RES 21-817 - Approving 2022 Fee ScheduleRESOLUTION NO.21-817
A RESOLUTION of the City of Federal Way, Washington, amending
the fee schedule for 2022 and repealing the fee schedule adopted in
Resolution No. 20-803.
WHEREAS, the City is authorized under RCW 35A.11.020, 35A.63.100(2), and 19.27.040
to require licenses for the conduct of business, require permits for the construction of structures
and improvements, and to impose fees to recoup the costs of processing and/or providing services;
and
WHEREAS, the Federal Way Revised Code establishes the basis for the assessment and/or
collection of such license, permit fees, and service charges; and
WHEREAS, the City Council deemed it is advisable and necessary to provide gradual
annual increases in Land Use, Mechanical, Plumbing, Public Works, Electrical, and Building
permit fees and to establish the mid -year Consumer Price Index for All Clerical Workers (CPI-W)
for the Seattle -Tacoma -Bellevue area as the basis for such adjustments in Resolutions 98-281, 01-
351, 02-377, 03-406, 04-435, 05-462, 06-490, 07-513, 08-537, 09-567, 10-585, 10-599, 11-612,
12-626, 13-654, 14-673, 15-699, 16-711, 17-717, 17-730, 18-745, 18-746, 19-775, and the average
of the June and August CPI-W for the Seattle -Tacoma -Bellevue area as the basis for the adjustment
in 20-803; and
WHEREAS, the City Council has historically adjusted development services and permit
fees under the Land Use, Mechanical Code, Plumbing Code, Public Works, Electrical Code, and
International Building Codes in accordance to the percentage of inflation measured by the mid-
year CPI-W for the Seattle -Tacoma -Bellevue area, but due to continuing fluctuation in the local
Resolution No. 21-817 Page I of] 7
and national economy, the average of the February, April, June, and August Consumer Price Index
for Urban Wage Earners and Clerical Workers was used as the basis and will be the new basis for
future fee resolution changes; and
WHEREAS, the Transportation Impact Fees are indexed to provide for an automatic
increase each year based on a three-year moving average of the Washington State Department of
Transportation Construction Cost Index; and
WHEREAS, the City Council finds it necessary to revise building -related permit fees in
order to ensure that fees reflect changes in the types of permits issued, more accurately recover
costs associated with permit issuance, to remain consistent with surrounding jurisdictions, and to
correct inconsistencies and errors; and
WHEREAS, the City Council finds it necessary to revise the City fee schedule upon review
of the fee table.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
RESOLVES AS FOLLOWS:
Section 1. Fee Schedule. The City of Federal Way hereby adopts the 2022 Fee Schedule
as attached hereto, identified as Exhibit A and hereby incorporated in full by this reference, for
fees associated with the various licenses, permit processes, and other business activities of the
City.
Section 2. Severability. If any section, sentence, clause or phrase of this resolution should
be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or
unconstitutionality shall not affect the validity or constitutionality of any other section, sentence,
clause or phrase of this resolution.
Resolution No. 21-817 Page 2 of] 7
Section 3. Corrections. The City Clerk and the codifiers of this resolution are authorized
to make necessary corrections to this resolution including, but not limited to, the correction of
scrivener/clerical errors, references, resolution numbering, section/subsection numbers and any
references thereto.
Section 4. Ratification. Any act consistent with the authority and prior to the effective date
of this resolution is hereby ratified and affirmed.
Section 5. Effective Date. The fee schedule adopted by this resolution shall be effective
January 1, 2022. Any act consistent with the authority and prior to the effective date of the
resolution is hereby ratified and affirmed.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON this 7th day of December, 2021.
CITY OF FEDERAL WAY:
ATTEST:
S ANIE COURTNEY, C C, C TY CLERK
APPROVED AS TO FORM:
;;�� c"d-
J. RYAN CALL, CITY ATTORNEY
Resolution No. 21-817 Page 3 of] 7
FILED WITH THE CITY CLERK: 11/23/2021
PASSED BY THE CITY COUNCIL: 12/07/2021
RESOLUTION NO.: 21-817
Resolution No. 21-817 Page 4 of 17
EXHIBIT A
TYPE OF FEE
SECTION ONE. ANIMAL LICENSE AND OTHER FEES. (PDj
Unaltered Cat license per year
Unaltered Dog license per year
Altered Cat:
Altered Cat license for one year
Altered Cat license for two year
Altered Cat license for three vear
Permanent License (owners 65 years of age and older) - if Altered
Permanent License (disabled) - if Altered
$60
$60
$20
$35
$50
$25
$45
$65
Other Fees:
Replacement Tag $2
Hobby Kennel/Hobby Cattery (Plus each individual animal must be licensed) $50
No refund due to pet moving out of the area, or lost pet. The Manager may authorize a refund collected in error.
