Loading...
20-104287-CO - Planset Set 10-30-2020 V1LAKE344THST.KILLARNEYLAKE#142AEXIT#142BEXITSEATTLEAUBURN/I-90TACOMA CAMPUSCORPORATEWEYERHAUSERNORTH LAKEWAY SOUTHS. STATE ROUTE 18 SOUTH 336TH STREETINTERSTATE HIGHWAY 5WEYERHAUESER S. 337th ST.WEYERHAEUSER WAY S.S.P. 08240639.67'199.81'S T A T E ROU T E 1 8 Plot Date: 9/18/2020 2:50 PM File Name: U:\Proj\MJR Development Inc\WA\Falcon Bldg\20.0000695.000-Prologis - Falcon Bldg\DRAWINGS\A-I\3_CD\MJR-FAL-PROLOGIS AN-0_COVER-2019.dwg User: VERNITA LYTLE Device: _AUTOCAD PDF (GENERAL DOCUMENTATION).PC3 Pen Table: _NELSON-FULL.CTB Paper Size:ARCH FULL BLEED D (24.00 X 36.00 INCHES)DRAWING INDEXSHEETNUMBERSHEET TITLESHEETISSUEDATEREVISIONNUMBERREVISIONISSUEDATEAN-0COVER SHEETAN-1LIFE SAFETY PLANAN-2GENERAL NOTES, ABBREVIATIONS & SYMBOLSAN-3ACCESSIBILITY DETAILSARCHITECTURALA0-1DEMOLITION & REFLECTED DEMOLITIONCEILING PLANSA1-1CONSTRUCTION PLANA2-1REFLECTED CEILING & ENLARGED PLANSA2-2WSEC NONRESIDENTIAL LIGHTING_TAL-USDAA3-1POWER AND COMMUNICATION PLANA4-1FINISH PLAN AND SCHEDULEA7-1RECEPTION ELEVATIONSA7-2ELEVATIONSA8-1CASEWORK DETAILSA9-1DOOR SCHEDULE, DOOR, RELITE, FRAME TYPES& DETAILSA9-2PARTITION TYPESA9-3TYPICAL CEILING DETAILS (FOR REFERENCE)A9-4TYPICAL CEILING DETAILS (FOR REFERENCE)A9-5DOOR AND WINDOW DETAILSCOVER SHEETAN-0PROLOGISTENANT IMPROVEMENTFALCON BUILDING, SUITE 10133930 WEYERHAEUSER WAY SOUTH,FEDERAL WAY, WA 98001BUILDING INFORMATIONSITE ADDRESS:33930 WEYERHAEUSER WAY SOUTH, FEDERAL WAY, WA 98001PARCEL NUMBER:215466-0020LEGAL DESCRIPTION:EAST CAMPUS CORP PRK PRCL 3-BSP TGW UND INT IN TRACTS B,C& D PER FEDERAL WAY BLA # 19-101124-00-SU REC #20190624900005PLat Block:Plat Lot: 1-2ZONING:OP-1BUILDING DESCRIPTION:3 STORIES MASONRY OFFICE BUILDING WITH EXTERIORADEQUATE PARKING.YEAR BUILT:1999 - PER JURISDICTIONAL RECORDCONSTRUCTION TYPE:III-AFIRE PROTECTION:FULLY SPRINKLERED (NO CHANGES)NUMBER OF STORIES3 (NO CHANGES)BUILDING TOTAL FLOOR AREA:65,245 SF (NO CHANGES) - PER COUNTY RECORDSSANCTUARY CAMPUS33930 WEYERHAEUSER WAY SOUTH,FEDERAL WAY, WA 98001FALCON BUILDINGScale:1LOCATION MAPAN-0NOT TO SCALEScale:2SITE MAPAN-0NOT TO SCALEPROJECT DESCRIPTIONTENANT IMPROVEMENT ON THE 1ST FLOOR OF AN EXISTING OFFICE (SUITE 101) TO INCLUDE:REMOVAL OF EXISTING CEILING GRID AND FIXTURES. CONSTRUCTION OF NEW INTERIORPARTITIONS, DOORS AND CASEWORK.MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION AND LIFE SAFETY ALTERATIONS ARE BYOTHERS, UNDER SEPARATE PERMITS BY DESIGN / BUILD CONTRACTORS - DEFERRED SUBMITTALS.AREA OF WORKFLOOR AREAFLR # 1±4,473 SF23,901 SF (NO CHANGES)APPLICABLE CODES2015 INTERNATIONAL BUILDING CODE (IBC)2015 INTERNATIONAL RESIDENTIAL CODE (IRC)2015 INTERNATIONAL EXISTING BUILDING CODE (IEBC)2015 INTERNATIONAL FIRE CODE (IFC)2015 INTERNATIONAL MECHANICAL CODE (IMC)2015 INTERNATIONAL FUEL GAS CODE (IFGC)2015 UNIFORM PLUMBING CODE (UPC)2015 NATIONAL FUEL GAS CODE 58 (PROPANE)2017 NATIONAL ELECTRICAL CODE (NEC)2015 WASHINGTON STATE ENERGY CODES (IECC)ICC/ANSI A117.1-2009 ACCESSIBLE AND USABLE BUILDING AND FACILITIESCOVID-19 DISCLAIMERTHESE DRAWINGS DO NOT REFLECT THE GUIDELINES SET FORTH BY THE WORLD HEALTHORGANIZATION AND CENTER FOR DISEASE CONTROL OR OTHER GOVERNMENTAL AGENCYGUIDELINES RELATED TO COVID-19.Proj. #:Drawn By:Reviewed By:SEAL:MJR DEVELOPMENTNelco Architecture, Inc.CLIENT:PROJECT:CITY STAMP:1625 116TH AVE NE, SUITE 100KIRKLAND, WA 980331200 Fifth Ave., Suite 1300Seattle, WA 98101Phone: (206) 408-8500WWW.NELSONWORLDWIDE.COMPROJECT DIRECTORY:Tenant:PROLOGISAttn: SAM FUNSINN, PROJECT MANAGERTel: 206.414.7604 Email: sfunsinn@prologis.comBuilding Representative:MJR DEVELOPMENTAttn: Christian LaRoccoTel: 206.255.0586Email: CHRISTIAN@MJRDEVELOPMENT.COMArchitect:NELSON WORLDWIDEAttn: MARK DAMRELTel: 408.497.8318Email: MDAMREL@NelsonWW.comAttn: BRITTANY TOSHITel: 206.408.8527Email: BTOSHI@NelsonWW.comMDFALCON BUILDINGPROLOGISTENANT IMPROVEMENT33930 WEYERHAEUSER WAY SOUTHFEDERAL WAY, WA 9800120.0000695.000BMT/Date:No:Description:BID SET / CLIENT REVIEW09/18/2020CLIENT REVIEW10/13/2020BID SET / CLIENT REVIEW10/27/2020ISSUE FOR PERMIT10/30/2020100RECEIVEDCITY OF FEDERAL WAY COMMUNITY DEVELOPMENTNov 04 2020