19-105850-SU-Preliminary TIR-08-6-2021-V2
Western Washington Division Eastern Washington Division
165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd Street, Cle Elum, WA 98922
Phone: (425) 392-0250 Fax: (425) 391-3055 Phone: (509) 674-7433 Fax: (509) 674-7419
www.EncompassES.net
PRELIMINARY TECHNICAL INFORMATION REPORT
City of Federal Way
For
Kislyak Preliminary Short Plat
34402 24th Place SW
Federal Way, WA 98023
December 3, 2019
Updated: July 22, 2021
Prepared By:
Ian Dahl
Encompass Engineering Job No. 17678
Prepared For:
Petr Kislyak
6608 12th Street East
Fife, WA 98424
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page i
Table of Contents
I. PROJECT OVERVIEW .............................................................................................................................. 1
II. CONDITIONS AND REQUIREMENTS SUMMARY .................................................................................... 5
III. OFF-SITE ANALYSIS ................................................................................................................................ 9
IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ......................................... 18
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN .................................................................................. 23
VI. SPECIAL REPORTS AND STUDIES ......................................................................................................... 23
VII. OTHER PERMITS .................................................................................................................................. 23
VIII. CSWPPP ANALYSIS AND DESIGN ......................................................................................................... 23
IX. BOND QUANTITIES AND DECLARATION OF COVENANT ..................................................................... 23
X. OPERATION AND MAINTENANCE MANUAL ........................................................................................ 23
List of Figures
Figure 1- TIR Worksheet
Figure 2- Vicinity Map
Figure 3- Soils Map and Legend
Figure 4- Existing Conditions Map
Figure 5- Developed Conditions Map
Figure 6- Drainage Review Flow Chart
Figure 7- Downstream Map
Appendix A
Geotechnical Engineering Study, by Earth Solutions NW, LLC, dated May 22, 2018
Appendix B
WWHM2012 Output
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner ___________________________
Phone _________________________________
Address _______________________________
_______________________________________
Project Engineer _________________________
Company ______________________________
Phone _________________________________
Project Name _________________________
DPER Permit # ________________________
Location Township ______________
Range ________________
Section ________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse (e.g.,Subdivision / Short Subd. / UPD)
Building (e.g.,M/F / Commercial / SFR)
Clearing and Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Experimental / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: ______________________
2016 Surface Water Design Manual 4/24/2016
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: KCSWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: ____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
Part 10 SOILS
Soil Type
_________________
_________________
_________________
_________________
Slopes
_________________
_________________
_________________
_________________
Erosion Potential
_________________
_________________
_________________
_________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
2016 Surface Water Design Manual 4/24/2016
2
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Level: 1 / 2 / 3 or Exemption Number ____________
Flow Control BMPs _______________________________
Conveyance System Spill containment located at: _________________________
Erosion and Sediment Control /
Construction Stormwater
Pollution Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation
Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. ______________________
Landscape Management Plan: Yes / No
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): ______________
Datum:
Flood Protection Facilities Describe:
2016 Surface Water Design Manual 4/24/2016
3
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control
(comm ercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control
High-use Site: Yes / No
Treatment BMP: ________________________________
Maintenance Agreement: Yes / No
with whom? ____________________________________
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Protection of Flow Control BMP Facilities
(existing and proposed)
Maintain BMPs / Manage Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as
necessary
Flag limits of SAO and open space preservation
areas
Other ______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
________________
2016 Surface Water Design Manual 4/24/2016
4
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ___________________________
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other ______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Signed/Date
2016 Surface Water Design Manual 4/24/2016
5
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 1
I. PROJECT OVERVIEW
Project: Kislyak Preliminary Short Plat
Tax Parcel #: 894720-0110
Site Address: 34402 24th Place Southwest, Federal Way, WA 98023
Site Area: The tax parcel area is 1.74 Acres
Legal Description: VIRGINIA HILLS TGW UND 1/7 INT IN PVT RD PLAT LOT 11
Figure 2: Vicinity Map
Pre-Developed Site Conditions
The 75,869 SF (1.74 AC) project site is currently developed with a single-family residence, several out-
buildings, utilities, an onsite septic system, and an existing driveway access from 24 th Place SW. The
vegetation onsite consists of a lawn area on the central portion of the site, and an area that was previously
cleared on the eastern portion of the site. The topography slopes to the east at approximately 8-15%. See
Figure 4 for an Existing Site Conditions map.
Critical Areas
There are no critical areas or critical area buffers mapped on the site.
