Loading...
21-102066-UP-Site Lighting-2021-06-01-V1VANUPUP UP GARBAGE &RECYCLINGOB-125-T4M-HSOB-125-T4M-HSOB-125-T4M-HSOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOA-109-T4MOC-109-T2MOC-109-T2MOC-109-T2MOC-109-T2MOB-125-T4M-HSOB-125-T4M-HSOB-125-T4M-HSOB-125-T4M-HSOD-39-T2MOD-39-T2MOD-39-T2MOD-39-T2MOD-39-T2MOD-39-T2MOD-39-T2M0.61.32.33.63.21.81.21.01.20.81.21.11.31.91.73.43.12.92.31.51.41.31.41.52.13.32.11.40.91.01.11.01.21.31.31.51.61.61.92.11.92.32.72.02.73.51.31.61.81.41.81.91.41.82.11.82.01.71.91.82.01.92.32.02.22.02.21.82.22.01.92.02.52.12.92.23.32.13.12.12.82.02.71.92.41.72.11.62.02.31.62.02.31.51.92.01.41.71.91.11.41.61.11.31.51.11.31.31.11.10.90.90.50.80.80.50.50.70.70.50.60.40.60.70.60.70.50.70.70.80.90.81.01.11.11.31.21.31.51.51.81.61.31.61.51.41.31.21.01.01.00.90.70.60.60.50.50.60.80.91.11.31.31.31.20.70.60.50.50.50.50.60.81.01.21.41.51.51.31.10.90.40.40.50.50.60.70.81.11.41.61.61.31.00.80.90.70.60.51.01.00.91.11.71.71.21.21.11.11.11.61.81.81.71.20.90.70.70.91.21.71.71.10.80.50.60.81.01.41.81.81.31.00.80.70.60.50.50.50.40.40.60.70.80.91.11.41.71.71.41.10.90.80.70.60.60.60.60.51.91.51.11.01.00.91.01.11.31.41.61.51.41.11.00.80.80.80.80.80.80.70.50.60.81.01.31.71.81.61.31.11.00.91.01.11.21.31.21.21.21.00.90.80.80.91.01.01.00.90.50.70.91.11.31.51.61.51.41.21.00.90.91.01.01.01.01.01.00.90.80.70.81.01.11.21.31.20.50.70.91.01.21.31.31.31.31.11.00.90.90.90.90.90.80.80.80.80.70.70.81.01.21.41.51.50.60.70.90.91.01.11.11.11.11.00.90.80.80.80.70.70.60.60.60.60.60.70.91.11.31.51.81.90.70.80.90.80.90.90.91.01.00.90.80.70.70.60.60.50.50.40.50.50.50.70.91.21.41.61.81.90.80.90.90.70.80.70.80.80.80.80.70.60.60.60.60.60.50.50.50.50.60.91.11.31.51.71.71.60.91.01.00.60.60.60.60.70.70.60.60.60.60.60.60.60.60.60.60.61.01.21.41.51.61.61.40.70.60.70.70.60.60.60.60.60.60.60.60.70.70.70.71.21.41.51.51.51.51.31.10.80.80.80.70.70.70.70.70.70.70.70.80.80.90.90.91.51.61.61.61.51.41.21.01.21.21.11.11.01.01.01.11.21.11.10.50.50.50.60.71.42.01.91.81.51.31.10.81.21.00.80.70.80.80.81.11.51.20.90.90.90.91.11.52.12.52.22.01.61.31.00.72.83.22.31.91.51.20.90.60.60.60.41.31.10.90.70.60.70.51.31.10.90.70.60.90.61.41.21.00.80.61.50.81.51.21.00.90.61.70.91.61.31.10.90.71.20.81.61.31.10.90.61.00.71.61.31.10.90.61.10.71.61.31.10.90.71.10.71.71.31.10.90.71.10.81.71.41.10.90.71.61.01.81.41.21.00.71.81.11.81.41.20.90.71.30.91.81.41.10.90.71.10.81.71.41.10.90.70.81.71.41.10.90.70.81.81.41.10.90.70.91.71.31.10.90.71.11.71.31.10.90.71.11.71.21.00.80.60.81.51.21.00.80.60.90.90.61.41.21.00.80.61.61.91.51.41.21.00.80.61.51.31.10.71.21.21.41.61.62.22.11.51.31.11.21.31.31.21.21.21.21.21.31.31.81.91.71.61.41.20.60.91.01.11.11.11.11.11.11.11.11.11.11.61.81.81.81.71.51.30.70.80.91.01.01.11.01.01.01.11.01.01.01.51.71.81.91.91.71.50.90.70.80.80.90.91.01.00.91.00.90.90.90.91.31.51.71.92.02.01.91.00.50.60.70.70.70.70.80.90.90.90.90.80.81.21.41.62.12.20.60.70.70.70.70.71.01.01.00.90.90.91.21.41.62.02.01.91.10.70.70.70.60.60.81.01.11.11.01.01.11.31.41.51.71.61.40.90.80.80.70.60.70.81.01.11.21.21.21.21.21.31.41.41.41.41.31.10.70.90.90.70.60.60.81.01.21.31.31.41.41.31.31.31.21.21.31.11.00.50.90.80.60.70.81.11.31.51.71.71.61.51.41.31.11.11.00.90.80.51.00.70.70.81.01.32.02.01.81.51.31.21.00.90.80.80.80.91.01.22.12.31.91.51.31.2Calculation