Loading...
10-103537City of Federal Way Community Development Services P.O- Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BARTELS Project Address: 27907 21ST AVE S Mechanical Permit #: 10 -103537 -00 -ME F � [--a: Inspection Request Line: (253) 835-3050 Project Description: Replace existing gas furnace a�gs� Parcel Number: 757562 0530 Owner Aanlican Contractor BELINDA J BARTELS NANCY BARRADALE MERCURIO'S HEATING & A/C 27907 21ST AVE S MECURIO'S HEATING & A/C MECUHA945B5 (1/25/12) FEDERAL WAY WA 4001 S UNION AVE 4001 S UNION 98003-6949 TACOMA WA 98409 TACOMA WA 98409 Additional Permit Information Mechanical Valuation ............................................ 5047.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Furnaces.......... --- 1 PERMIT EXPIRES Sunday, February 13, 2011 Permit Issued on Tuesday, August 17, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington Q and the City of Federal Way. � � �� Owner or agent: N Date. pt4wkj) totirtlo THIS CARD IS TO 1 4AIN ON-SITE CITY of Construction Ins ection Record Federal I Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 10 -103537 -00 -ME Address: 27907 21 STAVE S Owner: BELINDA J BARTELS FEDERAL WAY, WA 98003-6949 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. FiLF Mechanical Rough -in as Piping 5y Final - Mechanical ( S) Right of Way Approved By Approved Approved to release test Approved Date By Date By Date By Date By Date FiLF Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date