Soils
Per the US Department of Agriculture (USDA), Natural Resources Conservation Service (NCRS) Web Soil
Survey (WSS) information, the project site is generally underlain with Alderwood gravelly sandy loam. The
Geotechnical Engineering Study prepared by Earth Solutions NW, LLC, dated May 22, 2018 is included in
Appendix A of this report and confirms these soil conditions.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 2
Figure 3: Soils Map and Legend
Developed Site Conditions
The proposal incorporates the clearing, grading and platting of the 75,869 SF (1.74 AC) project site to
accommodate the construction of 5 total lots including 4 new single-family residences, associated utilities,
a public access road, and a private stormwater facility. The existing residence in the northwest corner of
the project site will be retained in Lot 1. The total limits of disturbance including off-site road and frontage
improvements is 63,098 SF (1.448 AC).
The project site is located within the Hylebos Creek Drainage Basin which is classified as a Level 2 Flow
Control Area on the City of Federal Way Flow Control Applications Map. Per the City of Federal Way’s
Review Comments, the project is required to meet the Level 3 flow control criteria due to a conveyance
restriction downstream of the site. For full discussion of Flow Control requirements see Section IV of this
report.
A combination detention and stormwater wetland will provide the required stormwater system for Level
3 flow control and Enhanced Basic water quality treatment. A “Life Estate Easement” is proposed for Lot
1 use of Lot 2. Lot 2 will remain undeveloped for the duration of this easement. Future Lot 2 improvements
have been included in all developed conditions and site coverage calculations. See Figure 5 for a
Developed Site Conditions Map.
NORTH
1 OF 1 EXISTING CONDITIONS MAP
KISLYAK PRELIMINARY SHORT PLATEncompass
Eastern Washington Division
407 Swiftwater Blvd. ▪ Cle Elum, WA 98922 ▪ Phone: (509) 674-7433
Western Washington Division
165 NE Juniper Street, Suite 201 ▪ Issaquah, WA 98027 ▪ Phone: (425) 392-0250
ENGINEERING & SURVEYING KISLYAK PRELIMINARY SHORT PLATNW 1/4 OF SE 1/4 OF SECTION 24, T. 21 N., R. 03 E., W.M.FEDERAL WAY, STATE OF WASHINGTONKnow what'sCallbelow.before you dig.RLEGAL DESCRIPTION:VERTICAL DATUM:BENCHMARK:BASIS OF BEARINGS:INSTRUMENTATION :SURVEY LEGEND:
LOT 1TRACT ALOT 4LOT 6LOT 5LOT 341.5'TRACT BTRACT CLOT 2NORTH
1 OF 1DEVELOPED CONDITIONS MAP
KISLYAK PRELIMINARY SHORT PLATEncompass
Eastern Washington Division
407 Swiftwater Blvd. ▪ Cle Elum, WA 98922 ▪ Phone: (509) 674-7433
Western Washington Division
165 NE Juniper Street, Suite 201 ▪ Issaquah, WA 98027 ▪ Phone: (425) 392-0250
ENGINEERING & SURVEYING KISLYAK PRELIMINARY SHORT PLATNW 1/4 OF SE 1/4 OF SECTION 24, T. 21 N., R. 03 E., W.M.FEDERAL WAY, STATE OF WASHINGTONKnow what'sCallbelow.before you dig.RNOTES:
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 5
II. CONDITIONS AND REQUIREMENTS SUMMARY
The 2016 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum
to the King County Surface Water Design Manual (Federal Way Addendum) were utilized for stormwater
design per the City of Federal Way requirements. This project is subject to a Full Drainage Review per
Section 1.1.2.4 of the 2016 KCSWDM. This project proposes to create approximately 34,930 SF of new
plus replaced impervious areas both on- and off-site.
Figure 6: Drainage Review Flow Chart
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 6
Core Requirements
Core Requirement #1: Discharge at the Natural Location
Currently, the existing site drains to a storm drain system along the north side of the property
which conveys flows east to the storm system in 22nd Place SW. This project proposes to convey
all target impervious surface runoff through a new storm drain system in the proposed Street “A”
to the proposed onsite stormwater detention facility. This facility will discharge to a newly
constructed stormwater CB on the south side of Street “A”, and flow east where it will connect
with the existing storm system in the intersection of 22nd Place SW and Street “A.” Refer to the
Downstream Analysis in Section III for a description of the existing discharge location.
Core Requirement #2: Offsite Analysis
The site is contained within a single drainage basin with runoff sheet flowing to the east or being
conveyed to the east by an existing storm drain system on the north side of the property. Refer
to the Downstream Analysis in Section III for a complete description of the existing drainage path.
