Loading...
Right-of-Way Modification dated 6-22-18CITY of Federal Way Centered on Opportu. June 22, 2018 ESM CONSULTING ENGINEERS LLC Matt Reider 33400 8th Ave S Suite 205 Federal Way, WA 98003 RE. Permit #18-102212-00-SM; GREENLINE WAREHOUSE "A' , 3120 S 344'h St, Federal Way Dear Mr. Reider: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Economic Development This letter addresses your right-of-way modification request dated June 4, 2018 to revise the requirements for Weyerhaeuser Way South frontage improvements. Background The Federal Way Comprehensive Plan designates Weyerhaeuser Way South as a Minor Arterial, consisting of a 66-foot street with curb and gutter, 6-foot planter strips with street trees, 8-foot sidewalks, and street lights within a 100-foot right-of-way. Existing conditions vary along this approximately 1,335' long right-of-way. Existing right=of--way is as low as 66' wide to well over 100'. The existing pavement varies from about 55' wide to 84' wide, with curb and gutter on both sides. The west side of the road has 5' wide sidewalk only between the Loop Road and the roundabout, with no planter strip or streetlights. The east side of the road has 5' wide sidewalk and streetlights for almost the entire length of the frontage, and four foot wide planter strip only between the roundabout and the SR-18 right-of-way. A Right -of -Way Modification decision was issued on September 30, 2016 associated with a 314,424 square foot warehouse application on the single parcel located on the west side of Weyerhaeuser Way S. Frontage improvements for the full width of Weyerhaeuser Way S were required for the length of the lot. This decision was based on the Weyerhaeuser Company Concomitant Pre -Annexation Zoning Agreement (CZA) and the 1994 city code in place at the time the CZA was created. The warehouse application has since been revised to a "general commodity warehouse" (Warehouse A) with a gross floor area of 225,950 square feet. In addition, a boundary line adjustment was recorded on November 3, 2017 that divided the single parcel into two. A second "general commodities warehouse" (Warehouse B), with a size of 217,300 square feet, has been proposed for the second lot. \\CFWFILEI\Applications\CSDC\PROD\docs\save\151719._77906_ 18160608.DOC Staff has reviewed the applicable zoning and development standards and the CZA for this site. Full width frontage improvements and right-of-way dedication for the entire width of Weyerhaeuser Way S are required for any amount of building square footage exceeding 300,000 square feet. Since the proposed building is less than 300,000 square feet, the CZA states that only life -safety improvements are required for Warehouse A. Warehouse B would exceed that threshold, triggering full width frontage improvements. Modification Requests The applicant has requested the following modifications: Modification 1. Planter between sidewalk and face of curb to be planted with grass instead of street trees until required by future development. With the Warehouse A development, the applicant has proposed to build 8' wide sidewalk in its ultimate location along the west side of Weyerhaeuser Way S only. This improvement will run the length of the frontage on both Warehouses A and B, as shown on the Greenline Warehouse A Site Plan dated 03/12/2018 (Exhibit A). Full -width right-of-way dedication has also been proposed for both Warehouse A and B frontages as part of Warehouse A development. Other frontage improvements proposed to be completed with Warehouse A include: planter strip (grass only, no trees), relocating bus stops, adding bus shelters, providing a left turn lane for truck entrance, left -in, right -out driveway, pedestrian crosswalk, and a path through the managed forest buffer. All proposed improvements are considered either life -safety requirements or within the scope of the TIA that has been submitted for this development. This modification is approved, with the following conditions: 1. Street lighting is considered a life -safety issue, and must be constructed on the west side of Weyerhaeuser Way S. with Warehouse A, concurrent with sidewalk installation. 2. Current ADA standards must be met. 3. Sidewalk and planter strip on the east side of Weyerhaeuser Way S, street trees on both sides of the roadway, and road widening, may be deferred to a later date that shall be mutually agreed upon. Improvements must include sidewalk and planter strip built to current standards on the east side of Weyerhaeuser Way S., from the WSDOT right-of- way to the Loop Road. Existing street lighting may need to be relocated or replaced. 