SECTION TWO. BUSINESS REGISTRATION. (FI)
Second Hand Dealer
See General Business
Registration + $80
Pawnbroker License See General Business
Registration + $500
SECTION TWO. BUSINESS REGISTRATION. (Fl) (continued)
1. Public Bathhouse Business See General Business
Registration
2. Bathhouse Attendant per attendant in addition to Business Registration fee $80
3. Bathhouse Manager per manager in addition to Business Registration fee $80
Public Bath House Proration: The entire annual license fee shall be paid for the applicable calendar year regardless of when the application for license
is made and shall not be prorated for any part of the year except that if the original application for license is made renewals shall be required to be
obtained and paid in full by January 31 of each respective year. subsequent to June 30 the license fee for the remainder of that year shall be one-half of
the annual license fee.
Annual License Renewal See below
Resolution No. 21-817 Page 5 of 17
TYPE OF FEE Now 2022
Fee
Late Penalty:
Failure to pay any registration fee due within 30 days after the day on which it is due and payable shall result in a penalty of five percent or $5.00,
whichever is higher, on the amount of the registration fee, and an additional penalty of five percent or $5.00, whichever is higher, for each succeeding
month of delinquency or part thereof, but shall not exceed a total penalty of $25.00 or 25 percent of the amount of such registration fee, whichever is
higher.
SECTION THREE. CONSTRUCTION PERMITS (CD)
PERMIT FEES
A. BUILDING
The Building, Mechanical, Plumbing, and Sign Permit fees are calculated by applying Valuation Table A to the value of the work proposed. The valuation should
include the typical construction methods for foundation work, structural and nonstructural building components, and interior finish material. The value of the work
shall be determined by using Building Value Data as published and further updated by the International Code Council or by submission of a written project bid
subject to approval by the Building Official.
VALUATION TABLE A
Total Project Valuation
$1.00 -
$1,000.00
Base
$72.83
Incremental Factor
NIA
$1,000.01 -
$2,000.00
$72.83 for first $1,000, plus
$5.50 for each additional $100.00 or fraction thereof, to and including $2,000.00.
$2,000.01 - $25,000.00
$127.83 for first $2,000, plus
$27.39 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00.
$25,000.01 - $50,000.00
$757.80 for first $25,000, plus
$19.52 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00.
$50,000.01 - $100,000.00
$1,245.80 for first $50,000, plus
$13.21 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00.
$100,000.01 - $500,000.00
$1,906.30 for first $100,000, plus
$10.71 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00.
$500,000.01 - $1,000,000.00
$6,190.30 or first $500,000, plus
$8.80 for each additional $1,000.00
or fraction thereof, to and including $1,000,000.00.
$1,000,000.01 and u
$10,590.30 for first $1,000,000, plus
$6.93 for each additional $1,000.00
or fraction thereof.
Note: Additional fees will apply to a permit, as noted here:
All development permits are charged an automation fee. See Section Three, I for details.
All building permits are charged an SBCC surcharge. See Section Three, I for details.
All permit review includes review of the original submission and one resubmission
Resubmittal of documents- Additional plan review fees will be assessed starting with second and subsequent resubmissions.
Some building permits require plan review. See Section Three, G for details.
Some building permits require plumbing fees. See Section Three, D for details.
Some building permits require mechanical fees. See Section Three, C for details.
Some building permits require a digitizing fee. See Section Three, I for details.
Some building permits require an impact fee. See Section Thirteen for details.
Some building permits require zoning review. See Section Seven, B for details.
Some building permits require a South King Fire fee. See Section Five for details.
B. DEMOLITION
Permit Fee is based on total project demolition valuation. See Section Three, A, Valuation Table A to calculate fees.
