Loading...
20-103470 - Permit FinalCity of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY CITY HALL Project Address: 33325 8TH AVE S Building - Commercial Permit #:20-103470-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 926500 0290 Project Description: BLUEBEAIVI - Add glass panels to permit counter; remove existing counter and cabinets at Finance counter and add a wall with (2) transaction windows and an entry door. Owner Applicant Contractor Lender CITY OF FEDERAL WAY JASON MOORMANCITY OF OWNER 1S CONTRACTOR 33325 8TH AVE S FEDERAL WAY - PARKS FEDERAL WAY WA 98003 33325 8TH AVE S FEDERAL WAY WA 98003 Census Category: 437 - Commercial alt / add / conversion Includes: # 1 #2 #3 44 Occupancy Class: Construction Type. Occupancy Load: Floor Area (sq. ft.) 0.00 Additional Permit Information Mechanical to be Included? .................................... No Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ................. I...................... No Number of Stories ................................................... 2 Permit for Building Shell Only? .............................. No Zoning Designation ................................................. OP No Fixtures Associated With This Permit 11 PERMIT EXPIRES Tuesday, 30 March, 2021 Permit Issued on Thursday, October 1, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. I f 1i Owner or agent Date: 4%, THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 103470 00 Address: 33325 8TH AVE S Project: CITY OF FEDERAL WAY FEDERAL WAY WA 98003-6325 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Fire/Draft Stops (4095) EandFire/Draft :and eduling a Framing inspection; Framing (4120) Approved mbing & Mechanical Rough -in Approved to insulate Stop inspections must be signed - By Date approved. IBC 109.3.4 l By Date 0 Insulation (4150) { Gypsum Wallboard Nailing (4130) ❑ Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Q Final - S K F & R (4060) ❑ Final - Building (4050) Approved C, Approved By Date By 59 Date 2 117/ ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date