Core Requirement #3: Flow Control Facilities
The project site is located within the Hylebos Creek Drainage Basin which is classified as a Level 2
Flow Control Area on the City of Federal Way Flow Control Applications Map. Per the City of
Federal Way’s Review Comments, the project is required to meet the Level 3 flow control criteria
due to a conveyance restriction downstream of the site. This requires the project to match the
developed discharge durations to the predeveloped durations for the range of predeveloped
discharge rates from 50% of the 2-year peak flow up to the full 50-year peak flow, match the
developed peak discharge rates to predeveloped peak discharge rates for the 2- and 10-year
return periods (Level 2 Flow Control), as well as match the developed 100-year peak discharge
rate to the predeveloped 100-year peak discharge rate. Historic site conditions (forested) have
been assumed for the predeveloped site conditions, and the existing residence on Lot 1 has been
retained in the predeveloped condition per Flood Problem Flow Control Areas Exceptions detailed
in section 1.2.3.1.C of the KCSWDM. The design volume for the proposed combination detention
and stormwater wetland has been determined using the WWHM software approved by the
Washington Department of Ecology. See the Flow Control Facilities design in Section IV of this
report for full discussion.
Core Requirement #4: Conveyance System
Conveyance system analysis will be provided with final engineering.
Core Requirement #5: Construction Stormwater Pollution Prevention
A temporary erosion and sediment control (TESC) plan to provide BMPs to be implemented during
construction is included with the preliminary engineering plan set. A clearing and grading permit
will be required for the project development.
Core Requirement #6: Maintenance and Operations
See Section X for details.
Core Requirement #7: Financial Guarantees and Liability
The owner will arrange for any financial guarantees and liabilities required by the permit.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 7
Core Requirement #8: Water Quality Facilities
The proposed project will create approximately 13,378 SF of pollution-generating impervious
surfaces (PGIS). The project site is located within the “Enhanced Basic Water Quality Treatment
Menu Required” area of the City of Federal Way Water Quality Applications Map. Enhanced Basic
Water Quality treatment will be applied to the project per Section 1.2.8.1 of the KCSWDM and
Section 1.2.8 of the Federal Way Addendum. Water quality requirements are proposed to be met
using a combination detention and stormwater wetland. See Section IV of this report for full
discussion of water quality facilities.
Core Requirement #9: On-Site BMPs
This project is within the UGA on a site less than 5 acres in size. Per section 3.1.2 of the Federal
Way Addendum, pre-engineered BMPs in Appendix C of the KCSWDM may be used instead of
modeling. Therefore, the project is subject to the Small Subdivision and Urban Subdivision
Projects BMP Requirements detailed in Section 1.2.9.3.1 of the KCSWDM. The proposed lots are
less than 22,000 SF; therefore, Individual Lot BMPs have been evaluated per Section 1.2.9.2.1 of
the KSWDM.
Plat Infrastructure BMPs
Per section 1.2.9.1 of the KSWDM, Target surfaces for flow control BMP requirements include
new impervious surfaces, new pervious surfaces, and replaced impervious surfaces not already
mitigated with an approved FCBMP or flow control facility. This project proposes a combination
detention and stormwater wetland to mitigate all target surfaces on-site. Therefore, flow control
BMPs are not required for Plat Infrastructure.
Individual Lot BMPs
1. Full Dispersion:
Full dispersion of runoff is not feasible. The 100-foot native vegetated flowpath length
requirements cannot be met. The individual lots also do not have the area available to meet
Native Growth Retention Area (NGRA) requirements.
2. Full Infiltration of Roof Runoff:
Full infiltration of roof runoff is not feasible based on the medium dense to dense glacial till
deposits found on-site per Geotechnical Engineering Study by Earth Solutions NW, LLC dated
May 22, 2018 (Appendix A).
3. Full Infiltration:
Full infiltration is not feasible based on the medium dense to dense glacial till deposits found
on-site per Geotechnical Engineering Study by Earth Solutions NW, LLC dated May 22, 2018
(Appendix A).
4. Limited Infiltration:
Limited Infiltration is feasible, provided an overflow structure is included. Both limited
infiltration drywells and gravel filled trenches have been designed to be constructed as part
of the individual lot building permits. Limited infiltration drywells have been designed to
accommodate 10% of the lot areas at 360 Cu-Ft / 1,000 SF of impervious surface using a sandy
loam classification inside the UGA (Rainfall region Seatac 1.0 and less) per Section C.2.3.4 of
the 2016 KCSWDM. Limited infiltration gravel filled trenches have been designed to
accommodate 10% of the lot areas at 36 feet / 1,000 SF of impervious surface using a sandy
loam classification inside the UGA (Rainfall region Seatac 1.0 and less) per Section C.2.3.3 of
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 8
the 2016 KCSWDM. See Section IV of this TIR for additional information on the drywell and
gravel trench design.