4. The right-of-way dedication shall insure that right-of-way width is no less than 100' for the entire frontage of both Warehouse A and Warehouse B. 5. The applicant shall provide a bond for the remainder of the full -width improvements. A date shall be mutually agreed upon by which time the improvement must be completed. The applicant shall submit an engineer's estimate for 120% of the cost of improvements, using prices reasonably expected based upon the agreed required completion date. \\C FW FiLE I \Applications\CS DC\PROD\docs\save\ l 51719_77906_18160608. DOC Modification 2. Aside from the provided street improvements listed above, leave existing pavement and channelization intact to maximum extend feasible until required by future development. This modification request is denied. Pavement reconstruction and channelization are a condition of SEPA and will be determined separately from the concomitant agreement and this right-of- way modification, as applicable to this development. The right-of-way modification decision issued on September 30, 2016 is no longer applicable. The conditions of the new modification decision are valid for one year from the date of this letter. Should this project change significantly from the current site plan, or land use approval is not obtained within one year, this right-of-way modification shall become void and a new request for modification must be submitted. If you have any questions, please contact Ann Dower at 253-835-2732 or at ann.dower(iDcityoffederalway.com. Sincerely, V2� alsh, P.E. Deputy Public Works Director EJW/AD: av Enclosure: Exhibit A cc: Marwan Salloum, P.E. Public Works Director Sarady Long, Senior Transportation Planning Engineer Cole Elliott, P.E.; Development Services Manager Stacey Welsh, Senior Planner Kevin Peterson, Engineering Plans Reviewer Project File/ad Day File \\CFW FILE 1 \Applications\CS DC\PROD\docs\save\ 151719_77906_ 18160608. DOC aA9K SAL 1 ADD 240' DEEP STORAGE. LEFT MRN LANE AND CHANNEUZATION FINAL DESIGN TO BE DETERMINED BY TRAFFIC ENGINEER. CROSSING TO BE RELOGTEO TO NORM 310E OF ORNE'AAY BY TRAFFIC ENGINEER. TYPICAL 8.5'xl8' PARKING SCALE: i=20' A PORTION OF SECTION 21, T_21 N_, R. 4 E., W.M_ 00 LFFi DMH Sam APPROAMATE �OGRON^^ RF•Y CROSS D LDCARCIN DY IRi4M OKPII&L V Ilrl l 11 Ly IVICLP n SCALE:I-= 80' SIGN NG TRUCN ENTRANCE CONTOUR INTERVAL =2' DATUM: N.G.V.D. 29 1� r SHEET INDEX: -- - 57 C wm_ CIVIL PLANS A3pTM S. AGR W -1T— i ST-01 SITE PLAN 2 a-01 TOPOGMPHIC SIIEDlEY .1 3 L%_O, LEGEND 110W- fli R1/W DmIGiAN 1 SD-Ol 090AWOWY O �y.,E q � 4 AND RWM-0E-4AY PLM 3 lh-Ol P%LDI4RaR1' UYQSGPE FLVE 5 L7-02 LANDSCAPE DETAILS & NOTES GR-01 CLEARING & GRADING PLAN B GR-02 SITE & ROAD CROSS SECTIONS i0 Of-01 TRUCK MOVEMENT SmGY 11 GT-02 STRUCK JXLYVAW SFOGY 12 TR-0Cl TREE/YEGUATION REEFNTION PLAN ARCHITECTURAL PLANS r DE5CTiPIM0 DESIGN EIRIE=. E%1QtlZL A1.OR EW IONS & PERSPEUMES Al I BUILDING E3EYAROHS PROJECT STATISTICS- ORRICAL AREAS NUNEXEMPT - 32.557 SF_ (1.44 AC.) ape& SPACE: 0.5% (O W-1 AREA OF ON -SITE PUBL PURPOSE LANDS = 0 S.F. NET SUE AREA - 597,843 SF. (15.72 AC.) SITE DATA: TONING: C9-1 CONSTRUCTION: uNUMNM USE 1.0RE40USE AND OFFICE R IUNI0 FILL AREA = 9,949 SF. PLINKING M CAR STALLS (7 AGA ACCESSIBLE), 30 TRAILERS TRAILER STALLS: 127X55' PARKING STALLS 255 ST-CAM-0.5'XIS (�1D11 AISIc mmH: 26' (TYP) FRONTAGE IMPROVEMENTS: FRONTAGE WPROVEMBICTS FOR THE BUILDING A PROJECT ARE TO BE DEFERRED LINER. SUCH ME AS NEW DE/ELOPMENT EXCEEDS 300.000 PER SECTION 15 OF THE WEYEAHAEUSER COMPANY CONCOMITANT PREP NIXATION ZONING AGREEMENT, DATED AUGUST 23. 19" TW PROJECT H1Ei SET ASIDE .ADEQUATE RIGHT-OF-WAY TO .ACCOMMODATE RIESE lMPROVENENTS. Pp � T NTA ' (SII CONS MING ENGINEERS Tommy gVPUS. '1C (AURA BAAIENNAGEN, PE, LIKED AP TO MESSMER 33400 BM AYE S 8047 IMPERIAL HIGHWAY, SUM SUITE 1205 DOWNEY. CA 90242 hDEML W. RA 9110Q3 ,ZSS) 830-0113 iARD6;'APF ARNYIEL^T :__ I KURLLO pIQ<NEERS IATASA IE S /J 35 0 TH AVE T 150 0 SEA / JEEK RD .11PARI01 33400 B0 AVE S 15050 SEAR CREEK RD NE a WAY, WA 38003 [+75} 561-7550 (253)B3 (253) B-fi1t3 TJ'MRIRIICJL fDCIY.T�R IRAtHvPAR� nDR ET'R GBDLTACMNEERS '� 1101 AWC4ELVEY jur615 WNSr S 1101 -A 00 AVE g fi AN SW S SURE0 NIRKLWO, 7!A 98033 fACOMA WA 98402 (•125) 250-0561 apf,HITFCT CRAFT ARCHUELTS PLLC KATHY CRAR Z505 SRO AYE. SUITE .1324 ' 3FAME Y!A 90171 -nfi) '20-Tp01 -