S 348th St NHS Preservation Project Preliminaray Design ReportS 348TH ST NHS PRESERVATION PROJECT – PRELIMINARY DESIGN PHASE REPORT 1 2 Policy Question: Should the City Council authorize staff to proceed with design of the S 348th St NHS Preservation Project and return to LUTC and Council for final design, bid authorization, and further reports? 2 Financial Impacts The cost to the City for the S 348th St NHS Preservation Project was included within the approved budget under the Capital Improvement Plan for Transportation Systems, Project #36241. In accordance with the approved budget, this item is funded by National Highway System (NHS) Asset Management program in the amount of $945,000 and $171,000 from the Arterial Street Funding (102). Upon completion of the project, ongoing costs associated with operations and maintenance will be performed and funded through streets maintenance. Funding requirements for operations and maintenance of infrastructure is reviewed and adjusted as required during the budget process. 3 3 Background: The S 348th St NHS Preservation Project provides replacements of existing curb ramps and pedestrian push buttons to meet current ADA standards; full width planing bituminous pavement; HMA pavement repair; 2 ½” thick HMA overlay; removal and replacement of existing dual-faced sloped mountable curb; replacement of traffic signal detection loops; channelization; and utility adjustments. 4 4 Progress to Date Completed Tasks: Topographic Survey Project Design to 30% WSDOT Coordination Ongoing Tasks Include: Utility Coordination Preliminary Contract Specifications Project Design to 90% NEPA Application and Approval 5 5 Estimated Expenditures Design (in house with survey) $ 90,000.00 2023 Construction Cost $ 821,000.00 10% Construction Contingency $ 82,100.00 Construction Management & Inspection $ 122,900.00 Estimated Total Cost: $1,116,000.00 6 6 Available Funding Grant (NHS) Asset Management $ 945,000.00 Fund 102 (Motor Vehicle Fuel Tax) $ 171,000.00 Total Available Budget $1,116,000.00 7 7 The estimated cost of $1,116,000 is a preliminary figure used for estimating purposes only. The S 348th St NHS Preservation Project will be awarded within the available budget. Estimated advertising date – October 2022 Estimated start of construction – March 2023 8 8 Options Considered Authorize staff to proceed with design of the S 348th St NHS Preservation Project and return to LUTC and Council for final design, bid authorization, and further reports? Do not authorize staff to proceed with design of the S 348th St NHS Preservation Project and provide direction to staff. 9 9 Mayor’s Recommendation The Mayor recommends forwarding Option 1 to the November 16, 2021 City Council Consent Agenda for approval. 10 10 Questions? 11 11