Loading...
21-104105-Geotechnical Report-10-06-2021-V1EarthSolutionsNWLLC EarthSolutions NW LLC 15365 N.E. 90th Street, Suite 100 Redmond, WA98052 (425) 449-4704 Fax (425) 449-4711 www.earthsolutionsnw.com Geotechnical Engineering Construction Observation/Testing Environmental Services PRELIMINARY GEOTECHNICAL ENGINEERING STUDY TWIN TRAILS RESIDENTIAL SUBDIVISION 1605 SOUTHWEST 341ST PLACE FEDERAL WAY, WASHINGTON ES-7961 PREPARED FOR PROSPECT DEVELOPMENT, LLC August 23, 2021 Updated September 13, 2021 __________________________ Scott S. Riegel, L.G., L.E.G. Senior Project Manager __________________________ Kyle R. Campbell, P.E. Principal Engineer PRELIMINARY GEOTECHNICAL ENGINEERING STUDY TWIN TRAILS RESIDENTIAL SUBDIVISION 1605 SOUTHWEST 341ST PLACE FEDERAL WAY, WASHINGTON ES-7961 Earth Solutions NW, LLC 15365 Northeast 90th Street, Suite 100 Redmond, Washington 98052 Phone: 425-449-4704 | Fax: 425-449-4711 www.earthsolutionsnw.com 09/13/2021 Geotechnical-Engineering Report Important Information about This Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) has prepared this advisory to help you – assumedly a client representative – interpret and apply this geotechnical-engineering report as effectively as possible. In that way, you can benefit from a lowered exposure to problems associated with subsurface conditions at project sites and development of them that, for decades, have been a principal cause of construction delays, cost overruns, claims, and disputes. If you have questions or want more information about any of the issues discussed herein, contact your GBA-member geotechnical engineer. Active engagement in GBA exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Understand the Geotechnical-Engineering Services Provided for this Report Geotechnical-engineering services typically include the planning, collection, interpretation, and analysis of exploratory data from widely spaced borings and/or test pits. Field data are combined with results from laboratory tests of soil and rock samples obtained from field exploration (if applicable), observations made during site reconnaissance, and historical information to form one or more models of the expected subsurface conditions beneath the site. Local geology and alterations of the site surface and subsurface by previous and proposed construction are also important considerations. Geotechnical engineers apply their engineering training, experience, and judgment to adapt the requirements of the prospective project to the subsurface model(s). Estimates are made of the subsurface conditions that will likely be exposed during construction as well as the expected performance of foundations and other structures being planned and/or affected by construction activities. The culmination of these geotechnical-engineering services is typically a geotechnical-engineering report providing the data obtained, a discussion of the subsurface model(s), the engineering and geologic engineering assessments and analyses made, and the recommendations developed to satisfy the given requirements of the project. These reports may be titled investigations, explorations, studies, assessments, or evaluations. Regardless of the title used, the geotechnical-engineering report is an engineering interpretation of the subsurface conditions within the context of the project and does not represent a close examination, systematic inquiry, or thorough investigation of all site and subsurface conditions. Geotechnical-Engineering Services are Performed for Specific Purposes, Persons, and Projects, and At Specific Times Geotechnical engineers structure their services to meet the specific needs, goals, and risk management preferences of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil-works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. Likewise, geotechnical-engineering services are performed for a specific project and purpose. For example, it is unlikely that a geotechnical- engineering study for a refrigerated warehouse will be the same as one prepared for a parking garage; and a few borings drilled during a preliminary study to evaluate site feasibility will not be adequate to develop geotechnical design recommendations for the project. Do not rely on this report if your geotechnical engineer prepared it: • for a different client; • for a different project or purpose; • for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations. Note, too, the reliability of a geotechnical-engineering report can be affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying the recommendations in it. A minor amount of additional testing or analysis after the passage of time – if any is required at all – could prevent major problems. Read this Report in Full Costly problems have occurred because those relying on a geotechnical- engineering report did not read the report in its entirety. Do not rely on an executive summary. Do not read selective elements only. Read and refer to the report in full. You Need to Inform Your Geotechnical Engineer About Change Your geotechnical engineer considered unique, project-specific factors when developing the scope of study behind this report and developing the confirmation-dependent recommendations the report conveys. Typical changes that could erode the reliability of this report include those that affect: • the site’s size or shape; • the elevation, configuration, location, orientation, function or weight of the proposed structure and the desired performance criteria; • the composition of the design team; or • project ownership. As a general rule, always inform your geotechnical engineer of project or site changes – even minor ones – and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered. Most of the “Findings” Related in This Report Are Professional Opinions Before construction begins, geotechnical engineers explore a site’s subsurface using various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing is performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgement to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ – maybe significantly – from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team through project completion to obtain informed guidance quickly, whenever needed. This Report’s Recommendations Are Confirmation-Dependent The recommendations included in this report – including any options or alternatives – are confirmation-dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgement and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions exposed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation-dependent recommendations if you fail to retain that engineer to perform construction observation. This Report Could Be Misinterpreted Other design professionals’ misinterpretation of geotechnical- engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a continuing member of the design team, to: • confer with other design-team members; • help develop specifications; • review pertinent elements of other design professionals’ plans and specifications; and • be available whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction- phase observations. Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can shift unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you’ve included the material for information purposes only. To avoid misunderstanding, you may also want to note that “informational purposes” means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect. Read Responsibility Provisions Closely Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. This happens in part because soil and rock on project sites are typically heterogeneous and not manufactured materials with well-defined engineering properties like steel and concrete. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The personnel, equipment, and techniques used to perform an environmental study – e.g., a “phase-one” or “phase-two” environmental site assessment – differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical-engineering report does not usually provide environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not obtained your own environmental information about the project site, ask your geotechnical consultant for a recommendation on how to find environmental risk-management guidance. Obtain Professional Assistance to Deal with Moisture Infiltration and Mold While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, the engineer’s services were not designed, conducted, or intended to prevent migration of moisture – including water vapor – from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material-performance deficiencies. Accordingly, proper implementation of the geotechnical engineer’s recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building-envelope or mold specialists on the design team. Geotechnical engineers are not building-envelope or mold specialists. Copyright 2019 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent or intentional (fraudulent) misrepresentation. Telephone: 301/565-2733 e-mail: info@geoprofessional.org www.geoprofessional.org August 23, 2021 Updated September 13, 2021 ES-7961 Prospect Development, LLC 2913 – 5th Avenue Northeast, Suite 201 Puyallup, Washington 98372 Attention: Mr. Justin Holland Dear Mr. Holland: Earth Solutions NW, LLC (ESNW) is pleased to present this preliminary report that supports the current project. Based on the results of our investigation, construction of the proposed residential subdivision is feasible from a geotechnical standpoint. Our study indicates the site is underlain primarily by glacially consolidated soils with areas of outwash type deposits. This update includes the current site plan. In general, typical residences up to three stories in height may be supported on conventional continuous and spread footing foundations bearing on competent native soil, recompacted native soil, or new structural fill placed directly on competent native soil. In general, competent native soil, suitable for support of the new foundations, will likely be encountered beginning at depths of about two to four feet below the existing ground surface. Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, compaction of soils to the specifications of structural fill, or overexcavation and replacement with suitable structural fill, will be necessary. Because no design details were available at the time of this report, ESNW should review the project details to confirm the recommendations in this report are applicable. Infiltration is feasible in the northeastern portion of the site (TP-1 through TP-3) where outwash type soils were encountered at depth. Infiltration facilities planned for this site must expose the clean outwash sand and gravel soils across the entirety of the system. We appreciate the opportunity to be of service to you on this project. If you have questions regarding the content of this geotechnical engineering study, please contact us. Sincerely, EARTH SOLUTIONS NW, LLC Scott S. Riegel, L.G., L.E.G. Senior Project Manager 15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 •(425) 449-4704 • FAX (425) 449-4711 Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services Earth Solutions NW, LLC Table of Contents ES-7961 PAGE INTRODUCTION ................................................................................. 1 General..................................................................................... 1 Project Description ................................................................. 1 SITE CONDITIONS ............................................................................. 2 Surface ..................................................................................... 2 Subsurface .............................................................................. 2 Topsoil and Fill ............................................................. 2 Native Soil ..................................................................... 3 Geologic Setting ........................................................... 3 Groundwater ................................................................. 3 GEOLOGICALLY HAZARDOUS AREAS ........................................... 3 DISCUSSION AND RECOMMENDATIONS ....................................... 3 General..................................................................................... 3 Site Preparation and Earthwork ............................................. 4 Temporary Erosion Control ......................................... 4 Stripping ....................................................................... 5 Excavations and Slopes .............................................. 5 In-situ and Imported Soils ........................................... 5 Wet-Season Grading .................................................... 