Loading...
20-104455 - Inspection Card31817 48TH CIR SW Unit 01-A FEDERAL WAY WA 98023JUDITH C CLIREHUGH THIS CARD IS TO REMAIN ON-SITE PERMIT #:20 104455 00 Address: Project: Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Construction Inspection Record Rough Electrical Final Electrical Right of Way INSPECTION REQUESTS: (253) 835-3050 Approved By Date Approved By Date By Date Approved 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Initial Erosion Control (4365)Footings/Setback (4110)Foundation Wall (4115) Drainage/Downspout (4040)Re-steel (4215)Slab/Concrete Floor (4255) Underfloor Framing (4285)Floor Sheathing (4105)Shear Walls (4245) Roof Sheathing (4220)Fire/Draft Stops (4095)Interim Erosion Control (4370) Framing (4120)Insulation (4150) Gypsum Wallboard Nailing (4130)Suspended Ceiling Grid (4265)Final - S K F & R (4060) Final Erosion Control (4375)Final - Building (4050) By Date To be done PRIOR to breaking ground By Date Approved to place concrete By Date Approved to place concrete By Date Approved to backfill By Date Approved to place concrete or grout By Date Approved to place concrete By Date Approved to sheath floor By Date Approved to install flooring By Date Approved to install siding By Date Approved to install roofing By Date Approved By Date Approved Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough-in and Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 By Date Approved to insulate By Date Approved to install wallboard By Date Approved to install mud & tape By Date Approved to drop tile By Date Approved By Date Approved By Date Approved 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Initial Erosion Control (4365)Footings/Setback (4110)Foundation Wall (4115) Drainage/Downspout (4040)Re-steel (4215)Slab/Concrete Floor (4255) Underfloor Framing (4285)Floor Sheathing (4105)Shear Walls (4245) Roof Sheathing (4220)Fire/Draft Stops (4095)Interim Erosion Control (4370) Framing (4120)Insulation (4150) Gypsum Wallboard Nailing (4130)Suspended Ceiling Grid (4265)Final - S K F & R (4060) Final Erosion Control (4375)Final - Building (4050) By Date To be done PRIOR to breaking ground By Date Approved to place concrete By Date Approved to place concrete By Date Approved to backfill By Date Approved to place concrete or grout By Date Approved to place concrete By Date Approved to sheath floor By Date Approved to install flooring By Date Approved to install siding By Date Approved to install roofing By Date Approved By Date Approved Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough-in and Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 By Date Approved to insulate By Date Approved to install wallboard By Date Approved to install mud & tape By Date Approved to drop tile By Date Approved By Date Approved By Date Approved