Loading...
21-102193-Project Narrative and UPIII Burden of Proof-06-03-2021-V1 June 3, 2021 Job No. 2120-001-020 Mr. Keith Niven Planning Manager Department of Community Development City of Federal Way 33325 8th Avenue S Federal Way, WA 98003 RE: Process III Application Submittal and Burden of Proof Sokalskyy Reasonable Use – Parcel A S 359th Street Dear Mr. Niven: Please accept this letter and accompanying information as our submittal, on behalf of Yumo Construction, LLC and Pavlo Sokalskyy, for a Process III application with a reasonable use proposal of property located along S 359th Street between Pacific Hwy S and 16th Ave S in the City of Federal Way. The project includes King County parcel 292104-9091 (Parcel A of BLA 18-102925-SU) and directly east of the Hylebos Wetlands. The project parcel also contains an onsite Category III wetland – the buffers from each wetland fully encumbers the project site. Applying provisions from FWRC 19.145.440(4-6) is not feasible for development of the site. We understand that FWRC 19.145.090 provides standards related to reasonable use processes within the City. It is our understanding that based on the criteria in (3), a proposed single-family home for the project parcel may be approvable. Thus, the project proposes to build a single-family home within the buffer of two wetlands. The following is a general project narrative that outlines the proposal as well as known issues and constraints that are relevant to this project. Please refer to the enclosed site plan for more details. Zoning The subject property is zoned RS15.0 and is approximately 0.86 acres. The parcel is currently vacant, with no street address or structural improvements. Surrounding uses are as follows:  North: Multi-Family Residential  South: Vacant  East: Single-Family Residential  West: Hylebos Wetland Property Mr. Keith Niven Parcel A June 3, 2021 Page 2 Critical Areas and Reasonable Use The project parcel has potential to meet the underlying zoning standards for single-family residential uses within the RS15.0 zone. However, the site is encumbered by a Category III wetland with 6 habitat points, requiring a 150’ buffer per FWRC 19.145.420.2. The buffer from this onsite wetland encompasses the entirety of the property. In addition, the Hylebos Wetlands (Category I- 8 habitat points) west and north of the subject sites have a 300’ buffer that also overlaps the property. The subject property and the owner’s additional property south of this site have previously gone through a wetland report peer review. Under city file no. 16-105771-AD it was determined as documented in a September 18, 2017, letter that there is a Category II wetland on-site (Wetland A) with a 165-foot buffer and a Category I wetland off-site (Wetland B) with a 225-foot buffer, and that both parcels were completely encumbered by the buffers from Wetland A and B. The two lots were later reconfigured via a Boundary Line Adjustment (city file no. 18-102925-SU) approved on December 11, 2018 and recorded under King County recording number 20190208900013. The previous, June 13, 2016, wetland delineation prepared by Habitat Technologies is valid for a five-year period. The city updated the wetland buffer requirements in the FWRC via Ordinance No. 19-873, adopted in July 2019. As part of this application, the project’s biologist has provided an updated report to address the City’s updated buffer requirements. Please refer to the Wetland and Buffer Establishment and Enhancement Program by Habitat Technologies, dated May 4, 2021, for the required updates, mitigation plan and responses to the Reasonable Use criteria found in FWRC 19.145.090 (3). Proposed Use and Layout The project layout proposes to build a single-family home, utilizing the existing access and utilities easement with a 16’ asphalt drive aisle that extends minimally from the southern parcel. The building footprint of the future home will be no more than 1,600 SF, located in the southeast portion of the parcel, to provide the most distance from the onsite and adjacent wetlands, The residence will also include a 20’ wide driveway, a walkway and a front porch. As shown on GR-01, grading is minimized as much as possible by providing a daylight basement. All on site trees will be retained and preserved. The future home would have a maximum permanent impact of 7,215 SF, as described below. Net Developable Area: Total Site Area: 37,609 SF Critical Area: 10,868 SF Critical Area Buffer: 19,526 SF Net Site Area/Permanent Impacts: 7,215 SF Utilities Water and sanitary sewer services provided by Lakehaven Water and Sewer District are available in the adjacent right-of-way to the property – service lines will be provided from the existing utility mains. This home will also contain sprinklers to be approved by the Fire reviewer, as noted in the Mr. Keith Niven Parcel A June 3, 2021 Page 3 preapplication conference summary. The home will be fitted with downspouts/splash blocks as required. Please refer to the Stormwater Narrative provided with this submittal for more details. Process III – Burden of Proof The following is offered to demonstrate how this request meets the criteria of Federal Way Revised Code (FWRC) 19.65.100(2) Decisional Criteria. The code sections below are in italics with applicant responses in bold: (2) Decisional criteria. The director shall use the criteria listed in this subsection and the provisions of this title describing the requested decision in deciding upon the application. (a) The director may approve the application only if: (i) It is consistent with the comprehensive plan; The proposed Reasonable Use Application is consistent with the Federal Way Comprehensive Plan (FWCP) designation of Residential Single Family, Medium Density. The project is consistent with the following specific goals and policies of the FWCP:  LUP1 Use development standards and design guidelines to maintain neighborhood character and ensure compatibility with surrounding uses. The proposed project follows prescribed development standards and design guidelines specific to single-family homes and RS15.0 zone.  