C. MECHANICAL
General permit fees are based on total installation valuation. See Section Three, A, Valuation Table A to calculate fees
Permit and plan review fees for a New Single -Family Residence is a flat fee of:
D. PLUMBING
General permit fees are based on total installation valuation. See Section Three, A, Valuation Table A to calculate fees.
Permit and Dian review fees for a New Sinale-Familv Residence is a flat fee of:
E. ELECTRICAL
Permit fee is based on total installation valuation. Use Valuation Table B to calculate electrical permit fees,
VALUATION TABLE
Total Project Valuation
Base
Incremental Factor
$1.00 -
$1,000.00
$78.25
NIA
$1,000.01 -
$2,000.00
$78.25 for first $1,000, plus
$5.90 for each additional $100.00 or fraction thereof, to and including $2,000.00.
$2,000.01 - $25,000.00
$137.23 for first $2,000, plus
$29.44 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00.
$25,000.01 - $50,000.00
$814.27 for first $25,000, plus
$20.99 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00.
$50,000.01 - $100,000.00
$1,338.92 for first $50,000, plus
$13.63 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00.
$100,000.01 - $500,000.00
$2,049.04 for first $100,000, plus
$11.49 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00.
$500,000.01 - $1,000,000.00
$6,646.34 for first $500,000, plus
$9.47 for each additional $1,000.00
or fraction thereof, to and including $1,000,000.00.
$1,000,000.01 and u
$11,382.23 for first $1,000,000, plus
$7.45 for each additional $1,000.00
or fraction thereof.
Per FWRC 12.05.060 (7)
30 % of Plan Review fee
Resolution No. 21-817 Page 6 of 17
TYPE OF FEE 2022
Fee
SECTION THREE. CONSTRUCTION PERMITS (CD) (continued)
F. SIGN
(1) Permanent sign.
Permit fee is based on total construction installation valuation. See Section Three, A, Valuation Table A to calculate fee.
The total permit fee' for electrical signs includes an electrical connection fee, as follows:
First sign $76
Each additional sign on same application $36
The total permit fee' includes a per sign planning surcharge, as follows:
First sign $57
Each additional sign on same application $21
Note 1. Fee is based on actual hourly personnel costs.
(2) Temporary sign. Note: temporary signs are by separate permit.
Permit fee
SECTION THREE. CONSTRUCTION PERMITS (CD) (continued)
G. PLAN REVIEW FEES
The specified plan review fees are separate from and in addition to the permit fees and are collected at application submittal.
Building permit:
65 % of the building permit fee
Mechanical permit:
65 % of the mechanical permit fee
Plumbing permit:
65% ofthe plumbing permitfee
Sign permit:
65 % of the sign permit fee
Electrical permit:
65 % of the electrical permit fee
South King Fire & Rescue:
15% of the building permit fee [Commercial building permits ONLY]
Additional plan review required by changes / additions / revisions to plans, per hour or portion thereof' $76
Outside consultant plan review.
Any private or public professional services contract needed will be billed 100%, plus 10% billing and administrative charges.
Note 1. Fee is based on actual hourly personnel costs.
Note: Fire prevention system plan review fees are found in Section Five. Fire Code -Annual Permits and Review fee section.
H. ADDITIONAL OR SPECIAL INSPECTIONS
The following fees are separate from and in addition to the permit fees and are collected in advance of work performed.
for which no fee is seecifically indicated (1-hour minimum) (Houriv Rate
administrative charges.]
Note: 1. Fee is based on actual hourly personnel costs.
I. MISCELLANEOUS PERMIT -RELATED FEES
Note: 1. Fee is based on actual hourly personnel costs.
Resolution No. 21-817 Page 7 of 17
TYPE OF FEE
Fee
J.REFUNDS
Permit applications: The Building Official may authorize the refunding of not more than 80 % of the permit plan review fees paid, provided the applicant presents a written request to withdraw the application prior to the
commencement of staff review. The automation fees are non-refundable. [ NOTE: The Building Official does not have purview over another department's or jurisdiction's fees. Please apply for other potential refunds
separately, if applicable.]
Issued permits: The Building Official may authorize the refunding of not more than 80 % of other, non -plan review -related building permit fees paid, provided the applicant presents a written
request to cancel the permit prior to the commencement of any construction work covered by the permit and/or prior to the completion of any inspections by City staff. The automation fees are
non-refundable. [ NOTE: The Building Official does not have purview over another department's or jurisdiction's fees. Please apply for other potential refunds separately, if applicable.]