Feasibility of additional flow control BMPs will be evaluated during the single-family building
permit process.
Special Requirements
Special Requirement #1: Other Adopted Area-Specific Requirements
Critical Drainage Areas – N/A
Master Drainage Plan – N/A
Basin Plan – N/A
Salmon Conservation Plan – N/A
Stormwater Compliance Plans – N/A
Lake Management Plan – N/A
Flood Hazard Mitigation Plan – N/A
Shared Facility Drainage Plan – N/A
Special Requirement #2: Flood Hazard Area Delineation
This project does not lie in the FEMA 100-year floodplain.
Special Requirement #3: Flood Protection Facilities
This project does not rely on or propose to modify or construct a new flood protection facility.
Special Requirement #4: Source controls
Source control is not required for this project.
Special Requirement #5: Oil Control
This project is not considered high-use or in need of oil control.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 9
III. OFF-SITE ANALYSIS
Level 1 Downstream Analysis
A Level 1 Downstream Analysis was performed by Encompass Engineering and Surveying on Wednesday
February 14, 2018. The analysis was performed at approximately 3:00 PM with a temperature of about
45°. The site is currently developed with a single-family residence on the western portion of the site. There
is a lawn area on the central portion of the site, and the remaining area has been previously cleared. The
residence is accessed to the east via a private driveway from 24th Place SW. The site is contained within a
single drainage basin within the Hylebos Creek Drainage Basin which discharges to the Central Puget
Sound Watershed per King County iMap. The USGS Web Soil Survey has mapped the soils on site as
Alderwood gravelly sandy loam at slopes from 8-15%. Maps from the City of Federal Way’s Public Works
Development Services Division and Community Development Planning Division have been utilized for this
analysis per Section 2.3.1.1 of the CFWA.
Stormwater runoff from the residence drains to a 4” CPP pipe (A) which conveys flows north to the 12”
CPP storm drain (B) that runs the length of the site. This pipe connects via a 12” SD pipe (C) to the Type 1
CB (D) in 22nd Place SW. Stormwater runoff from the remainder of the site sheet flows (E) to the east off
the property where it is collected by the system of 12” SD pipes with catch basins (F) in 22nd Place SW.
This system also connects to the Type 1 CB (D) where the stormwater flows from both portions of the site
converge.
From here, runoff is conveyed east by a 12” SD pipe (G) in the SW 344th Court storm drain system. The
system also collects and conveys stormwater runoff from the “Eagle Manor” development to a Type 2 CB
– 72” (H). This structure directs flows through a 12” D.I. CL50 (I) to a Contech stormwater vault (J).
Stormwater outlets the vault through a 12” SD pipe (K) to a Level 3 stormwater detention pond (L) located
on the corner of SW 344th Street and 21st Avenue SW. This pond outlets via a 12” SD pipe (M) to the 42”
SD pipe (N) in 21st Avenue SW. The 21st Avenue SW system conveys flows north for approximately 2,500
feet. This Level 1 Downstream Analysis was completed at point (O) within the 42” SD pipe at 1,320 feet
downstream of the site discharge location.