6 Structural Fill ................................................................ 6 Foundations ............................................................................ 6 Seismic Design ....................................................................... 7 Slab-on-Grade Floors ............................................................. 8 Retaining Walls ....................................................................... 8 Landscape Retaining Walls ......................................... 9 Drainage................................................................................... 9 Infiltration Evaluation ................................................... 9 Utility Support and Trench Backfill ....................................... 10 Preliminary Pavement Sections ............................................. 10 LIMITATIONS ...................................................................................... 11 Additional Services ................................................................. 11 Earth Solutions NW, LLC Table of Contents Cont’d ES-7961 GRAPHICS Plate 1 Vicinity Map Plate 2 Test Pit Location Plan Plate 3 Retaining Wall Drainage Detail Plate 4 Footing Drain Detail APPENDICES Appendix A Subsurface Exploration Test Pit Logs Appendix B Laboratory Test Results Earth Solutions NW, LLC PRELIMINARY GEOTECHNICAL ENGINEERING STUDY TWIN TRAILS RESIDENTIAL SUBDIVISION 1605 SOUTHWEST 341ST PLACE FEDERAL WAY, WASHINGTON ES-7961 INTRODUCTION General This preliminary geotechnical engineering study (study) was prepared for the proposed residential development to be constructed off the south side of Southwest 341st Place near 16th Avenue Southwest in Federal Way, Washington. The purpose of this study was to develop geotechnical recommendations for the proposed project. The scope of services for completing this study included the following:  Subsurface exploration consisting of test pit excavations;  Laboratory testing of soil samples collected at the test pit locations;  Engineering analyses and recommendations for the proposed development, and;  Preparation of this report. The following documents and maps were reviewed as part of preparing this study:  Preliminary Site Plan, Sheet PP-03 and PP-04, prepared by ESM Consulting Engineers dated September 3, 2021;  Geologic Map of the Poverty Bay 7.5’ Quadrangle, King County, Washington, prepared by Tabor, et al, 2014;  Federal Way Municipal Code (FWMC) section19.145 Environmentally Critical Areas, and;  Web Soil Survey (WSS), provided by the United States Department of Agriculture (USDA), Natural Resources Conservation Service. Project Description Based on review of the referenced site plan, the subject site will be developed with 38 detached residential lots, access roadways, a stormwater detention tract and utility improvements. The stormwater tract will be located in the northern portion of the site. Prospect Development, LLC ES-7961 August 23, 2021 Page 2 Updated September 13, 2021 Earth Solutions NW, LLC Based on existing grades, we anticipate mass grading activities will include minor cuts and fills of up to about seven feet. Perimeter footing loads will likely be 1 to 2 kips per lineal foot. Slab- on-grade loading is anticipated to be approximately 150 pounds per square foot (psf). The referenced plan indicates a stormwater infiltration pond will be constructed in the northern portion of the site where outwash soils were encountered during our fieldwork. The pond base will be excavated at least seven feet below existing grade to expose outwash soils and will use a combination of cut and fill berms. If the above design assumptions are incorrect or change, ESNW should be contacted to review the recommendations provided in this report. ESNW should review final designs to confirm that our geotechnical recommendations have been incorporated into the plans. SITE CONDITIONS Surface The subject site is located off the south side Southwest 341st Place in Federal Way, Washington. The approximate location of the property is illustrated on Plate 1 (Vicinity Map). The site consists of two adjoining tax parcels (King County Parcel Numbers 2421039051 and the east half of 2421039008). The property at 1605 Southwest 341 st Place is occupied by a residence, outbuildings and landscaping in the northeastern portion of the site, but is otherwise forested. The site topography generally descends gently to the west and north from the southeastern portion of the property with about 30 feet of total elevation change. Subsurface A representative of ESNW observed, logged, and sampled eight test pits excavated across the overall project area, on May 28, 2021 using a trackhoe and operator provided by the client. The test pits were completed for purposes of assessing soil conditions, classifying site soils, and characterizing near-surface groundwater conditions within the overall development area. The approximate locations of the test pits are depicted on Plate 2 (Test Pit Location Plan). Please refer to the test pit logs provided in Appendix A for a more detailed description of subsurface conditions. Representative soil samples collected at the test pit locations were analyzed in general accordance with Unified Soil Classification System (USCS) and USDA methods and procedures. Topsoil and Fill Topsoil (where encountered) generally extended to depths of ranging from about two to eight inches below the existing ground surface (bgs). The topsoil was characterized by the observed dark brown color, the presence of fine organics, and root intrusions extending into the shallow, weathered soils. Fill was not encountered during our exploration; however, fill is likely present near the existing development areas of the site. Prospect Development, LLC ES-7961 August 23, 2021 Page 3 Updated September 13, 2021 Earth Solutions NW, LLC Native Soil Underlying topsoil, native soils encountered on the subject site were consisting primarily of silty sand with gravel (USCS: SM) that extended to the maximum exploration depth of about nine and one-half feet except test pit locations TP-1 through TP-3. At test pit locations TP-1 through TP- 3, underlying about five to six feet of silty sand, we encountered medium dense to dense, outwash-type sand and gravel deposits (USCS: SP and GW-GM) that extended to the termination depths of the test pits. Geologic Setting The referenced geologic map resource identifies