Loading...
10-105229City of Federal Way - Applicant Community Development Servicesi P O. Box 9718 KENNETH J BAUNE Federal Way, WA 98063-9718 rILE Ph: (253) 835-2607 Fax: (253) 835-2609 AUBURN MECHANICAL INC Project Name: BAUNE Project Address: 27913 21ST AVE S Project Description: Replace Existing Gas Water Heater Mechanical Permit #: 10 -105229 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 757562 0540 Owner Applicant Contractor KENNETH J BAUNE CHRISTINE JOHNSON AUBURN MECHANICAL INC 27913 21 ST AVE S AUBURN MECHANICAL INC AUBURMI163BA (9/12/12) FEDERAL WAY WA 98003-6949 2623 W VALLEY HWY N 2623 W VALLEY HWY N AUBURN WA 98001 AUBURN WA 98001 Additional Permit Information Mechanical Valuation...........................................1100 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ......................... PERMIT EXPIRES Tuesday, June 14, 2011 Permit Issued on Thursday, December 16, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and theCit of Federal Way. Owner or agent: C)11 OR Date: I awo FINALED M/st/10 CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Ins .on Record INSPECTION REQU TS: (253) 835-3050 10 -105229 -00 -ME Address: 27913 21 ST AVE S KENNETH J BAUNE FEDERAL WAY, WA 98003-6949 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CA Rbi Inspections are listed as close to sequential order as possible ('read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough -in ) Gas Piping(4 25)El Final - Mechanical (4065) Final Electrical Approved Approved Approved to release test approved Date By Date By Date lay Datelg_ ? ./(5 By El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date