King County iMap shows no relevant drainage complaints for the downstream area. There are 3 drainage
complaints to the east of the Fred Myer, located north of the property along 21st Avenue SW. These are
call fee inquiries and are not related do drainage issues. Based on this analysis no downstream problems
should occur with the proposed construction.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 10
Figure 7: Downstream Map
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 11
Off-site Analysis Drainage System Table
Surface Water Design Manual, Core Requirement #2
BASIN: Hylebos Creek SUBBASIN NAME: SUBBASIN NUMBER:
SYMBOL
DRAINAGE
COMPONENT
TYPE, NAME,
AND SIZE
DRAINAGE
COMPONENT
DESCRIPTION
SLOPE
DISTANCE
FROM SITE
DISCHARGE
EXISTING
PROBLEMS
POTENTIAL
PROBLEMS
OBSERVATIONS
OF FIELD
INSPECTOR,
RESOURCE
REVIEWER, OR
RESIDENT
(See
map)
Type: sheet flow,
swale, stream,
channel, pipe,
pond; Size:
diameter, surface
area
Drainage basin,
vegetation,
cover, depth,
type of sensitive
area, volume
% 1/4 Mile =
1,320 ft
Constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other erosion
Tributary area,
likelihood of
problem,
overflow
pathways,
potential impacts
A PIPE: 4” CPP
DRAINAGE FROM
EXISTING
RESIDENCE
2-5% ON-SITE NONE NONE
TO BE REPLACED
DURING SITE
GRADING
B PIPE: 12” CPP
DRAINAGE
ALONG NORTH
SIDE OF EXISTING
SITE
2-15%
POINT OF
DISCHARGE
#1 - 25'
NONE NONE
CONVEYS
STORMWATER
FROM SW 344TH
PLACE
DEVELOPMENT
C PIPE: 12” SD
DRAINAGE
ACROSS 22ND
PLACE SW
3.25% 25-53’ NONE NONE
CONVEYS
STORMWATER
EAST TO SW
344TH COURT
D TYPE 1 CB LOCATED IN
22ND PLACE SW N/A 53’ NONE NONE
CONVERGANCE
OF SITE
STORMWATER
RUNOFF
E SHEET FLOW
SHEET FLOW
THROUGH
FORESTED AREA
OFFSITE
2-15%
POINT OF
DISCHARGE
#2: 0-10’
NONE NONE
DRAINS EAST TO
22ND PLACE SW
SYSTEM
F PIPE: 12” SD W/
CATCH BASINS
LOCATED IN
22ND PLACE SW 1-5% 10-53’ NONE NONE
CONVEYS
STORMWATER
TO ELEMENT D
G PIPE: 12” SD LOCATED IN SW
344TH COURT 1-5% 53-346’ NONE NONE
DRAINGE SYSTEM
FOR EAGLE
MANOR
DEVELOPMENT
H TYPE 2 CB – 72” LOCATED IN SW
344TH COURT N/A 346’ NONE NONE
DRAINAGE TO
EAGLE MANOR
STORMWATER
DETENTION
POND
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 12
I PIPE: 12” D.I.
CL50 0.5% 346-358’ NONE NONE
DRAINAGE TO
EAGLE MANOR
STORMWATER
DETENTION
POND
J
CONTECH 8’x11’
STORMWATER
VAULT
CONTAINS 19
LOW DROP
MEDIA
CARTRIDGES
N/A 358-369’ NONE NONE
WATER QUALITY
TREATMENT FOR
EAGLE MANOR
STORMWATER
K PIPE: 12” SD 8% 369-394’ NONE NONE
DRAINAGE TO
EAGLE MANOR
STORMWATER
DETENTION
POND
L
LEVEL 3
STORMWATER
DETENTION
POND
PRIVATE
STORMWATER
FACILITY
N/A 394-450’ NONE NONE
STORMWATER
DETENTION
POND FOR EAGLE
MANOR
M PIPE: 12” SD
OUTFLOW FROM
STORMWATER
DETENTION
POND
0.5% 450-487’ NONE NONE
CONVEYANCE TO
21ST AVENEUE
SW STORM
DRAIN SYSTEM
N PIPE: 42” SD LOCATED IN 21ST
AVENUE SW 1-5% 487-1320’ NONE NONE CONVEYS FLOWS
NORTH
O PIPE: 42” SD LOCATED IN 21ST
AVENUE SW 1-5% 1320’ NONE NONE
END OF
DOWNSTREAM
ANALYSIS
Downstream Table
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 13
Site Access off 24th Place SW
Existing Residence
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 14
Existing Driveway to Lower Portion of the Property
Yard Drain Near North Property Line
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 15
Underground Stormwater System Location Along Northern Property Line
Existing Backyard
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 16
CB and Yard Drain Near East Property Line
Adjacent “Eagle Manor” Development
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 17
Downstream Stormwater Detention Pond
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 18
IV. FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY
FACILITY ANALYSIS AND DESIGN
Part A: Existing Site Hydrology
The 75,869 SF (1.74 AC) site is currently developed with a single-family residence, several out-buildings,
utilities, an onsite septic system, and an existing driveway access from 24th Place SW. The vegetation
onsite consists of a lawn area on the central portion of the site, and an area that was previously cleared
on the eastern portion of the site. The topography slopes to the east at approximately 8-15%. The site is
contained within a single drainage basin with runoff sheet flowing to the east or being conveyed to the
east by an existing storm drain system on the north side of the property which conveys flows east to the
system in 22nd Place SW. The full Downstream Analysis is included in Section III of this Technical
Information Report (TIR).