ice contact (Qvi) deposits as the primary geologic unit underlying the site and surrounding areas. The referenced WSS map resource identifies Alderwood gravelly sandy loam (Map Unit Symbol: AgC) across the property. The Alderwood series soils formed in glacial till plains. Based on our field observations, the majority of the native soils encountered during our fieldwork are consistent with ice contact deposits, and the sandy soils encountered below the glacially consolidated cap within test pit locations TP-1 through TP-3 are consistent with outwash deposits. Groundwater During our subsurface exploration completed on May 2021, groundwater seepage was not encountered at the test pit locations. However, perched seepage should be expected within the weathered zone of soils on this site depending on the time of year grading occurs. In general, groundwater flow rates and elevations are higher during the winter, spring, and early summer months. GEOLOGICALLY HAZARDOUS AREAS Based on our review of the referenced Federal Way municipal code section and site conditions encountered during our fieldwork, there are no geologic hazard areas (erosion, landslide, seismic, or mine hazards) on or within 300 feet of the subject site. Standard development BMPs may be used for this site development plans. DISCUSSION AND RECOMMENDATIONS General Based on the results of our investigation, construction of typical single-family residences on this site is feasible from a geotechnical standpoint. The primary geotechnical considerations associated with the proposed development include site grading, infiltration facility construction, foundation support, slab-on-grade subgrade support, and the suitability of using on-site soils as structural fill. Prospect Development, LLC ES-7961 August 23, 2021 Page 4 Updated September 13, 2021 Earth Solutions NW, LLC Typical single-family residences may be supported on conventional continuous and spread footing foundations bearing on competent native soil, recompacted native soil, or new structural fill placed directly on competent native soil. In general, competent native soil, suitable for support of the new foundations, will likely be encountered beginning at depths of about two to four feet bgs. Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, compaction of soils to the specifications of structural fill, or overexcavation and replacement with suitable structural fill, will be necessary. ESNW should review the proposed plans to confirm the recommendations in this report remain applicable. The relatively clean sand and gravel deposits encountered at test pit locations TP-1 through TP- 3 are suitable for infiltration but in-situ testing will be required to determine the infiltration rate for formal designs. Due to the low infiltration capacity of the glacially consolidated soils on this site, infiltration is not recommended for the southern portion of the development area. This study has been prepared for the exclusive use of Prospect Development, LLC, and their representatives. A warranty is neither expressed nor implied. This study has been prepared in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. Site Preparation and Earthwork Initial site preparation activities will consist of installing temporary erosion control measures, establishing grading limits, removing structural improvements, and clearing and stripping the site. Subsequent earthwork activities will involve site grading and related infrastructure improvements. Temporary Erosion Control The following temporary erosion control measures are offered:  Temporary construction entrances and drive lanes, consisting of at least six inches of quarry spalls, should be considered to both minimize off-site soil tracking and provide a stable access entrance surface. Placing geotextile fabric underneath the quarry spalls will provide greater stability, if needed.  Silt fencing should be placed around the site perimeter.  When not actively graded, soil stockpiles should be covered or otherwise protected.  Temporary measures for controlling surface water runoff, such as interceptor trenches, sumps, or swales, should be installed prior to beginning earthwork activities.  Dry soils disturbed during construction should be wetted to minimize dust and airborne soil erosion. Additional Best Management Practices (BMPs), as specified by the project civil engineer and indicated on the plans, should be incorporated into construction activities. Temporary erosion control measures should be actively managed and may be modified during construction as site conditions require, to ensure proper performance. Prospect Development, LLC ES-7961 August 23, 2021 Page 5 Updated September 13, 2021 Earth Solutions NW, LLC Stripping Topsoil was generally encountered within the upper approximately four to eight inches at the test pit locations. The organic-rich topsoil should be stripped and segregated into a stockpile for later use on site or to haul off site. The material remaining immediately below the topsoil may have some root zones and will likely be variable in composition, density, and/or moisture content. The material exposed after initial topsoil stripping will likely not be suitable for direct structural support as is and will likely need to be compacted in place or stripped and stockpiled for reuse as fill; depending on the time of year stripping occurs, the soil exposed below the topsoil may be too wet to compact and may need to be aerated or treated. ESNW should observe initial stripping activities to provide recommendations regarding stripping depths and material suitability. Excavations and Slopes Based on the soil conditions observed at the subsurface exploration locations, the maximum allowable temporary slope inclinations provided below may be used. The applicable Federal Occupation Safety and Health Administration and Washington Industrial Safety and Health Act soil classifications are also provided.  