05-100710City munited evel Way Building - Multi Family Permit #: 0� - 100710 - 00 - Mf
Community Develops@lent Services
P.O, Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-7000 Fax: (253) 835-26011 t� Inspection request line: (253) 835-3050
1314 I n 1_l 'e c
Project Name: SOUNDVIEW APARTMENTS
Project Address: .28405 18TH AVE S Parcel Number: 332204 9092
Project Description: ALT - Converting a laundry room into a 559 sgft 1 bedroom apartment & a 377 sgft studio apartment,
including plumbing and mechanical work. (This is to final the work of an expired permit)
Owner
Applicant
Contractor
Lender
SOUNDVIEW & KIRKLAND ASSO
WEIDNER INVESTMENT *ROBER'
NAVI PACIFIC CONSTRUCTION *\
NONE
11200 ROCKVILLE PIKE
9757 JUANITA DR NE SUITE 300
NAVIPI*991BP (1/10/07)
ROCKVILLE MD
KIRKLAND WA 98034
37842 38TH AVE S
20852-3154
AUBURN WA 98001
NONE
Includes:
Census category: 433 - Reside
#1 #2 [ #3 #4
�eaupancy Grain __. _
R-1 t R-1
Construction T F: T
T e V- B Type V- B
Qsaupancy Load:
I
Floor Area (Sq. Ft.):
f 559 377
Census Category ................................................ 433 - Residential alt/add - inci Mechanical................................................. Yes
Plumbing .......... ...... Yes
Plumbing Fixtures
,riplon buantim l Descri IDn Quantity _ Description _uantilj
—� TQ--
Bathtubs Dishwashers { 2 Laundry Washer Outlets 2
Lavatories T 2 Sinks 2 LWater Closets — w
WalcrHeaters — --- —�
Mechanical Fixtures
Description w_T _ quanti Description Quantity! !` Description__ Quantity!
Fans 4 Ranges 2
CONDITIONS:
This decision shall not waive compliance with future City of Federal Way codes, policies, or standards relating to the
subject proposal.
Q_q_a 0 3 — a- C.._ 0 C, -- e vt'i
PERMIT EXPIRES December 24, 2005.
Permit issued on June 27, 2005
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and
the City of Federal Way. _ - ,
Owner or agent: r- roc Date: os�
THIS CARD IS TO'- _ZMAIN ON -SITE
CITY OF ` �'P Community Development Inspection Record
Federal WayIVR INSPECTION REQUEST PHONE # 253 835-3050
��
PERMIT #: 05-100710-00-MF
Owner:
Address: 28405 18TH AVE S
FEDERAL WAY, WA 98003-3289
This card is part of your required inspection documents.
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD.
Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections
as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the
inspection sequence. On -going inspections
are logged on the back of this card.
❑ Footings/Setback (4110)
❑
❑
Foundation Wall (4115)
Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
By Date
By
Date
By
Date
❑
❑
❑ Re -steel (4215)
Plumbing Groundwork (4190)
Slab/Concrete Floor (4255)�
Approved to place concrete or grout
Approved to cover
Approved to place concrete
By Date
By
Date
By
Date
❑
❑
❑ Underfloor Framing (4285)
Floor Sheathing (4105)
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By Date
By
Date
By
Date
❑ Roof Sheathing (4220) ❑ Rough Plumbing (4230)
Approved to install roofing Approved
By Date By Date g 20 QS
❑ Gas Piping (4125) ❑ Fire/Draft Stops (4095)
Approved to release test Approved '
By Date By S Date \C' 2� J
❑ Framing (4120) Insulation (4150)
Approved to insulate Approved to install wallboard
By,ACf' �� Date �0,_
2& a By+ 1 Date (f)/gQ�<
❑ Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
❑ Mechanical Rough -in (4165)
Approved
By Date
NOTE: Prior to scheduling a Framing (4120)
inspection; Electrical, Plumbing & Mechanical
Rough -in and Fire/Draft Stop inspections must be
igned-olf and approved. IBC 109.3.4/UBC 108.5.4
1R Gypsum Wallboard Nailing (4130)
Approved to install mud & lgpe
By
❑ Final - Fire Department (4060) 110
Approved
By Date
By
Date 1
Final - Planning
Approved
Date
❑ Final - Public Works (4080) Final - Mechanical (4065) Final - Plumbing (4075)
Approved Approved Approved
By Date B Date (� BX Date
_j
Final - Building (4050)
Approved
By I i ,� Dater t_. _