10-105229City of Federal Way -
Applicant
Community Development Servicesi
P O. Box 9718
KENNETH J BAUNE
Federal Way, WA 98063-9718
rILE
Ph: (253) 835-2607 Fax: (253) 835-2609
AUBURN MECHANICAL INC
Project Name: BAUNE
Project Address: 27913 21ST AVE S
Project Description: Replace Existing Gas Water Heater
Mechanical
Permit #: 10 -105229 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 757562 0540
Owner
Applicant
Contractor
KENNETH J BAUNE
CHRISTINE JOHNSON
AUBURN MECHANICAL INC
27913 21 ST AVE S
AUBURN MECHANICAL INC
AUBURMI163BA (9/12/12)
FEDERAL WAY WA 98003-6949
2623 W VALLEY HWY N
2623 W VALLEY HWY N
AUBURN WA 98001
AUBURN WA 98001
Additional Permit Information
Mechanical Valuation...........................................1100 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Hot Water Tanks .........................
PERMIT EXPIRES Tuesday, June 14, 2011
Permit Issued on Thursday, December 16, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and theCit of Federal Way.
Owner or agent: C)11 OR
Date: I awo
FINALED M/st/10
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON-SITE
Construction Ins .on Record
INSPECTION REQU TS: (253) 835-3050
10 -105229 -00 -ME Address: 27913 21 ST AVE S
KENNETH J BAUNE FEDERAL WAY, WA 98003-6949
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CA Rbi Inspections are listed as close to sequential order as
possible ('read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
Mechanical Rough -in )
Gas Piping(4 25)El
Final - Mechanical (4065)
Final Electrical
Approved
Approved
Approved to release test
approved
Date
By Date
By Date
lay Datelg_ ? ./(5
By
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date