20-103470 - Permit FinalCity of Federal Way
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FEDERAL WAY CITY HALL
Project Address: 33325 8TH AVE S
Building - Commercial
Permit #:20-103470-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 926500 0290
Project Description: BLUEBEAIVI - Add glass panels to permit counter; remove existing counter and cabinets at
Finance counter and add a wall with (2) transaction windows and an entry door.
Owner
Applicant
Contractor
Lender
CITY OF FEDERAL WAY
JASON MOORMANCITY OF
OWNER 1S CONTRACTOR
33325 8TH AVE S
FEDERAL WAY - PARKS
FEDERAL WAY WA 98003
33325 8TH AVE S
FEDERAL WAY WA 98003
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
44
Occupancy Class:
Construction Type.
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included? .................................... No
Is this an Online or O.T.C. application? .................. No
Plumbing to be Included? ................. I...................... No
Number of Stories ................................................... 2
Permit for Building Shell Only? .............................. No
Zoning Designation ................................................. OP
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Tuesday, 30 March, 2021
Permit Issued on Thursday, October 1, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
I f 1i
Owner or agent Date:
4%, THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 103470 00 Address: 33325 8TH AVE S
Project: CITY OF FEDERAL WAY FEDERAL WAY WA 98003-6325
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
El Fire/Draft Stops (4095) EandFire/Draft
:and
eduling a Framing inspection; Framing (4120)
Approved mbing & Mechanical Rough -in Approved to insulate
Stop inspections must be signed -
By Date approved. IBC 109.3.4 l By Date
0
Insulation (4150)
{
Gypsum Wallboard Nailing (4130)
❑
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
Q Final - S K F & R (4060) ❑ Final - Building (4050)
Approved C, Approved
By Date By 59 Date 2 117/
❑
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date