Areas exposing groundwater seepage 1.5H:1V (Type C)  Loose soil; fill 1.5H:1V (Type C)  Medium dense to dense native soil 1H:1V (Type B) Permanent slopes should be planted with vegetation to both enhance stability and minimize erosion. The presence of perched groundwater may cause localized sloughing of temporary slopes. An ESNW representative should observe temporary and permanent slopes to confirm the slope inclinations are suitable for the exposed soil conditions and to provide additional excavation and slope recommendations as necessary. If the recommended temporary slope inclinations cannot be achieved, temporary shoring may be necessary to support excavations. In-situ and Imported Soils The majority of the near-surface soils encountered during our subsurface exploration have a high sensitivity to moisture and were generally in a damp to moist condition at the time of the exploration (May 2021). Exposed soils will degrade rapidly if exposed to wet weather and/or construction traffic. In general, soils encountered during site excavations that are excessively over the optimum moisture content will require aeration or treatment prior to placement and compaction. Conversely, soils that are substantially below the optimum moisture content will require moisture conditioning through the addition of water prior to use as structural fill. A representative of ESNW should determine the suitability of in-situ soils for use as structural fill at the time of construction. Prospect Development, LLC ES-7961 August 23, 2021 Page 6 Updated September 13, 2021 Earth Solutions NW, LLC Imported soil intended for use as structural fill should consist of a well-graded, granular soil with a moisture content that is at (or slightly above) the optimum level. During wet weather conditions, imported soil intended for use as structural fill should consist of a well-graded, granular soil with a fines content of 5 percent or less (where the fines content is defined as the percent passing the Number 200 sieve, based on the minus three-quarter-inch fraction). Wet-Season Grading Because the site soils are highly sensitive to moisture, grading during the rainy season will be very difficult. If grading takes place during the winter, spring, or early summer months, a contingency in the project budget should be included to allow for export of native soil and import of structural fill. Structural Fill Structural fill is defined as compacted soil placed in foundation, slab-on-grade, roadway, permanent slope, retaining wall, utility trench, and vault backfill areas. Soils placed in structural areas should consist of a granular material devoid of deleterious debris and organics, placed in loose lifts of 12 inches or less and compacted to a relative compaction of 95 percent, based on the laboratory maximum dry density as determined by the Modified Proctor Method (ASTM D- 1557). Foundations Typical two to three story residential structures may be supported on conventional spread and continuous footings bearing on competent native soil, recompacted native soil, or new structural fill placed directly on competent native soil. In general, competent native soil suitable for the support of foundations will likely be encountered at depths of about two to four feet bgs. ESNW should evaluate the design subgrade conditions to confirm suitable conditions are exposed and to provide additional preparation recommendations, where necessary. Where loose, organic, or otherwise unsuitable soil conditions are observed at foundation subgrade elevations, compaction of the soils to the specifications of structural fill, or overexcavation and replacement with granular structural fill, will likely be necessary. Provided residential structures will be supported as described above, the following parameters can be used for design of the new foundations:  Allowable soil bearing capacity 2,500 psf  Passive earth pressure 300 pcf (equivalent fluid)  Coefficient of friction 0.40 The passive earth pressure and coefficient of friction values include a safety factor of 1.5. A one- third increase in the allowable soil bearing capacity may be assumed for short-term wind and seismic loading conditions. With structural loading as expected, total settlement in the range of 1 inch is anticipated, with differential settlement of about 0.5 inch. The majority of settlement should occur during construction, as dead loads are applied. Prospect Development, LLC ES-7961 August 23, 2021 Page 7 Updated September 13, 2021 Earth Solutions NW, LLC Seismic Design The 2018 International Building Code (2018 IBC) recognizes the most recent edition of the Minimum Design Loads for Buildings and Other Structures manual (ASCE 7-16) for seismic design, specifically with respect to earthquake loads. Based on the soil conditions encountered at the boring locations, the parameters and values provided below are recommended for seismic design per the 2018 IBC. Parameter Value Site Class D* Mapped short period spectral response acceleration, S S (g) 1.336 Mapped 1-second period spectral response acceleration, S 1 (g) 0.459 Short period site coefficient, Fa 1 Long period site coefficient, Fv 1.86 Adjusted short period spectral response acceleration, S MS (g) 1.336 Adjusted 1-second period spectral response acceleration, S M1 (g) 0.854 Design short period spectral response acceleration, S DS (g) 0.891 Design 1-second period spectral response acceleration, S D1 (g) 0.569 * Assumes medium dense soil conditions, encountered to a maximum depth of nine and one-half feet bgs during the May 2021 field exploration, remain medium dense or better to at least 100 feet bgs. Based on our experience with the project geologic setting (glacial till) across the Puget Sound region, soil conditions are likely consistent with this assumption. Further discussion between the project structural engineer, the project owner (or their representative), and ESNW may be prudent to determine the possible impacts to the structural design due to increased earthquake load requirements under the 2018 IBC. ESNW can provide additional consulting services to aid with design efforts, including supplementary geotechnical and geophysical investigation, upon request. Liquefaction is a phenomenon where saturated or loose soil suddenly loses internal strength and behaves as a fluid. This behavior is in response to increased pore water pressures resulting from an earthquake or another intense ground shaking. In our opinion, site susceptibility to liquefaction may be considered negligible. The absence of a shallow groundwater table and the relative density of the native soil were the primary bases for this opinion. Prospect Development, LLC ES-7961 August 23, 2021 Page 8 Updated September 13, 2021 Earth Solutions NW, LLC Slab-on-Grade Floors Slab-on-grade floors should be supported on a firm and unyielding subgrade consisting of competent