Loading...
20-101582-Final PermitBuilding - Commercial City ofFederal'"'ay Permit #•20-101582-00-CO Community Development Dept. 33325 8th Ave S Federal Way, wA 98003 Inspection Request Line: (253) 835-30-50 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PORCHLIGHT APARTMENTS (FORMERLY WATERBURY) Project Address: 32905 19TH PL S Parcel Number: 797880 0360 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Tenant improvements and addition of canopy to clubhouse building. Owner THRIVE COMMUNITIES 1518 IST AVE S SUITE 500 SEATTLE WA 98134 Includes: Applicant MARIT JENSENMG2 CORPORATION 1101 2ND AVE SUITE 100 SEATTLE WA 98101 Contractor T B CONSTRUCTION 3329 153RD ST SW LYNNWOOD WA 98087 Census Category: 437 - Commercial alt / add / conversion occupancy Class: Construction Type Occupancy Load: Floor Area (sq. ft. 1 2 Additional Permit Information 3 Lender OWNER IS LENDER 4 Mechanical to be Included? .............................. ... No Plumbing Work Valuation?..................................... 0 Mechanical Work Valuation? ....................... ........ ii Number of Stories................................................... I is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Total Valuation: 235,000.00 No Fixtures Associated With This Permit !! PERMIT EXPIRES Tuesday, 15 December, 2020 Permit Issued on Thursday, June 18, 2020 I hereby certify that the above information is correct and that the construction on the above described propertyandtheoccupancyandtheusewillbeinaccordancewiththelaws, rules and regulations of the State of ton he City of Federal Way. Owner or agent: _ Date: AN, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101582 00 Address: 32905 19TH PL S Project: THRIVE COMMUNITIES FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSETHIS CARD. Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.. Initial Erosion Control (4365) 0 Footings/Setback (4110) Foundation Wall (4115) By To be done PRIOR to breaking ground Date By Appro cdd to place concrete w Date %' 1" . a By Approved to place concrete Date Drainage/ Downspout (4040) Re -steel (4215) Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date Underfloor Framing (4285) Floor Sheathing (4105) Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date El Roof Sheathing (4220) Fire/Draft Stops (4095) Interim Erosion Control (4370) Approved to install rooting Approved i' C 1 Approved By Date By Date By Date Prior to scheduling a Framing inspection; Framing (4120) l Insulation (4150) Cand Electrical, Plumbing & Mechanical Rough -in Fire/ Draft Stop inspections must be signed- tf j A roved to insulate iSN, 1 Approved to install wallboard aff and approved. IBC 109.3.4 By Date .1 By Date El Gypsum Wallboard Nailing (4130) pppr to install mud & tape ey late 1 BY Suspended Ceiling Grid (4265) Approved to drop the Date ti By Final - S K F & R (4060) Approved Date Final - Building (4050) Final - Planning Final Erosion Control (4375) Approved Approved v t W e Approved l By Date By Date By 52 Date g Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date 13 Date I, v Date