Loading...
17-105489-Parking Analysis-11-12-2021-V2 TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: September 1, 2021 TO: Sarady Long City of Federal Way FROM: Jeff Schramm / Curtis Chin, P.E. TENW SUBJECT: Updated Parking Analysis for the Woodbridge Business Park – Federal Way, WA TENW Project No. 5219 This memorandum documents the updated parking analysis for the proposed Woodbridge Business Park project located on the former Weyerhaeuser Campus site for the purpose of documenting whether or not adequate parking would be provided. Project Description The proposed project includes the development of three new buildings with a total building area of 971,390 SF, and with a total parking supply of 1,776 stalls. The new buildings would be located north and south of the existing Weyerhaeuser Tech Center (WTC) building which includes approximately 450,000 SF of building area. As part of the proposed project, the parking provided for the WTC building would be reconfigured. Of the 1,176 total parking stalls, 708 stalls would be allocated to the WTC building which would be an increase over the existing parking supply of 699 stalls. The remaining 1,068 parking stalls would be allocated to the three new buildings in the Woodbridge Business Park. WTC Parking Assessment According to the 1994 Weyerhaeuser Company Concomitant Pre-Annexation Zoning Agreement, the existing WTC building is located within the Corporate Park (CP-1) Zone. Per the Section XIII A of the concomitant agreement, „existing development and uses are deemed to comply with minimum requirements for number of parking spaces⁄‰ Therefore, since the 708 parking stalls allocated to the WTC building exceeds the existing parking supply, the parking provided would satisfy the parking requirement per the 1994 concomitant agreement. Proposed Building Area Parking Demand As of the date of this study, specific user(s) or tenant(s) have not been identified for the three new buildings totaling 971,390 SF. For the purpose of this analysis, the ÂIndustrial ParkÊ land use category was assumed consistent with the traffic impact analysis (TIA). To estimate the parking demand for the proposed buildings, the Institute of Transportation Engineers (ITE) Parking Generation manual, 5th edition was used. The parking demand rate for Industrial Park (LUC 130) is 1.20 parking spaces per 1,000 SF. As a result the peak parking demand for the three proposed buildings totals 1,166 spaces (971,390 SF X 1.20 parking spaces/1,000 SF). Woodbridge Business Park – Parking Assessment TENW September 1, 2021 Page 2 Total Parking Required The total parking required for the Woodbridge Business Park was determined by summing the parking required for the existing WTC building and the estimated parking demand generated by the three new buildings proposed (971,390 SF building area) as shown in Table 1. Table 1 Woodbridge Business Park Parking Summary Building Building Area (SF) Parking Demand Rate Required Parking/ Demand WTC (existing) 451,460 - 708 Subtotal = 451,460 - 708 1 (proposed) 605,195 1.20 726 2 (proposed) 240,675 1.20 289 3 (proposed) 125,520 1.20 151 Subtotal = 971,390 - 1,166 TOTAL = 1,422,850 - 1,874 Parking Supply Provided = 1,776 As shown in the table above, the required parking for the existing WTC and the demand for the Woodbridge Business Park if the new development is all „Industrial Park‰ totals 1,874 vehicles which exceeds the proposed on-site parking supply of 1,776 stalls by 98 parking stalls. This is a conservative assumption. The user of the project has not been identified. Accordingly, no floor plan showing the exact breakdown of uses has been prepared. Ultimately, it is likely that some or all of the square footage of the project will contain a use requiring less parking. We recommend that the City impose a condition requiring the building permit application plan set to include a section with a parking analysis that demonstrates compliance with the required parking ratios. This is consistent with the CityÊs approach on other project approvals, including Woodbridge Building B (Process III Project Approval Finding 8 and Condition of Approval 3). cc: Eric LaBrie, ESM Consulting Engineers Dana Ostenson, IRG Attachment