A/C
35314 7TH AVE SW 4601 S 134TH PL
FEDERAL WAY WA 98023 SEATTLE WA 98168
Mechanical
Permit #:21-102268-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 066231 0190
Contractor
BRENNAN HEATING & A/C LLC
(GENERAL 01)
BRENNHA97IR9 (12/29/21)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation?. 2947 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures 1
Furnaces I
PERMIT EXPIRES Saturday, 4 December, 2021
Permit Issued on Monday, June 7, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent:Owor NLN BE-
❑ate-
A��
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 102268 00 Address: 35314 7TH AVE SW
Project: SHAWN SHELLEY FEDERAL WAY WA 98023-8140
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test Approved By Date By Date By Date ',/
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
1
Approved
By
Date
By
Date
BY
Date