K. RENEWALS
Permit Renewal: Request for renewal of residential, multi -family, and commercial building permit.
L. PENALTIES
Any person who shall commence any work for which a permit is required by this Code without first having obtained a permit may be required to pay double the permit fee fixed by
this section for such work. Such double permit fee shall be in additional to any penalty for a violation of the provisions of this Code.
$308
SECTION FOUR. FALSE ALARMS. (EMS)
False Alarm Fee
Burglary
tat and 2nd false alarms in a registration year (July 1 - June 30)
Free
3rd false alarms in a registration year (July 1 - June 30), each alarm
$50
4th false alarms in a registration year (July 1 - June 30), each alarm
$100
5th false alarms in a registration year (July 1 - June 30), each alarm
$150
6th and successive false alarms in a registration year (July 1 - June 30), each alarm
$200
Robbery
1st and 2nd false alarms in a registration year (July 1 - June 30)
Free
3rd false alarms in a registration year (July 1 - June 30), each alarm
$75
4th false alarms in a registration year (July 1 - June 30), each alarm
$150
5th false alarms in a registration year (July 1 - June 30), each alarm
$225
6th and successive false alarms in a registration year (July 1 - June 30), each alarm
$300
Late Registration Fee Penalty
$50
Late False Alarm Payment Penalty
$25
Appeal Hearing Cancellation Fee
$10
SECTION FIVE. FIRE CODE -ANNUAL PERMITS AND REVIEW. (FIRE;
Fire Department Review and Inspection of Building Permits
15 % of Building Permit Fee
with min $77.25
Fire Prevention System Permits
Permit Fee (based on valuation)
Per IBC Section 108.2
Plan Review Fee
65 % of FP Permit Fee
Outside Consultant plan review
Actual cost
Additional plan review required by changes/additions/revisions to plan, per hour or portion thereof
$61.21/hr
Note: City retains $20.00 of total fee for processing
Public Disolav Permit (together with $100.00 cash
Resolution No. 21-817 Page 8 of 17
TYPE OF FEE
2022
Fee
SECTION SEVEN. LAND USE. (CD)
A. PRINCIPAL LAND USE AND SUBDIVISION -RELATED FEES
Accessory Dwelling Units (Includes submission & 1 resubmission
$535
Administrative Determination / Code Interpretation (Includes submission & 1 resubmission
$764
Annexations (Includes submission & 1 resubmission
$3,179
Boundary Line Adjustment (Includes submission & 1 resubmission),Plus:
$1,527
Fire Review @ 5%
$76
Public Works Review
$942
Binding Site Plan, 2-4 lots (Includes submission & 1 resubmission), Plus:
$3,818
Fire Review @ 5%
$191
Public Works Review
$1,670
Binding Site Plan, 5A lots (Includes submission & 1 resubmission), Plus:
$4,964
Fire Review @ 5%
$249
Public Works Review
$1,670
Binding Site Plan, 10 & more lots (Includes submission & 1 resubmission), Plus:
$7,636
Fire Review @ 5%
$382
Public Works Review
$1,670
Change of Use (Includes submission & 1 resubmission;
$381
Forest Practices Permit (Includes submission & 1 resubmission)
$269
Flood Plain Permit (Includes submission & 1 resubmission'
$764
Historic Designation Review (Includes submission & 1 resubmission
$152
Lot Line Elimination (Includes submission & 1 resubmission
$1,527
Plat, Preliminary (Includes submission & 1 resubmission), Plus:
$7,636
Per Acre Fee
$101
Fire Review @ 5%
$394
Public Works Review Base fee
$4,785
Plus per acre fee
$184
Plat, Final (Includes submission & 1 resubmission), Plus:
$5,041
Public Works Review
$2,008
Plat, Short 2-4 lots (Includes submission & 1 resubmission), Plus:
$3,818
Per lot
$99
Fire Review @ 5%
$191
Public Works Review
$1,654
Plat, Short 5 - 9 lots (Includes submission & 1 resubmission), Plus:
$4,964
Per lot
$99
Fire Review @ 5%
$248
Public Works Review
$1,654
Pre -Application Meeting (Includes submission & 1 resubmission
$580
Process I - Minor site review (Includes submission & 1 resubmissionj
$764
Resolution No. 21-817 Page 9 of 17
TYPE OF FEE 2022
Fee
SECTION SEVEN. LAND USE. (CD) (continued)
