Loading...
20-103541 permit tfe Building - Commercial City of Federal Way Permit #:20-103541-00-COCommunityDevelopmentDept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: COVID 19 VACCINE STUDY TRAILER B Project Address: 2141 S 314TH ST Parcel Number:092104 9017 Project Description: BLUEBEAM- Installation of temporary factory-assembled office trailer,including stairs, landings and ramps. Building to be self-contained with water and waste tanks,and powered by generator(separate permit). Owner Applicant Contractor Lender CITY OF FEDERAL WAY JOHN NGUYENARKEL CONTRERAS RENOVATIONS LLC US DEPARTMENT OF DEFENSE 33325 8TH AVE S INTERNATIONAL 350 S 312TH ST FEDERAL WAY WA 98023 1055 CONVENTION ST FEDERAL WAY WA 98003 BATON ROUGE LA 70802 Census Category: 437-Commercial alt/add/conversion Includes: 1 2 3 4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) 0.00 Additional Permit Information New/Additional Sq.Feet-1st Floor 636 New/Additional Sq.Feet-2nd Floor 0 New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0 New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 0 Mechanical to be Included? No Number of Stories 1 New/Additional Sq.Feet-Other 0 Is this an Online or O.T.C.application? No Permit for Building Shell Only? No Plumbing to be Included?No New/Additional Sq.Feet-Total 636 Occupancy#1-Use Professional Services/Offices Total Valuation:3,784.20 1,40;',,` 9 T X' r i R Nin PERMIT EXPIRES Monday, 12 April,2021 Permit Issued on Wednesday,October 14,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: FILEI..Date: 024 THIS CARD IS TO REMAIN ON-SITE FeCITY deral Way Construction Inspection Record y INSPECTION REQUESTS:(253)835-3050 PERMIT#:20 103541 00 Address: 2141 S 314TH ST Project:CITY OF FEDERAL WAY FEDERAL WAY WA 98003-5621 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. V Initial Erosion Control(4365) ®Footings/Setback(4110) 1 ®Foundation Wall(4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date 1•By Date Drainage/Downspout(4040) 1 ® Re-steel(4215)Slab/Concrete Floor(4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date Underfloor Framing(4285) i ® Floor Sheathing(4105) Shear Walls(4245) Approved to sheath floor Approved to install flooring I Approved to install siding By Date By Date By Date Roof Sheathing(4220) 0 Fire/Draft Stops(4095) El Interim Erosion Control(4370) , Approved to install roofing Approved Approved I By Date By Date By Date Prior to scheduling a Framing inspection; tEl Framing(4120) El Insulation(4150) Electrical,Plumbing&Mechanical Rough-in Approved to insulate Approved to install wallboardandFire/Draft Stop inspections must be signed- off and approved. IBC 1093.4 By Date By Date El Gypsum Wallboard Nailing(4130) 1 I:ISuspended Ceiling Grid(4265) El Final-S K F&R(4060) Approved to install mud&tape Approved to drop tile Approved j By Date 1 By Date By Date as Final-Planning El Final-Public Works(4080) ; ® Final Erosion Control(4375) Approved Approved Approved By Date By Date By Date Final-Building(4050) Approved By l l7r' Date II 11.--1 El Rough Electrical Final ElectricalElRight of Way Approved Approved Approved By Date By Date By Date