native soil or new structural fill. Unstable or yielding areas of the subgrade should be recompacted or overexcavated and replaced with suitable structural fill prior to construction of the slab. A capillary break, consisting of a minimum of four inches of free-draining crushed rock or gravel, should be placed below the slab. The free-draining material should have a fines content of 5 percent or less defined as the percent passing the number 200 sieve based on the minus three-quarters inch fraction. In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. If used, the vapor barrier should consist of a material specifically designed to function as a vapor barrier and should be installed in accordance with the manufacturer’s specifications. Retaining Walls Retaining walls must be designed to resist earth pressures and applicable surcharge loads. The following parameters may be used for design:  Active earth pressure (unrestrained condition) 35 pcf (equivalent fluid)  At-rest earth pressure (restrained condition) 55 pcf  Traffic surcharge (passenger vehicles) 70 psf (rectangular distribution) *  Passive earth pressure 300 pcf (equivalent fluid)  Coefficient of friction 0.40  Seismic surcharge 8H psf** * Where applicable ** Where H equals the retained height (in feet) The above design parameters are based on a level backfill condition and level grade at the wall toe. Revised design values will be necessary if sloping grades are to be used above or below retaining walls. Additional surcharge loading from adjacent foundations, sloped backfill, or other relevant loads should be included in the retaining wall design, where applicable. A safety factor of 1.5 is included in the passive earth pressure and coefficient of friction values. Retaining walls should be backfilled with free-draining material or suitable sheet drainage that extends along the height of the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall backfill can consist of a less permeable soil, if desired. A perforated drainpipe should be placed along the base of the wall and connected to an approved discharge location. A typical retaining wall drainage detail is provided on Plate 3. If drainage is not provided, hydrostatic pressures should be included in the wall design. Prospect Development, LLC ES-7961 August 23, 2021 Page 9 Updated September 13, 2021 Earth Solutions NW, LLC Landscape Retaining Walls Based on the existing site grades, retaining walls may be used along the portions of the lots to raise grades for new building pads. Final wall heights, alignments and facing materials have not been determined at the time of this report. Walls over four feet in total height, including toe embedment will require building permits supported by an engineered design. ESNW can prepare and engineered retaining wall design, upon request. ESNW should review the final grading plans to confirm the recommendations are incorporated and to provide additional recommendations where appropriate. Drainage Groundwater seepage was not encountered during our exploration; however, groundwater seepage will likely be encountered within site excavations, particularly utility trenches and deeper excavations such as detention vault/pond areas. Temporary measures to control surface water runoff and groundwater during construction would likely involve passive elements, such as interceptor trenches and sumps. ESNW should be consulted during preliminary grading to identify areas of groundwater and to provide recommendations to reduce the potential for instability related to groundwater effects. Depending on the flow volumes encountered during grading, an interceptor trench drain system may be warranted along the up-slope perimeter of the work area to help mitigate or otherwise control shallow perched groundwater flows. Finish grades must be designed to direct surface water away from the new structures and/or slopes for a distance of at least 10 feet or as setbacks allow. Water must not be allowed to pond adjacent to the new structures and/or slopes. A typical foundation drain detail is provided on Plate 4. Infiltration Evaluation Outwash type soils were encountered at depth within test pits TP-1 through TP-3 with corresponding fines content of about 5 percent. The outwash soils may be suitable for infiltration pending in-situ infiltration testing. Based on textural analyses and using the DOE saturated hydraulic conductivity calculation, for feasibility considerations, a preliminary infiltration rate of 10 inches per hour was recommended to the project civil engineer for the relatively clean outwash sand and gravel deposits such as those encountered at test pit locations TP-1 through TP-3. The facility illustrated on the referenced preliminary plans were developed based on information provided by ESNW during the early phase of design. ESNW should conduct targeted infiltration testing to better characterize the infiltration potential for the outwash type soils. Based on the conditions observed during our fieldwork and anecdotal information provided by the project civil engineer, groundwater separation will likely be feasible. We understand projects nearby to the north also use infiltration systems and these are functioning as intended. The native soils in the southern portion of the site consist predominately of silty sand with gravel, glacially consolidated deposits that exhibit fines contents ranging from about 33 to 49 percent (passing the U.S. No. 200 sieve), and are not suitable for infiltration. Prospect Development, LLC ES-7961 August 23, 2021 Page 10 Updated September 13, 2021 Earth Solutions NW, LLC Utility Support and Trench Backfill The native soils observed at the test pit locations are generally suitable for support of utilities; however, the native soils may not be suitable for use as structural backfill in the utility trench excavations unless the soil is at or near the optimum moisture content at the time of placement and compaction. Moisture conditioning or cement treatment of the soils may be necessary at some locations prior to use as structural fill. If utility backfill occurs during wet weather, cement treatment of native soils or import of a suitable material will be necessary. Utility trench backfill should be placed and compacted to the specifications of structural fill provided in this report, or to the applicable requirements of presiding jurisdiction. Preliminary