20-101611 FINAL PERMITCity of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: VILLAGE AT REDONDO CONDOS BLDG U
Project Address: 28300 18TH AVE S
Building - Multi Family
Permit #:20-101611-00-MF
Inspection Request Line: (253) 835-3050
Parcel Number: 894444 0000
Project Description: ***BLUEBEAM ELECTRONIC REVIEW***
Remove and replace existing windows, doors, cladding and WRB on the rear elevation of the
building. Repair existing balconies and provide new railing.
Owner Applicant Contractor Lender
VILLAGE AT REDONDO LLC DIMENSIONAL BUILDING TATLEY GRUND INC OWNER IS LENDER
6440 HALEY LOOP RD NE CONSULTANTS 1115 N 97TH ST
BAINBRIDGE ISLAND WA 98110
626 120TH AVE NE SUITE B-101 SEATTLE WA 98103
BELLEVUE WA 98005
Census Category: 434 - Residential alt/add - no change in number of units
Includes: 1 2 3 4
Occu anc Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No Number of Stories................................................... 3
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No
Plumbing to be Included? ....................... I ......... .......
No Comprehensive Plan Designation........................... Multifamily
Zoning Designation .............. ._ ...... RM 3600
Total Valuation: 299,931.00
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Wednesday, 4 November, 2020
Permit Issued on Friday, May 8, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
A'
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 101611 00 Address: 28300 18TH AVE S Bldg U
Project: VILLAGE AT REDONDO LLC FEDERAL WAY WA
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q Shear Walls (4245) 0 Roof Sheathing (4220) Fire/Draft Stops (4095)
Approved to install siding Approved to install rooting Approved
By Date By Date By Date
Gypsum Wallboard Nailing (4130) 11 ® Final - Building (4050)
T;,rov dta install mud g talx n
N
j Appmved
Date 9k _1d BY 1Ll,
pSF
Date ,
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date Ry Date