WWHM 2012 was used to model the existing condition within the 63,098 SF (1.448 AC) limits of
disturbance using the historic forested condition. The existing residence on Lot 1 has been retained in the
predeveloped condition per Flood Problem Flow Control Areas Exceptions detailed in section 1.2.3.1.C of
the KCSWDM. Due to the presence of the existing residence in both predeveloped and mitigated
conditions, the area of the residence has been removed from storm area calculations as it will not affect
the size of the facility. See the summary of existing and developed analyses on the following pages, as well
as the existing conditions map provided as Figure 4 for more details.
Part B: Developed Site Hydrology
The proposal incorporates the clearing, grading and platting of the project site to accommodate the
construction of 5 total lots including 4 new single-family residences, associated utilities, a public access
road, and a private stormwater facility. The existing residence in the northwest corner of the project site
will be retained in Lot 1 and is excluded from site area calculations. The total clearing limits including off-
site road and frontage improvements is 63,098 SF (1.48 AC).
This project proposes to convey all target impervious surface runoff through a new storm drain system in
the proposed Street “A” to the proposed onsite combination detention and stormwater wetland. This
facility will discharge to a newly constructed stormwater CB on the south side of Street “A”, and flow east
where it will connect with the existing storm system in the intersection of 22 nd Place SW and Street “A.”
Due to the location of the easternmost catch basin, a portion of the target impervious area near the
intersection of 22nd Place SW and Street “A” will not be able to be conveyed into the proposed stormwater
detention system. An area swap is proposed, which will convey an equivalent impervious area located on
24th Place SW to the west of the site to the proposed stormwater detention system.
The project will be designed to comply with the Subdivision Projects BMP Requirements detailed in
Section 1.2.9.3.1 of the 2017 KSWDM. Both limited infiltration drywells and limited infiltration gravel filled
trenches have been designed for each lot to allow for flexibility depending on individual lot conditions.
These BMPs will be constructed as part of the individual lot building permits. Drywells have been designed
to accommodate 10% of the lot areas at 360 Cu-Ft / 1,000 SF of impervious surface using a sandy loam
classification inside the UGA (Rainfall region Seatac 1.0 and less) per Section C.2.3.4 of the 2016 KCSWDM.
Gravel filled trenches have been designed to accommodate 10% of the lot areas at 36 feet / 1,000 SF of
impervious surface using a sandy loam classification inside the UGA (Rainfall region Seatac 1.0 and less)
per Section C.2.3.3 of the 2016 KCSWDM. The following tables show the required drywell and infiltration
trench sizing for each lot.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 19
LOT AREA (SF)
10% OF LOT AREA
(SF)
DRYWELL VOLUME
(CU-FT)
8’ DIAMETER DRYWELL
DEPTH (FT)
2 7616 762 274 5.5
3 7200 720 259 5.2
4 7200 720 259 5.2
5 7200 720 259 5.2
Table 1: Required Drywell Sizing
LOT AREA (SF) 10% OF LOT AREA (SF)
2’ WIDE TRENCH
LENGTH (FT)
5’ WIDE TRENCH
LENGTH (FT)
2 7616 762 28 11.2
3 7200 720 26 10.4
4 7200 720 26 10.4
5 7200 720 26 10.4
Table 2: Required Infiltration Trench Sizing
Part C: Performance Standards
The project site is located within the Hylebos Creek Drainage Basin which is classified as a Level 2 Flow
Control Area on the City of Federal Way Flow Control Applications Map. Per the City of Federal Way’s
Review Comments, the project is required to meet the Level 3 flow control criteria due to a conveyance
restriction downstream of the site. The project site is therefore subject to level 3 flow control (Historic
site conditions). In the Flood Problem Flow Control Areas, flow control facilities are required to match the
developed discharge durations to the predeveloped durations for the range of predeveloped discharge
rates from 50% of the 2-year peak flow up to the full 50-year peak flow, match the developed peak
discharge rates to predeveloped peak discharge rates for the 2- and 10-year return periods (Level 2 Flow
Control), as well as match the developed 100-year peak discharge rate to the predeveloped 100-year peak
discharge rate. See the predeveloped and mitigated flows meeting these standards below. In addition,
this site is designed to comply with the Small Subdivision Project BMP Requirements detailed in Section
1.2.9.3.1 of the 2016 KCSWDM.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 20
This project proposes to create approximately 13,378 SF of pollution-generating impervious surfaces
(PGIS). The project site is located within the “Enhanced Basic Water Quality Treatment Menu Required”
area of the City of Federal Way Water Quality Applications Map. Enhanced Basic Water Quality treatment
will be applied to the project per Section 1.2.8.1 of the KCSWDM and Section 1.2.8 of the Federal Way
Addendum.