LUP 10 Support the continuation of a strong residential community. The development of the single-family residence will support the continuation of a strong residential community. The surrounding uses are also residential.  NEP2 Preserve and restore ecological functions, and enhance natural beauty, by encouraging community development patterns and site planning that maintains and complements natural landforms. The wetland and their associated buffers will be preserved to the greatest extent possible. The development will inevitably impact a portion of the buffer. However, a buffer enhancement program is proposed with this project. See the “Wetland and Buffer Establishment and Enhancement Program” by Habitat Technologies, dated May 2021 for details.  NEP82 Encourage minimal modification of trees within environmentally critical areas and their buffers. All trees within the critical areas and their proposed buffers will be retained.  NEP105 Open space provides important wildlife habitat corridors and should be linked with other regional and state open space systems. The onsite wetland currently provides 6 habitat points. The onsite wetland is immediately adjacent to the Hylebos wetlands west of the project parcel. Mr. Keith Niven Parcel A June 3, 2021 Page 4  NEP106 Preserve and restore habitat connections and tree canopy to link stream corridors, geologically hazardous areas, floodplains, wetland and critical habitat sites into a system of habitat corridors. The project will preserve the existing habitat connections and tree canopy. Permanent impacts will only be made to a portion of the onsite buffer and mitigation in the form of enhancement is proposed. (ii) It is consistent with all applicable provisions of this title; Development of the subject property is required to comply with all provisions of FWRC Title 19, “Zoning”; Title 16, “Surface and Stormwater Management” Title 14, “Environmental Policy”; and all other applicable codes, policies and regulations. By complying with the aforementioned requirements, and applying the Reasonable Use provisions of FWRC 19.145.090, the proposed development is consistent with all applicable provisions of FWRC. (iii) It is consistent with the public health, safety, and welfare; Future development of the residential site will be in accordance with applicable codes and regulations will ensure protection of the public health, safety, and welfare. Proposed infrastructure provides access and utilities appropriate for fire access, domestic water, sanitary sewer, and stormwater management for the site. All structures will be constructed to the most current City of Federal Way building standards. The onsite critical areas and their proposed buffers will continue to provide natural habitat and hydrology features within the City. (iv) The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal; Proposed infrastructure provides roads and utilities appropriate for fire access, domestic water (including fire sprinklers), sanitary sewer and stormwater management for the development. They will be reviewed for approval by South King Fire and Rescue, Lakehaven Water and Sewer District and City of Federal Way review staff. (v) The proposed access to the subject property is at the optimal location and configuration; and The proposed access to the subject property is designed to minimize all adverse impacts on the critical areas and buffer onsite. The access will be located on the far east side of the site to create the least impact to the critical areas and allow for the opportunity to share the access with the parcel south of the project (292104-9091). (vi) Traffic safety impacts for all modes of transportation, both on and off site, are adequately mitigated. Traffic safety impacts for all modes of transportation, both on and off-site are adequately mitigated. The project will include the installation of a 5-foot gravel shoulder along the south property frontage to accommodate the school walking route, as approved under #20-104334-00-SM. A traffic concurrency application is included with this application. Mr. Keith Niven Parcel A June 3, 2021 Page 5 Process III Submittal Items The following items relevant to the Process III application have been included with the overall submittal:  Process III Narrative and Burden of Proof (this letter);  Master Land Use Application;  Concurrency Application;  Preapplication Conference Summary Letter;  Process III Checklist Provided by City Staff;  Title Report;  Water and Sewer Availability Certificates;  Plan Set; o Site Plan – ST-01; o Grading and Drainage Plan – GR-01;  Stormwater Narrative;  Wetland and Buffer Establishment and Enhancement Program. We understand that this letter addresses the Applicant’s responsibility to provide a burden of proof to support approval of the Process III application for the Woodlands at Redondo Creek preliminary plat. Please contact me directly with any questions or comments you have regarding this project. Thank you for your attention to this project and we look forward to working with the City. Best regards, ESM CONSULTING ENGINEERS, L.L.C. SAVANNA NAGORSKI, M.S Land Use Planner/GIS Analyst Enc: As Noted cc: Pavlo Sokalskyy Yuriy Momotyuk, YUMO Construction, LLC \\esm8\engr\esm-jobs\2120\001\020\document\letter-003.docx