20-104455 - Inspection Card31817 48TH CIR SW Unit 01-A
FEDERAL WAY WA 98023JUDITH C CLIREHUGH
THIS CARD IS TO REMAIN ON-SITE
PERMIT #:20 104455 00 Address:
Project:
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Construction Inspection Record
Rough Electrical Final Electrical Right of Way
INSPECTION REQUESTS: (253) 835-3050
Approved
By Date
Approved
By Date By Date
Approved
1 2 3
4 5 6
7 8 9
10 11 12
13 14
15 16 17
18 19
Initial Erosion Control (4365)Footings/Setback (4110)Foundation Wall (4115)
Drainage/Downspout (4040)Re-steel (4215)Slab/Concrete Floor (4255)
Underfloor Framing (4285)Floor Sheathing (4105)Shear Walls (4245)
Roof Sheathing (4220)Fire/Draft Stops (4095)Interim Erosion Control (4370)
Framing (4120)Insulation (4150)
Gypsum Wallboard Nailing (4130)Suspended Ceiling Grid (4265)Final - S K F & R (4060)
Final Erosion Control (4375)Final - Building (4050)
By Date
To be done PRIOR to breaking ground
By Date
Approved to place concrete
By Date
Approved to place concrete
By Date
Approved to backfill
By Date
Approved to place concrete or grout
By Date
Approved to place concrete
By Date
Approved to sheath floor
By Date
Approved to install flooring
By Date
Approved to install siding
By Date
Approved to install roofing
By Date
Approved
By Date
Approved
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough-in
and Fire/Draft Stop inspections must be signed-
off and approved. IBC 109.3.4 By Date
Approved to insulate
By Date
Approved to install wallboard
By Date
Approved to install mud & tape
By Date
Approved to drop tile
By Date
Approved
By Date
Approved
By Date
Approved
1 2 3
4 5 6
7 8 9
10 11 12
13 14
15 16 17
18 19
Initial Erosion Control (4365)Footings/Setback (4110)Foundation Wall (4115)
Drainage/Downspout (4040)Re-steel (4215)Slab/Concrete Floor (4255)
Underfloor Framing (4285)Floor Sheathing (4105)Shear Walls (4245)
Roof Sheathing (4220)Fire/Draft Stops (4095)Interim Erosion Control (4370)
Framing (4120)Insulation (4150)
Gypsum Wallboard Nailing (4130)Suspended Ceiling Grid (4265)Final - S K F & R (4060)
Final Erosion Control (4375)Final - Building (4050)
By Date
To be done PRIOR to breaking ground
By Date
Approved to place concrete
By Date
Approved to place concrete
By Date
Approved to backfill
By Date
Approved to place concrete or grout
By Date
Approved to place concrete
By Date
Approved to sheath floor
By Date
Approved to install flooring
By Date
Approved to install siding
By Date
Approved to install roofing
By Date
Approved
By Date
Approved
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough-in
and Fire/Draft Stop inspections must be signed-
off and approved. IBC 109.3.4 By Date
Approved to insulate
By Date
Approved to install wallboard
By Date
Approved to install mud & tape
By Date
Approved to drop tile
By Date
Approved
By Date
Approved
By Date
Approved