Loading...
20-102050City of Federal Way Communiry Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SACAJAWEA JUNIOR HIGH Building - Commercial Permit #:20-102050-00-CO Inspection Request Line: (253) 835-3050 Project Address: 1101 S DASH POINT RD Parcel Number: 052104 9024 Project Description: ***BLUEBEAM ELECTRONIC REVIEW*** Replacement of portable classroom. Owner Applicant Contractor Lender STEPHEN NUTTFEDERAL WAY SAVANNA NAGORSKIESM ARIES BUILDING SYSTEMS LLC OWNER IS LENDER PUBLIC SCHOOLS CONSULTING ENGINEERS PO BOX 53348 1211 S 332ND ST 33400 8TH AVE S SUITE 205 BELLEVUE WA 98015 FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Census Category: 437 - Commercial alt / add / conversion Includes: l 2 3 4 Occupancy Class: Construction Type - Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ...... ....... I....... I .... ........... No Plumbing Work Valuation?.,................................... 0 Mechanical Work Valuation?.... ............................. 0 Number of Stories ....................................... I ... A....... I Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Comprehensive Plan Designation........................... SF - High -Density Residential Zoning Designation ........................ RS 9.6 Total Valuation: 10,662.40 No Fixtures Associated With This Permit H CONDITIONS: Extend fire alarm notification and initiation into the new portable. A separate permit is required for fire alarm work. A 2AIOBC rated fire extinguisher is required in each classroom. PERMIT EXPIRES Saturday, 16 January, 2021 Permit Issued on Monday, July 20, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of i n aro tj(; City of Federal Way. Owner or agent: l Date: 4%, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 102050 00 Address: 1101 S DASH POINT RD Project: STEPHEN NUTT FEDERAL WAY WA 98003-3735 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Initial Erosion Control (4365) Footings/Setback (4110) Foundation Wall (4115) To be done PRIOR to breaking ground .Approved to place concrete Approved to place concrete By Date By Date By Date Drainage/Downspout (4040) Re -steel (4215) Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date Underfloor Framing (4285) Floor Sheathing (4105) Shear Walls (4245) Approved to ;heath floor Approved to install flooring Approved to install .siding By Date By Date By Date El Roof Sheathing (4220) El Fire/Draft Stops (4095) Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date Prior to scheduling a Franain„ inspection; Framing (4120) Insulation (4150) Electrical, Plumbing & Mechanical Rmmh-iu Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be si netl- off and approved. 113C 109.3.4 n By Date. By Date El Gypsum Wallboard Nailing (4130i Suspended Ceiling Grid (4265) 7 Final - S K F &. R (4060) Approved to install mud & tape Approved to drop tile Approved By Date J By Date By Date CJ Final - Planning Final - Public Works (4080) Final Erosion Control (4375) A pproved A. pproved Approved By Date By Date By Date I__I Final - Boilding (4050) Approved By 40 Date 3 rq 2 Rough Electrical E13y: Final Electrical Right of Way Approved Approved Approved By Date Date By Date 10