20-102858-Inspection Card30913 6TH LN SW
FEDERAL WAY WA 98023WILLIAM J MCCAFFREY
THIS CARD IS TO REMAIN ON-SITE
PERMIT #:20 102858 00 Address:
Project:
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Construction Inspection Record
Rough Electrical Final Electrical Right of Way
INSPECTION REQUESTS: (253) 835-3050
Approved
By Date
Approved
By Date By Date
Approved
1 2 3
4 5 6
7 8 9
10 11 12
13 14 15
16 17
18 19 20
21 22 23
SWM Precon Site Mtg (4400)Initial Erosion Control (4365)Footings/Setback (4110)
Foundation Wall (4115)Drainage/Downspout (4040)Plumbing Groundwork (4190)
Slab/Concrete Floor (4255)Underfloor Framing (4285)Floor Sheathing (4105)
Shear Walls (4245)Roof Sheathing (4220)Rough Plumbing (4230)
Mechanical Rough-in (4165)Gas Piping (4125)Fire/Draft Stops (4095)
Interim Erosion Control (4370)Framing (4120)
Insulation (4150)Gypsum Wallboard Nailing (4130)Final Erosion Control (4375)
Final - Mechanical (4065)Final - Plumbing (4075)Final - Building (4050)
By Date
Approved
By Date
To be done PRIOR to breaking ground
By Date
Approved to place concrete
By Date
Approved to place concrete
By Date
Approved to backfill
By Date
Approved to cover
By Date
Approved to place concrete
By Date
Approved to sheath floor
By Date
Approved to install flooring
By Date
Approved to install siding
By Date
Approved to install roofing
By Date
Approved
By Date
Approved
By Date
Approved to release test
By Date
Approved
By Date
Approved
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough-in
and Fire/Draft Stop inspections must be signed-
off and approved. IBC 109.3.4 By Date
Approved to insulate
By Date
Approved to install wallboard
By Date
Approved to install mud & tape
By Date
Approved
By Date
Approved
By Date
Approved
By Date
Approved
1 2 3
4 5 6
7 8 9
10 11 12
13 14 15
16 17
18 19 20
21 22 23
SWM Precon Site Mtg (4400)Initial Erosion Control (4365)Footings/Setback (4110)
Foundation Wall (4115)Drainage/Downspout (4040)Plumbing Groundwork (4190)
Slab/Concrete Floor (4255)Underfloor Framing (4285)Floor Sheathing (4105)
Shear Walls (4245)Roof Sheathing (4220)Rough Plumbing (4230)
Mechanical Rough-in (4165)Gas Piping (4125)Fire/Draft Stops (4095)
Interim Erosion Control (4370)Framing (4120)
Insulation (4150)Gypsum Wallboard Nailing (4130)Final Erosion Control (4375)
Final - Mechanical (4065)Final - Plumbing (4075)Final - Building (4050)
By Date
Approved
By Date
To be done PRIOR to breaking ground
By Date
Approved to place concrete
By Date
Approved to place concrete
By Date
Approved to backfill
By Date
Approved to cover
By Date
Approved to place concrete
By Date
Approved to sheath floor
By Date
Approved to install flooring
By Date
Approved to install siding
By Date
Approved to install roofing
By Date
Approved
By Date
Approved
By Date
Approved to release test
By Date
Approved
By Date
Approved
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough-in
and Fire/Draft Stop inspections must be signed-
off and approved. IBC 109.3.4 By Date
Approved to insulate
By Date
Approved to install wallboard
By Date
Approved to install mud & tape
By Date
Approved
By Date
Approved
By Date
Approved
By Date
Approved