Pavement Sections The performance of site pavements is largely related to the condition of the underlying subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in pavement areas should be compacted to the specifications detailed in the Site Preparation and Earthwork section of this report. It is possible that soft, wet, or otherwise unsuitable subgrade areas may still exist after base grading activities. Areas of unsuitable or yielding subgrade conditions may require remedial measures such as overexcavation and replacement with structural fill or thicker crushed rock sections prior to pavement. For lightly loaded pavement areas subjected primarily to passenger vehicles such as driveways, the following preliminary pavement sections may be considered:  A minimum of two inches of hot mix asphalt (HMA) placed over four inches of crushed rock base (CRB), or;  A minimum of two inches of HMA placed over three inches of asphalt treated base (ATB). Heavier traffic areas generally require thicker pavement sections depending on site usage, pavement life expectancy, and site traffic. For preliminary design purposes, the following pavement sections for occasional truck traffic areas may be considered:  Three inches of HMA placed over six inches of crushed rock base (CRB), or;  Three inches of HMA placed over four-and-one-half inches of ATB. The HMA, CRB and ATB materials should conform to WSDOT specifications. If pavement areas will include a reverse crown, additional drainage should be used to effectively convey water that may enter the subgrade toward the storm drainage system. ESNW can provide recommendations for enhanced drainage upon request. Prospect Development, LLC ES-7961 August 23, 2021 Page 11 Updated September 13, 2021 Earth Solutions NW, LLC LIMITATIONS The recommendations and conclusions provided in this study are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. A warranty is neither expressed nor implied. Variations in the soil and groundwater conditions observed at the test locations may exist and may not become evident until construction. ESNW should reevaluate the conclusions provided in this study if variations are encountered. Additional Services ESNW should have an opportunity to review final project plans with respect to the geotechnical recommendations provided in this report. ESNW should also be retained to provide testing and consultation services during construction. Drwn.MRS Checked SSR Date Aug.2021 Date 08/13/2021 Proj.No.7961 Plate 1 Earth Solutions NWLLC Geotechnical Engineering,Construction EarthSolutionsNWLLC EarthSolutions NW LLC Observation/Testing and Environmental Services Vicinity Map Twin Trails Federal Way,Washington Reference: King County,Washington OpenStreetMap.org NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. SITE MRS SSR 09/13/2021 7961 2TestPitLocationPlan TwinTrailsFederalWay,WashingtonNORTH NOT -TO -SCALE NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Test Pit,Proj.No. ES-7961,May 2021 Subject Site Existing Building Proposed Lot Number TP-1 19 S.W.341ST PLACE S.W.342ND PLACE S.W.344TH STREET 19THavenueS.W.road a road B 1 2 3 4 5678 9 10 11 12 13 14 15 16 17 18192021 2223 24 25 26 27 28 29 30 31 32 33 34 35 36 3738 Tract A Tract B Tract C Tract D Tract E Tract F340338336334Close-Up of Tract A with Pond TP-1 TP-2 TP-3 TP-4TP-5 TP-6 TP-7 TP-8 Plate Proj.No. Date Checked By Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionObservation/TestingandEnvironmentalServicesEarthSolutionsNWLLCEarthSolutionsNWLLC Drwn.MRS Checked SSR Date Aug.2021 Date 08/13/2021 Proj.No.7961 Plate 3 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineer ing,C onstr uction Observation/Testing and Environmental Services Retaining Wall Drainage Detail Twin Trails Federal Way,Washington NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAWING Drwn.MRS Checked SSR Date Aug.2021 Date 08/13/2021 Proj.No.7961 Plate 4 Earth Solutions NWLLC Geotechnical Engineering,Construction Observation/Testing and Environmental Services EarthSolutionsNWLLC EarthSolutions NW LLC Footing Drain Detail Twin Trails Federal Way,Washington Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING Earth Solutions NW, LLC Appendix A Subsurface Exploration Test Pit Logs ES-7961 Subsurface conditions at the subject site were explored on May 28, 2021 by excavating eight test pits using a mini-trackhoe and operator provided by the client. The approximate locations test pits are illustrated on Plate 2 of this study. The test pit logs are provided in this Appendix. The maximum exploration depth was approximately nine and one-half feet bgs and were terminated in firm native soils. The final logs represent the interpretations of the field logs and the results of laboratory analyses. The stratification lines on the logs represent the approximate boundaries between soil types. In actuality, the transitions may be more gradual. GRAVEL AND GRAVELLY SOILS CLAYEY GRAVELS, GRAVEL - SAND - CLAY MIXTURES WELL-GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES POORLY-GRADED SANDS, GRAVELLY SAND, LITTLE OR NO FINES SILTY SANDS, SAND - SILT MIXTURES CLAYEY SANDS, SAND - CLAY MIXTURES INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SAND OR SILTY SOILS INORGANIC CLAYS OF HIGH PLASTICITY SILTS AND CLAYS MORE THAN 50% OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE MORE THAN 50% OF MATERIAL IS SMALLER THAN NO. 200 SIEVE SIZE MORE THAN 50% OF COARSE FRACTION PASSING ON NO. 4 SIEVE MORE THAN 50% OF COARSE FRACTION RETAINED ON NO. 4 SIEVE SOIL CLASSIFICATION CHART (APPRECIABLE AMOUNT OF FINES) (APPRECIABLE AMOUNT OF FINES) (LITTLE OR NO FINES) FINE GRAINED SOILS SAND AND SANDY SOILS SILTS AND CLAYS ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENTS LETTERGRAPH SYMBOLSMAJOR DIVISIONS COARSE GRAINED SOILS TYPICAL DESCRIPTIONS WELL-GRADED GRAVELS, GRAVEL - SAND MIXTURES, LITTLE OR NO FINES POORLY-GRADED GRAVELS, GRAVEL - SAND MIXTURES, LITTLE OR NO FINES SILTY GRAVELS, GRAVEL - SAND - SILT MIXTURES CLEAN GRAVELS GRAVELS WITH FINES CLEAN SANDS (LITTLE OR NO FINES) SANDS WITH FINES LIQUID LIMIT LESS THAN 50 LIQUID LIMIT GREATER THAN 50 HIGHLY ORGANIC SOILS DUAL SYMBOLS are used to indicate borderline soil classifications. The discussion in the text of this report is necessary for a proper understanding of the nature of the material presented in the attached logs. GW GP GM GC SW SP SM SC ML CL OL MH CH OH PT Earth Solutions NW LLC MC = 13.3% MC = 4.5% Fines = 5.3% MC = 4.8% TPSL SM GW- GM Dark brown TOPSOIL, minimal root intrusions Brown silty SAND with gravel, medium dense, moist (Weathered Till) -becomes gray, dense Gray well-graded GRAVEL with silt and sand, dense, damp [USDA Classification: extremely gravelly loamy coarse SAND] Test pit terminated at 9.