Loading...
21-100866 - Permit FinalCity of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: RUBY MATTI CARING PROFESSIONALS AFH Project Address: 30017 13TH AVE S Project Description: BLUEBEAM - Construct ramp. Owner CAROLINE PRICE 30042 14TH AVE S FEDERAL WAY WA 98003 Applicant CAROLINE PRICE 30042 14TH AVE S FEDERAL WAY WA 98003 Building - Single Family Permit 4:21-100866-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 025300 0335 Contractor I Lender OWNER IS CONTRACTOR Census Category: 434 - Residential alt/add - no change in number of units Includes: occupancy Class: # 1 92 #3 #4 Construction Type: Occupancy Load: Floor Area (sci. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Number of Stories................................................... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included?..............,......................,,. No Total Valuation: 4,200.00 No Fixtures Associated With This Permit II PERMIT EXPIRES Wednesday, 13 October, 2021 Permit Issued on Friday, April 16, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _; Date: -4k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100866 00 Address: 30017 13TH AVE S Project: CAROLINE PRICE FEDERAL WAY WA 98003-4130 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSIs THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are loggedonthe back of this card. Footings/Setback (4110) � I Foundation Wall (4115) tJ Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date ❑ Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ❑ Shear Walls (4245) ❑ Roof Sheathing (4220) ❑ Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Prior to scheduling a Framing inspection; `lei Framing (4120) Z Insulation (4150) L�Fire�/Drfft ic, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard Stop inspections must be signed- f and approved. IBC 109.3.4 By Date By Date El Gypsum Wallboard Nailing (4130) © Final - Building (4050) Approved to install mud & tape Approved By Date By !7t" Date: 41,23170 ❑ Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date