Part D: Flow Control System
This project proposes the construction of a combination detention and stormwater wetland designed per
Section 5.1.1 of the KCSWDM. The proposed facility is 52-feet in width by 102-feet in length and will be
located on the eastern boundary of the site. The stormwater detention and water quality volumes for the
proposed development were determined using WWHM2012. The pond will outlet via a control structure
and discharge to a newly constructed stormwater CB on the south side of Street “A”, where to will connect
to the existing storm system in the intersection of 22nd Place SW and Street “A.” The basin area breakdown
is included below in Table 3. Lot impervious surface coverage is assumed to be the maximum per zoning
(60%).
On-site + Off-Site Existing Proposed
Condition Measured Modeled Measured Modeled
Forest, Mod 31,549 SF
(0.724 AC)
31,549 SF
(0.724 AC)
Forest, Steep 31,549 SF
(0.724 AC)
31,549 SF
(0.724 AC)
Lawn, Flat
11,084 SF
(0.254 AC)
11,084 SF
(0.254 AC)
Lawn, Mod: 11,084 SF
(0.254 AC)
11,084 SF
(0.254 AC)
Road, Flat 2,000 SF
(0.046 AC)
2,000 SF
(0.046 AC)
Road, Mod: 9,770 SF
(0.224 AC)
9,770 SF
(0.224 AC)
Roof, Flat: 20,029 SF
(0.460 AC)
20,029 SF
(0.460 AC)
Driveway, Flat: 1,608 SF
(0.037 AC)
1,608 SF
(0.037 AC)
Sidewalk, Flat:
1,523 SF
(0.035 AC)
1,523 SF
(0.035 AC)
Pond 6,000 SF
(0.138 AC)
6,000 SF
(0.138 AC)
Total Area: 63,098 SF
(1.448 AC)
63,098 SF
(1.448 AC)
63,098 SF
(1.448 AC)
63,098 SF
(1.448 AC)
Table 3: Basin Area Breakdown
Based on the WWHM Model, the required water storage volume for this pond is 21,985 CF. A total water
storage volume of 22,063 CF is proposed to meet this requirement. See the full WWHM output in
Appendix B.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 21
Overflow Capacity:
The City of Federal Way uses the 2016 KCSWDM for the design of flow control facility overflow structures.
In the event that the control structure becomes plugged, causing the pond to fill rapidly to the overflow
structure, the overflow system was analyzed to verify it has adequate capacity. To verify the capacity of
the system to convey the 100-year flow in the overflow condition, the inflow into the pond was used and
was determined to be 0.8981 CFS by WWHM. See WWHM clip below:
The overflow weir was analyzed using the Rectangular, Sharp-Crested Weir flow equation provided by
Figure 5.1.4.E in the KCSWDM:
Q=C(L - 0.2H)H3/2
where
Q = flow (cfs)
C = 3.27 + 0.40 H/P (ft)
H = 0.5’
P = 3.65’
L = length (ft) of the portion of the riser circumference as necessary not to exceed 50 percent of
the circumference
D = inside riser diameter (ft)
Inserting values, for all known quantities results in C = 3.27 + .4(.5/3.65) or 3.32
Inserting C into the flow equation results in:
1.47 = 3.32(L – 0.2*0.5)(0.53/2)
Which when solved for L results in L = 1.35’ minimum length to convey the 100-year flow rate. A
factor of safety of 1.5 brings the designed length to 2.03’, which is less than 50 percent of the
circumference of the 54” diameter control structure.
The emergency overflow capacity of the riser to convey the 100-year inflow into the pond was calculated
using Figure 5.1.4.H of the 2016 KCSWDM (see below). The figure revealed that to convey 0.8981 CFS
through a 12” riser, 0.12’ of head would be required. The pond has been designed with 1.0’ of freeboard
above the top of the riser, therefore, the riser has the capacity to convey the flow to the outlet pipe
without allowing stormwater to flow over the side of the pond.
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 22
Emergency Overflow Structure:
The City of Kent uses the 2016 KCSWDM for the design of flow control facility emergency overflow
structures. In addition to the overflow capacity of the control structure, an emergency overflow
structure has been sized to pass the 100-year, 15-minute developed peak flow in the event of total
control structure failure. A Type II manhole fitted with a birdcage has been designed per Section 5.1.1.1
of the 2016 KCSWDM to accommodate the 100-year developed peak flow, with a minimum 6 inches of
freeboard.
Part E: Water Quality System
Developed stormwater runoff from Pollution-Generating Impervious Surfaces will be treated to meet the
Enhanced Basic water quality standards detailed in Section 1.2.8.1.A of the KCSWDM. A combination
detention and stormwater wetland is proposed to meet these requirements.