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. 0.5 5.0 9.0 NOTES Depth of Topsoil & Sod 6": grass LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35659 LATITUDE 47.29579 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-1 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 10.1% MC = 5.3% TPSL SM GW- GM Dark brown TOPSOIL, minimal root intrusions Brown silty SAND with gravel, medium dense, damp (Weathered Till) -becomes gray, dense Gray well-graded GRAVEL with silt and sand, dense, damp (Unweathered Till) Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. 0.5 5.5 8.0 NOTES Depth of Topsoil & Sod 4": grass LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35649 LATITUDE 47.29516 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-2 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 7.3% MC = 6.6% TPSL SM SP Dark brown TOPSOIL, minimal root intrusions Brown silty SAND with gravel, medium dense, damp -large cobbles 1.5' diameter Brown poorly graded SAND with gravel, medium dense, damp Test pit terminated at 8.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. 0.5 6.0 8.5 NOTES Depth of Topsoil & Sod 8": grass LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35591 LATITUDE 47.29502 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-3 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 15.7% Fines = 49.1% MC = 12.0% SM Gray silty SAND with gravel, medium dense, moist [USDA Classification: gravelly LOAM] -becomes dense, damp -weakly cemented Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. 8.0 NOTES Depth of Topsoil & Sod 2": duff LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35622 LATITUDE 47.29358 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-4 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 10.5% MC = 13.2% Fines = 33.5% SM Gray silty SAND, medium dense, damp -increasing sand content [USDA Classification: slightly gravelly sandy LOAM] Test pit terminated at 9.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. 9.5 NOTES Depth of Topsoil & Sod 3": duff LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35755 LATITUDE 47.29382 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-5 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 14.7% MC = 13.2% Fines = 33.3% SM Brown silty SAND, medium dense, moist -becomes gray -becomes dense -iron oxide staining [USDA Classification: gravelly sandy LOAM] Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. 8.0 NOTES Depth of Topsoil & Sod 3": duff LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35822 LATITUDE 47.2944 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-6 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 14.4% MC = 14.1% TPSL SM Dark brown TOPSOIL, shallow root intrusions Brown silty SAND with gravel, medium dense, moist -becomes gray, dense -weakly cemented -becomes gray -iron oxide staining Test pit terminated at 8.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. 0.5 8.5 NOTES Depth of Topsoil & Sod 6": duff LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.3571 LATITUDE 47.29438 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-7 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG MC = 10.8% Fines = 39.2% MC = 10.4% SM Gray silty SAND with gravel, medium dense, damp -becomes dense -weakly cemented [USDA Classification: slightly gravelly sandy LOAM] -becomes very dense Test pit terminated at 6.5 feet below existing grade due to refusal on very dense soils. No groundwater encountered during excavation. No caving observed. 6.5 NOTES Depth of Topsoil & Sod 3": duff LOGGED BY SES EXCAVATION METHOD EXCAVATION CONTRACTOR Client Provided CHECKED BY SSR DATE STARTED 5/28/21 COMPLETED 5/28/21 GROUND WATER LEVEL: GROUND ELEVATION LONGITUDE -122.35624 LATITUDE 47.29431 AT TIME OF EXCAVATION SAMPLE TYPENUMBERDEPTH(ft)0 5 PAGE 1 OF 1 TEST PIT NUMBER TP-8 PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GENERAL BH / TP / WELL - 7961.GPJ - GRAPHICS TEMPLATE.GDT - 9/13/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U.S.C.S.MATERIAL DESCRIPTION GRAPHICLOG Earth Solutions NW, LLC Appendix B Laboratory Test Results ES-7961 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 3 D100 140 Specimen Identification 1 fine 6 HYDROMETER 304 5.3 1.7 49.1 33.5 33.3 101/2 COBBLES Specimen Identification 4 coarse 20 401.5 8 14 USDA: Brown Extremely Gravelly Loamy Coarse Sand. USCS: GW-GM with Sand. USDA: Brown Very Gravelly Coarse Sand. USCS: SP with Gravel. USDA: Gray Gravelly Loam. USCS: SM. USDA: Gray Slightly Gravelly Sandy Loam. USCS: SM. USDA: Gray Gravelly Sandy Loam. USCS: SM. 6 60 PERCENT FINER BY WEIGHTD10 2.869 0.663 15.214 2.435 0.233 0.256 0.324 GRAIN SIZE DISTRIBUTION 100 50.84 7.83 LL TP-01 TP-03 TP-04 TP-05 TP-06 0.299 0.311 3/4 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS GRAVEL SAND 37.5 19 19 19 37.5 %Silt 1.81 0.58 TP-01 TP-03 TP-04 TP-05 TP-06 2 2003 Cc CuClassification %Clay 16 PID60 D30 coarse SILT OR CLAYfinemedium GRAIN SIZE IN MILLIMETERS 3/8 50 6.0ft. 8.5ft. 2.5ft. 9.5ft. 8.0ft. 6.00ft. 8.50ft. 2.50ft. 9.50ft. 8.00ft. PL PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GRAIN SIZE USDA ES-7961 TWIN TRAILS.GPJ GINT US LAB.GDT 6/4/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 3 D100 140 Specimen Identification 1 fine 6 HYDROMETER 304 39.2 101/2 COBBLES Specimen Identification 4 coarse 20 401.5 8 14 USDA: Gray Slightly Gravelly Sandy Loam. USCS: SM. 6 60 PERCENT FINER BY WEIGHTD10 0.224 GRAIN SIZE DISTRIBUTION 100 LL TP-08 3/4 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS GRAVEL SAND 19 %Silt TP-08 2 2003 Cc CuClassification %Clay 16 PID60 D30 coarse SILT OR CLAYfinemedium GRAIN SIZE IN MILLIMETERS 3/8 50 3.0ft. 3.00ft. PL PROJECT NUMBER ES-7961 PROJECT NAME Twin Trails GRAIN SIZE USDA ES-7961 TWIN TRAILS.GPJ GINT US LAB.GDT 6/4/21Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 Earth Solutions NW, LLC Report Distribution ES-7961 EMAIL ONLY Prospect Development, LLC 2913 – 5th Avenue Northeast, Suite 201 Puyallup, Washington 98372 Attention: Mr. Justin Holland EMAIL ONLY Mr. Clay Loomis