Process 3 - Applications for radio tower & antenna stmctures for use by amateur radio operators
required by FWRC 19.110.60(3) (Includes submission & 1 resubmission), Plus: $269
Fire Review @ 5% $14
Process 3 -Administrative Variances (Includes submission & 1 resubmission)
$4,582
Public Works Review
$369
Process 4 - Hearing Examiner's Decision, [Base Feel (Includes submission & 1 resubmission), Plus:
$4,868
Fire Review @ 5%
$244
Public Works Review
$2,210
Process 4 - Hearing Examiner Variance [Base Feel (Includes submission & 1 resubmission), Plus:
$4,100
Public Works Review
$556
Process 6 - Comprehensive Plan / Rezone Map or Text Amendments [Base Fee] (Includes submission & 1 resubmission), Plus: $4,868
Per Acre (for map amendment) $108
Public Notice Fee (for each required published notice)
$183
SEPA City Center Planned Action (includes submission & 1 resubmission), Plus:
$1,509
Fire Review Fee @ 5%
$75
Public Works Review
$737
SEPA Environmental Checklist for Non -Project Action(Includes submission & 1 resubmission), Plus:
$1,999
Fire Review Fee @ 5%
$100
Public Works Review
$369
SEPA Checklist for Project Action (Includes submission & 1 resubmission), Plus:
$1,999
Fire Review Fee @ 5%
$100
Public Works Review
$460
Shoreline Conditional Use Permit, (Includes submission & 1 resubmission), Plus: $4,582
Public Works Review $3,131
Shoreline (Exemption Determination) (Includes submission & 1 resubmission) $381
Resolution No. 21-817 Page 10 of 17
Shoreline Variance (Includes submission & 1 resubmission), Plus:
$4,582
Public Works Review
$2,317
Temporary Use Permit
$152
Tree Removal Request (Includes submission & 1 resubmission)
$152
Zoning Compliance Review —Change of Use (Includes submission & 1 resubmission)
$381
Zoning Verification / Inquiries / Determinations (Includes submission & 1 resubmission)
$152
B. MISCELLANEOUS LAND USE FEES',
Appeals
$1,221
[For appeals of Administrative Decision, SEPA Determination, Notice of Violation, or Hearing Examiner Decision]
Automation fee (Applies to all Land Use and Development permits)
$36
Extension requests
$269
Notary Public Service, Per document
$10
Renewal of Land Use Permit
Resubmittal of documents- Additional plan review fees will be assessed starting with second and subsequent resubmissions.
Review / Requests not otherwise covered by this schedule° (1-hour minimum), per hour
$123.00
Notes:
1. Appeal Fee shall be reimbursed in the event the reviewing authority determines that the appellant has substantially prevailed in the appeal action
2. The South King Fire & Rescue (SKFR) administrative review fee in an amount equal to 5 % of the land use fee imposed is charged and collected by the
City and paid to SKFR.
3. Additional fees will be required to pay for any time spent on Land Use Applications by the Department of Public Works above the number of hours
covered by the base amount allocated to Public Works for each application.
4. Fee is based on estimated hourly staff costs.
C. REFUNDS OF LAND USE FEES.
The Filing Fees as set forth in the Fee Schedule for the City are established to defray the cost of posting and processing and the proceedings in
connection with a land use application. The Director of Community Development may authorize the refunding of not more than 80 % of the total
application fees paid provided the applicant presents a written request to withdraw or cancel the application. The refund amount shall be determined at
the Director's discretion and be based on the amount of staff resources utilized at the time of the request.
D. MULTIPLE FEES
When multiple land use fees are required for the same project, the highest fee shall be charged at full cost and each additional fee shall be charged at
25 % of listed cost. Exceptions: 1) If a land use permit is required in conjunction with a subdivision application (preliminary plat, short subdivision or binding
site plan), full fees for both types of permit shall be charged. 2) SEPA fees shall be charged at the full rate shown.
