Loading...
20-102356-Permit FinalCity of Federal Way Community Development Dept, 33325 8th Ave S FILEFederalWay, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SKECHERS #1136 TENANT WORK Project Address: 32031 PACIFIC HWY S Building -- Commprciat;. r + Permit #:20-102356-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 150050 0110 Project Description: BLUEBEAM - New work is limited to interior (tenant) improvements to an existing structure constructed for the purpose of retail sales. New construction will be limited to new sales and stock fixtures throughout. Existing conditions to include existing finishes, existing lighting, existing HVAC units and mechanical ductwork, existing restroom plumbing systems. No modification to the existing, fundamental building systems are anticipated. No plumbing or mechanical. Owner Applicant Contractor Lender HARSCH INVESTMENT PROPS LUNCH BRENT JAMES M BARB CONSTRUCTION TENANT 1S LENDER LLC 1240 ROSECRANS AVE SUITE 500 INC PO BOX 2708 MANHATTAN BEACH CA 90266 10701 RANCHITOS RD NE PORTLAND OR 97208 USA ALBUQUERQUE NM 87122 Census Category: 437 - Commercial alt / add / conversion Includes: 1 2 3 4 Occupancy Class: M Construction Type: Type Il - B Occupancy Load: Floor Area (sq. ft.) 7,160.00 Additional Permit Information Occupancy #1 - Area (Sq. Feet) ................... , 7160 Mechanical to be Included? .................................... No Mechanical Work Valuation?................I................1 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Comprehensive Plan Designation ........................... City Center Frame Total Valuation: 50,000.00 Occupancy # 1 -Construction Type ......................... Type Il - B Plumbing Work Valuation? ..................................... 0 Number of Stories ................................................... I Permit for Building Shell Only? ............................. No Occupancy #1 - Use ................................................ Retail/Mercantile Zoning Designation ................................................. CC-F No Fixtures Associated With This Permit !1 CONDITIONS: FIRE APPROVAL CONDITIONS: 1) A jobsite Pre -Construction Inspection by FIRE is suggested before the TI work commences. 2) Demolition & construction shall conform to the requirements of International Fire Code Chapter 33. 3) A separate permit is required for revisions or extensions of the following: Automatic sprinkler (IFC 903 & NFPA 13). Fire alarm system (IFC 907 & NFPA 72). 4) A Fire Watch is required for any Fire Protection System Impairment. Fire Protection Systems shall be placed back in service during all periods of non -work. 4%' CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 102356 00 Address: 32031 PACIFIC HWY S Project: HARSCH INVESTMENT PROPS LLt FEDERAL WAY WA 98003-6001 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE1411S CARD. Inspections are listed as close to sequential order as possible read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. I Footings/Setback (4110) Re -steel (4215) Slab/Concrete Floor (4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date Q Underfloor Framing (4285) 0 Floor Sheathing (4105) Fire/Draft Stops (4095) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date 7EIectrical, heduling a Framing inspection; Framing (4120) Insulation (4150) lumbing & Mechanicaough.Approved to insulate Approved to install wallboard t Stop inspections must be signed- d approved. IRC 109.3.4 By Date By Date Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date ED Final - Planning rBy Final - Building (4050) Approved Approved By Date At 1 Date .2hq Rough Electrical EBy Final Electrical Right of Way Approved Approved Approved By Date Date By Date