Loading...
10-104694City of Federal Way Community Development Services P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: BAUNE Project Address: 27913 21ST AVE S Project Description: Replace Gas Furnace add Heat Pump Mechanical Permit #: 10 -104694 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 757562 0540 Owner AnDimeant Contractor KENNETH J BAUNE SHANNON BUCKINGHAM EMERALD AIRE INC (GENERAL) 27913 21ST AVE S EMERALD AIRE INC EMERAAI055BL (04/01/11) FEDERAL WAY WA 98003-6949 5108 D ST NW 5108 "D" ST NW AUBURN WA 98001 AUBURN WA 98001 Additional Permit Information Mechanical Valuation............................................7000.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Compressors / Heat Pumps............ 1 Furnaces ......................................... 1 PERMIT EXPIRES Tuesday, May 3, 2011 Permit Issued on Th'Mr3day, November 4, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington aI�the ity of Federal Way. *�� Owner or agent: W Date. V1144LIEE)?'Isoltv THIS CARD IS TO REM A _ N ON-SITE CITY OF `y Construction Inspec pion Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 10 -104694 -00 -ME Address: 27913 21ST AVE S Project: KENNETH J BAUNE FEDERAL WAY, WA 98003-6949 Scheduled inspections may be failed if this card is not on-site. BO NOT LOSE THIS CARO Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector.ifyouu_arc.unsire _about anynfthc iitspections-or-the.inspection. sequence.S7n_going_insncctianLK Logged on the back of this card. Mechanical Rough -in (4165) ❑ Gas Piping (4125) Final - Mechanical ( 6 ) Approved Right of Way Approved Approved to release test Approved By Date By Date Date / Z `x, .,/a Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date