SummaryLabelCalcTypeUnitsAvgMaxMinAvg/MinMax/MinEast Under CanopyIlluminanceFc1.853.60.63.086.00RoadwayIlluminanceFc1.373.50.43.438.75South Under CanopyIlluminanceFc1.241.80.71.772.57Trailer ParkingIlluminanceFc1.023.20.42.558.00Vehicular Parking LotIlluminanceFc1.172.30.52.344.60Proj. #:Drawn By:Reviewed By:SEAL:SMITH BROTHERS FARMSNOT FORCONSTRUCTIONNelco Architecture, Inc.CLIENT:PROJECT:CITY STAMP:26401 79TH AVENUE SOUTHKENT, WA 980321200 Fifth Ave., Suite 1300Seattle, WA 98101Phone: (206) 408-8500WWW.NELSONWORLDWIDE.COMPROJECT DIRECTORY:CLIENT: SMITH BROTHERS FARMAttn: TODD BEHANArchitect:NELSON WORLDWIDEAttn: MIKE SNYDERTel: 206.408.8639Email: MSNYDER@NELSONWW.COMPROPOSED FACILITY34700 9TH AVENUEFEDERAL WAY, WA20.0003729.000Date:No:Description:PROGRESSARCHITECTURALSITE PLAN1"=40'-0"SITE LIGHTING PLAN1SL1.005/10/2021SL1.0GENERAL NOTES:1.ALL CALCULATIONS AT GRADE LEVEL.2.LLF OF 0.85 APPLIED TO ALL LUMINAIRES.3.FIXTURES SHALL BE CONTROLLED ON/OFF VIA FIXTURE MOUNTEDPHOTOCELL.4.LOCATE POLES 24" FROM FACE OF CURB TO FACE OF POLE.LIGHTING FIXTURE SCHEDULEFIXTURE TYPEMANUFACTURER ANDMODEL NUMBERDESCRIPTIONLAMPMOUNTINGVOLTAGEREMARKSOA-109-T4MDSXW2-LED-30C-1000-40K-T4M-MVOLT-PIRH1FC3V-X-XXWALL MOUNT LUMINAIRE, FULL CUTOFF, TYPE 4MDISTRIBUTION WITH INTEGRAL PIR AND DAYLIGHTSENSOR.11,129 LUMENS109 WATTS, 4000 K CCTWALL120-277VFINISH TO BE SELECTED BY ARCHITECT. MOUNT BOTTOM OFFIXTURE AT 30'-0" AFG.OB-125-T4M-HSDSX1-LED-P4-40K-T4M-MVOLT-XX-PIRH1FC3V-HS-XXPOLE MOUNT LUMINAIRE, FULL CUTOFF, TYPE 4MDISTRIBUTION WITH INTEGRAL PIR AND DAYLIGHTSENSOR. FIXTURE SHALL BE SUPPLIED WITHHOUSE-SIDE SHIELD.14,182 LUMENS125 WATTS, 4000 K CCTPOLE120-277VFINISH TO BE SELECTED BY ARCHITECT. COORDINATE POLESPECIFICATIONS WITH FIXTURE MOUNTING OPTIONS. MOUNTBOTTOM OF FIXTURE AT 30'-0" AFG.OB-125-T4MDSX1-LED-P4-40K-T4M-MVOLT-XX-PIRH1FC3V-X-XXPOLE MOUNT LUMINAIRE, FULL CUTOFF, TYPE 4MDISTRIBUTION WITH INTEGRAL PIR AND DAYLIGHTSENSOR.14,182 LUMENS125 WATTS, 4000 K CCTPOLE120-277VFINISH TO BE SELECTED BY ARCHITECT. COORDINATE POLESPECIFICATIONS WITH FIXTURE MOUNTING OPTIONS. MOUNTBOTTOM OF FIXTURE AT 30'-0" AFG.OC-109-T2MDSXW2-LED-30C-1000-40K-T2M-MVOLT-PIRH1FC3V-X-XXWALL MOUNT LUMINAIRE, FULL CUTOFF, TYPE 2MDISTRIBUTION WITH INTEGRAL PIR AND DAYLIGHTSENSOR.10,936 LUMENS109 WATTS, 4000 K CCTWALL120-277VFINISH TO BE SELECTED BY ARCHITECT. MOUNT BOTTOM OFFIXTURE AT 30'-0" AFG.OD-39-T2MDSXW1-LED-20C-1000-40K-T2M-MVOLT-PIRH1FC3V-X-XXWALL MOUNT LUMINAIRE, FULL CUTOFF, TYPE 2MDISTRIBUTION WITH INTEGRAL PIR AND DAYLIGHTSENSOR.3,771 LUMENS39 WATTS, 4000 K CCTWALL120-277VFINISH TO BE SELECTED BY ARCHITECT. MOUNT BOTTOM OFFIXTURE AT 2'-0" BELOW BOTTOM OF CANOPY.NO SCALETYPICAL POLE FOUNDATION DETAIL2SL1.01.USE STAINLESS STEEL NUTS AND LOCK WASHERS.2.COORDINATE WITH SITE PLANS FOR EXACT LOCATION AND ORIENTATION OF THE POLE.3.CONTRACTOR TO SUBMIT ANY CHANGES TO THE FOUNDATION DETAIL TO THE STRUCTURALENGINEER FOR REVIEW PRIOR TO CONSTRUCTION.NOTES: