Project Name: AVANA STAR LAKE APARTMENTS BUILDING 46
Project Address: 2211 S STAR LAKE RD
Building - Multi Family
Permit #:20-103995-00-MF
Inspection Request Line: (253) 835-3050
Parcel Number: 720480 0095
Project Description: BLUEBEAM - Fire damage repair for units 104 and 204. No plumbing or mechanical.
Owner
Applicant
Contractor
Lender
KW CLUB PALISADES LLC
KUSTOM US INC
KUSTOM US INC
OWNER IS LENDER
2405 S STAR LAKE RD
5007 PACIFIC HWY E SUITE 20
5007 PACIFIC HWY E SUITE 20
FEDERAL WAY WA 98003
FIFE WA 98424
FIFE WA 98424
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
#1
#2
23
#4
Occupancy Class:
Construction T e:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? : .......................... No
Is this an Online or O.T.C. application? .................. Yes
Plumbing to be Included? ........................................ No
Total Valuation: 150,000.00
Number of Stories ................................................... 2
Permit for Building Shell Only? ................ .--- -1-.... No
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Monday, 9 August, 2021
Permit Issued on Wednesday, February 10, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the usefi"nicLaonravoCity
with the laws, rules and regulations of the State of
of Federal Way.
Owner or agent: Date:
_4%�
CITY OF
Federal Way
THIS CARD 1S TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 103995 00 Address: 2211 S STAR LAKE RD Bldg 46
Project: KW CLUB PALISADES LLC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSETHIS CARM Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Initial Erosion Control (4365) ❑ Footings/Setback (4110) ❑ Foundation Wall (4115)
To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete
By Date By Date By Date
❑
Drainage/Downspout (4040)
❑
Re -steel (4215)
®
Slab/Concrete Floor (4255)
Approved to backfill
Approved to place concrete or grout
Approved to place concrete
By
Date
By
Date
By
Date
❑
Underfloor Framing (4285)
®
Floor Sheathing (4105)
❑
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
M_)
Roof Sheathing (4220)
it
Fire/Draft Stops (4095)
❑
Interim Erosion Control (4370)
Approved to install roofing
Approved
Approved
By
Date
By
Date
By
Date
❑ Gypsum Wallboard Nailing (4130) El Suspended Ceiling Grid (4265) ❑ Final - S K F & R (4060)
Approved to install mud & tape Approved to drop tile Approved
By Date By Date By Date
El Final Erosion Control 4375 ( ) ❑ Final -Building (4050)
Approved ,,rr�� ,�� r Approved
By Date Byza�` Date J1V,;V
❑
Rough Electrical
❑
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date