SECTION EIGHT. MISCELLANEOUS. (MAYOR)
Miscellaneous Review, Inspection or other Activity (Land Use, Public Works & Building Permit Services)
Any public works, land use or building permit -related review, inspection or other activity not covered by the fee schedule, if performed by a City employee,
is based on actual hourly cost, plus benefits of 35%, plus overhead of 25%, plus a $15/hr computer usage fee. Any private or public professional services
contract needed will be billed 100%, plus 10 % billing and administrative charges.
Facsimile Usage (incomingloutgoing) tat Page $3
each additional page $1
Bound Printed Documents Actual Cost
Non -sufficient Funds Fee $25
Resolution No. 21-817 Page 11 of 17
TYPE OF FEE 2022
Fee
GIS Map and Data Requests:*
Maps that require extensive processing time or require additional Ink and plotting supplies will be charged at a higher rate.
Applicable sales tax will be added to the costs.
Staff Time to Complete Request, Per Hour $35
Computer Usage, Per Hour $15
Note: Staff time and computer usage will only be charged on requests for custom products.
SECTION NINE. PARK AND CITY FACILITY USE FEES. (PARKSI
Steel Lake Picnic Rentals & Special Events
Picnic Rentals
Monday - Sunday
Reservations are from 10:00 am - 3:00 pm and 4:00 pm - 9:00 pm with a Full Day option of 10:00 am to 9:00 pm
#1 Steel Lake Park (Site #1) and Town Square Park
Part Day
$160
Full Day
$290
#2 Steel Lake (Site #s 2-5), Adelaide, Laurelwood, Palisades, Sacajawea, and other requested sites (with City approval)
Part Day
$95
Full Day
$170
*Note: Groups over 120 require a Special Events Permits and subject to a different fee schedule and requirements.
City Hall Room Rentals
Council Chambers (per hour) $60
Non -Council Chamber Meeting Rooms (per hour) $30
SECTION TEN. PUBLIC WORKS. (PW)
A. Building Moving and Oversize/Overweight vehicle Permit
1. Building moving through City
2. Building moving into or within City
Pre -move inspection, the higher of actual cost or
3. Oversize/overweight vehicle permit
$370
$370
$370
$184
B. Street and/or Easement Vacation Application
1-300 lineal feet
$1,156
every 100 lineal feet thereafter, per 100 LF
$184
Resolution No. 21-817 Page 12 of 17
D. Single Family Residential Right -of -Way Modification Request, plus recording fee' $527
1. Non -Residential Right -of -Way Modification ( including Plat. Multi -family, Commercial) $1,472
2. Reconsideration of determination with aditional supplied information $2,800
F. Concurrency
G. Miscellaneous Public Works Permits and Services (Same fee structure under Section Eight/Miscellaneous Fees;
r. oman vvnreiess rermn twnen maucec In ane Lease Hcaencuml- Addendum Fee
8. Small Wireless Permit (when not included in Site Lease Addendum)** $652
*Recording Fee per chapter 36.198.010 RCW and as amended and K.C. Code 1.12.120 and as amended
** Right -of -Way Use Permit (Section 10 of Fee Schedule) is also required for construction and restoration within the right-of-way.
SECTION ELEVEN. RIGHT-OF-WAY ACTIVITY. (FU
Right of Way Activity Permit Fee $184
SECTION TWELVE. TAXICABS.
Pursuant to King County Fee Schedule
SECTION THIRTEEN. IMPACT MITIGATION.
School Impact Fee, per dwelling unit, as noted below (FWPS RESOLUTION #2021-13):
Single Family Residence, including Duplexes and Accessory Dwelling Units
$1,845
Plus City Administrative Fee @ 5%
$92
Multi -Family Residence
$15,073
Plus City Administrative Fee @ 5%
$754
**Mixed -Use Residential in accordance with Ordinance No. 95-249
$7,536
Plus City Administrative Fee @ 5%
$377
Resolution No. 21-817 Page 13 of 17
—Ordinance No. 14-757 provides 50 % reduced school impact fee within City Center Zone.
