Loading...
17-105489-Autoturn Analysis Memo-11-12-2021-V1 TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: November 12, 2021 TO: Laura Bartenhagen ESM Consulting Engineers FROM: Danielle Allen TENW SUBJECT: AutoTurn Analysis Project Name: IRG Woodbridge Business Park TENW Project No. 5219 ESM Consulting Engineers has requested that TENW prepare an AutoTurn analysis for the Woodbridge Business Park development in the City of Federal Way, Washington. The Business Park project is located between I-5 and Weyerhaeuser Way S, north of S 336th Street and south of S 323rd Street. Vehicular access to the development is proposed at four locations along Weyerhaeuser Way S. The purpose of this memorandum is to confirm the capabilities of truck access to/from the project site. The design vehicle for all turning movements analyzed in this study was assumed to be a WB-67. Based on site operations, it is assumed that three (3) of the four (4) driveways shall be used for truck operations. The results of our analysis are summarized below. Results TENW modeled the following WB-67 turning movements for the Woodbridge Business Park driveway accesses using AutoTurn Pro 11.0 software: · Site Access 1 To/From North (I-5): Right turn entering/left turn exiting · Site Access 2 To/From North (I-5): Right turn entering/left turn exiting Site Access 3 To/From North (I-5): Right turn entering/left turn exiting See ATTACHMENT A for all AutoTurn figures discussed above. Memorandum – IRG Woodbridge Business Park AutoTurn Analysis TENW November 12, 2021 Page 2 Conclusions It was assumed that the WB-67 truck must remain in its given lane when exiting or entering each driveway, no encroachment into bike lanes or two-way-left-turn lanes shall be allowed. Given all assumptions discussed within this memorandum, the analysis demonstrates that all three driveways can accommodate a WB-67 maneuvering in/out of the driveway as currently designed. TENW has concluded that no design revisions are needed to the three driveways along Weyerhaeuser Way S in order to accommodate a simultaneous in/out movement of a WB-67 vehicle at each driveway. Please contact me with any questions at (425) 250-0584 or danielle@tenw.com Sincerely, Transportation Engineering NorthWest Danielle Allen, P.E. Project Manager Memorandum – IRG Woodbridge Business Park AutoTurn Analysis TENW November 12, 2021 Page 3 Preliminary Site Plan Memorandum – IRG Woodbridge Business Park AutoTurn Analysis TENW November 12, 2021 Page 4 ATTACHMENT A AutoTurn Figures VEHICLE BODY ENVELOPE FRONT TIRE PATH REAR TIRE PATH LEGEND DATE: OF 3 10/01/2021 TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Danielle Allen Phone: 425-250-0584 BUSINESS PARK FEDERAL WAY, WASHINGTON 0 HORIZONTAL SCALE IN FEET 40 N SHEET Steering Angle Lock to Lock Time Articulating Angle WB-67 Trailer Track Tractor Track Trailer Width Tractor Width 19.504.00 feet 8.50 8.50: 8.00 8.00 : : : 0.00 3.00 45.50 15.00 53.00 : : :6.0 28.4 75.0 WB-67 SB RIGHT IN & NB LEFT OUT SITE ACCESS 1 AUTOTURN EXHIBIT 111-12-2021 VEHICLE BODY ENVELOPE FRONT TIRE PATH REAR TIRE PATH LEGEND DATE: OF 3 10/01/2021 TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Danielle Allen Phone: 425-250-0584 BUSINESS PARK FEDERAL WAY, WASHINGTON 0 HORIZONTAL SCALE IN FEET 40 N SHEET Steering Angle Lock to Lock Time Articulating Angle WB-67 Trailer Track Tractor Track Trailer Width Tractor Width 19.504.00 feet 8.50 8.50: 8.00 8.00 : : : 0.00 3.00 45.50 15.00 53.00 : : :6.0 28.4 75.0 WB-67 SB RIGHT IN & NB LEFT OUT SITE ACCESS 2 AUTOTURN EXHIBIT 211-12-2021 VEHICLE BODY ENVELOPE FRONT TIRE PATH REAR TIRE PATH LEGEND DATE: OF 3 10/01/2021 TENW Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 Transportation Engineering NorthWest Project Contact: Danielle Allen Phone: 425-250-0584 BUSINESS PARK FEDERAL WAY, WASHINGTON 0 HORIZONTAL SCALE IN FEET 40 N SHEET Steering Angle Lock to Lock Time Articulating Angle WB-67 Trailer Track Tractor Track Trailer Width Tractor Width 19.504.00 feet 8.50 8.50: 8.00 8.00 : : : 0.00 3.00 45.50 15.00 53.00 : : :6.0 28.4 75.0 WB-67 SB RIGHT IN & NB LEFT OUT SITE ACCESS 3 AUTOTURN EXHIBIT 311-12-2021