Note: City Administrative fee of 5 % will be added to the total School Impact Fees charged
Traffic Impact Fee (PW):
SECTION THIRTEEN. IMPACT MITIGATION. (continued)
Commercial - Retail Shopping
Commercial - Office
General Office per sf/GFA $8.89
Medical Office per sf/GFA $22.29
Resolution No. 21-817 Page 14 of 17
TYPE OF FEE 2022
Fee
G. Industrial
sf/GFA
City Center Impact Fee Rates
A. Commercial - Services
Drive-in Bank (CC) per sf/GFA
Day Care Center (CC) per sf/GFA
Library (CC) per sf/GFA
Post Office (CC) per sf/GFA
Movie Theater (CC) per seat
Health Club (CC) per sf/GFA
D. Commercial - Office
General Office (CC) per sf/GFA $3.35
Medical Office (CC) per sf/GFA $8.41
GFA = Gross Floor Area
GLA = Gross Leasable Area
CC = City Center
For uses with Unit of Measure in sF, trip rate is given as trips per 1,000 sF
VFP = Vehicle Fueling Positions (Maximum number of vehicles that can be fueled simultaneously)
Note: City Administrative fee of 5 % will be added to the total Traffic Impact Fees charged.
Surface Water
A. System Development Charge
Single Family (Detached) per dwelling $1,035.00
All other Development per ESU (1 ESU = 3200 sf of new impervious surface) $1,035.00
SECTION FOURTEEN. PUBLIC SAFETY. (PD)
Concealed Pistol License - Fees may change pursuant to State of Washington Firearms fee schedule
Resolution No. 21-817 Page 15 of 17
TYPE OF FEE `.—
Fee
SECTION FIFTEEN. COMMUNITY CENTER MEMBERSHIP FEES. (PARKS)
Resident
Single -Adult (18-61)
Single - Youth (3-11)
Single - Teen (12-17)
Single - Senior (62+)
Household of 2
Household of 2 Seniors (62+)
Household of 3
Household of 4
Household of 5
Household of 6
Household of 7
Household of 8
Low Income Rate is 75
B. Non -Resident
M-F 1
2022 Monthly No Contract Monthly 1 yr Contract Full Payment
1 yr Contract
SECTION FIFTEEN. COMMUNITY CENTER MEMBERSHIP FEES. (PARKS) Continued
D. Room Rental Fees Rental Period Resident Non -Resident
Community Full Room All Day $1,995 $2,200
4 - 8 hours $1,365 $1,575
Per hour (2 hr min.) $395 $450
Two Room Combo
4 - 8 hours $1,000 $1,155
Per hour (2 hr min.) $260 $300
One Room
4 - 8 hours
$500
$575
Per hour (2 hrs min.)
$160
$185
Forest Lounge
4 - 8 hours
$480
$550
Per hour (2 hr min.)
$160
$185
Maple Room
4 - 8 hours
$300
$350
Per hour (2 hr min.)
$75
$95
Wedding Package
$1,750
$1,950
Banquet hall (4 - 8 hrs), Linens, Bridal Room (4 hrs), and Set-up
Custom Set-up fee (1 room $75, 2 rooms $125, 3 room $175)
Kitchen with room rental (preferred caterer)
$25/hr
$25/hr
Kitchen with room rental (non -preferred caterer)
$200 base fee
$25/hr
$25/hr
E. Damage Deposit fee
Full or 2/3rd room
$500
$500
1 Room or Maple Room
$250
$250
Resolution No. 21-817 Page 16 of 17
TYPE OF FEE
Fee
SECTION SIXTEEN. IT TECHNOLOGY FEES. (IT)
In order to accommodate the high cost and need to continually replace telecommunications, data, network, hardware, and software systems caused by a continuous and rapidly changing
technology environment, the technology fees shall be applied to the following transactions:
A. Business license fees. A fee of one dollar ($1) per business license transaction unless the business is exempt from payment of the business license fee
B. Parks and recreation fees. A fee of one dollar ($1) per transaction for each registration for any parks and recreation program. For the purposes of this subsection, "transaction" shall mean the
process of collecting and receipting fees and charges in the form of cash, check, or credit card payment for programs, services, or miscellaneous resale items offered by the parks and recreation
department. The fee shall not apply to the following:
1. The fee shall not apply to registrations or transactions with a total cost less than ten dollars ($10);
2. The fee shall not apply to drop -in transactions (such as, for example and without limitation (1) time payment for use of the weight room at Community Center).
C. For all other applications, permits, inspections, registrations, transactions, and approvals established under the Federal Way Revised City Code, the fee shall be established by council resolution
Resolution No. 21-817 Page 17 of 17