Per the Basic Wetpond Methods of Analysis outlined in section 6.4.1.1 of the KCSWDM, the wetpond
requires a volume equal to 91% of the treatment volume. A 0.1312 Ac-Ft treatment volume was provided
from WWHM, therefore the required wetpond volume is 0.91(0.1312 x 43,560) = 5,201 CF. A 5,498 CF
wetpond cell has been provided.
0.89 CFS
0.12 FEET
CFS
Kislyak Preliminary Short Plat Preliminary Technical Information Report
07/22/2021 Page 23
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Conveyance system analysis and design will be provided with final engineering.
VI. SPECIAL REPORTS AND STUDIES
Geotechnical Engineering Study, by Earth Solutions NW, LLC, dated May 22, 2018
VII. OTHER PERMITS
Building Permits, NPDES, and Lakehaven Utility District permits are required and will be
provided with final engineering.
VIII. CSWPPP ANALYSIS AND DESIGN
An Erosion and Sediment Control Plan (TESC) and is included with the preliminary engineering
plan set. A Construction Stormwater Pollution Prevention Plan (CSWPPP) will be prepared and
provided with final engineering.
IX. BOND QUANTITIES AND DECLARATION OF COVENANT
Bond Quantities and Declaration of Covenant documents will be provided with final engineering.
X. OPERATION AND MAINTENANCE MANUAL
An Operation and Maintenance Manual will be provided with final engineering.
Appendix A
Geotechnical Engineering Study Proposed Residential Development 34402 – 24th Place
Southwest Federal Way, Washington by Earth Solutions NW, LLC dated May 22, 2018
EarthSolutionsNWLLC
EarthSolutions
NW LLC
Geotechnical Engineering
Geology
Environmental Services
Construction Observation/Testing
1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005
(425)449-4704 Fax (425)449-4711
www.earthsolutionsnw.com
GEOTECHNICAL ENGINEERING STUDY
PROPOSED RESIDENTIAL DEVELOPMENT
34402 -24 PLACE SOUTHWEST
FEDERAL WAY,WASHINGTON
ES-5791
TH
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction
EarthSolutionsNWLLC
EarthSolutions
NW LLC Observation/Testing and Environmental Services
Vicinity Map
34402 –24th Place S.W.
Federal Way,Washington
MRS
SES
04/20/2018
April 2018
5791
1
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
King County,Washington
Map 744
By The Thomas Guide
Rand McNally
32nd Edition
SITE
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction
EarthSolutionsNWLLC
EarthSolutions
NW LLC Observation/Testing and Environmental Services
Test Pit Location Plan
34402 –24th Place S.W.
Federal Way,Washington
MRS
SES
04/20/2018
April 2018
5791
2
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
0 3 0 6 0 1 2 0
Sc ale in Feet1"=6 0 '
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-5791,April 2018
Subject Site
Existing Building
Proposed Lot Number
TP-1
TP-2
TP-3
TP-4
TP-1
Sheds
Shed
House
420
410 400 390 380420
410 400 390 380 22NDPLACES.W.S.W.344TH
COURT
S.W. 344TH STREET
24TH PLACE S.W.1 32
4
5
6
Tract A
5
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutions
NW LLC Geotechnical Engineer ing,C onstr uction
Observation/Testing and Environmental Services
34402 –24th Place S.W.
Federal Way,Washington
MRS
SES
04/20/2018
April 2018
5791
3
RETAINING WALL DRAINAGE DETAIL
NOTES:
Free-draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing No.4 sieve should be
25 to 75 percent.
Sheet Drain may be feasible in lieu
of Free-draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1-inch
Drain Rock.
LEGEND:
Free-draining Structural Backfill
1-inch Drain Rock
18"Min.
Structural
Fill
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction
Observation/Testing and Environmental Services
EarthSolutionsNWLLC
EarthSolutions
NW LLC
34402 –24th Place S.W.
Federal Way,Washington
MRS
SES
04/20/2018
April 2018
5791
4
FOOTING DRAIN DETAIL
Slope
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
18"Min.
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal:native soil or
other low-permeability material.
1-inch Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
Appendix B
WWHM2012 Output
WWHM2012
PROJECT REPORT
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 2
General Model Information
Project Name:17678 - Kislyak 4-75 DEEP
Site Name:
Site Address:
City:
Report Date:2/17/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/10/10
Version:4.2.16
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Mod 0.724
C, Forest, Steep 0.724
Pervious Total 1.448
Impervious Land Use acre
Impervious Total 0
Basin Total 1.448
Element Flows To:
Surface Interflow Groundwater
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.2544
C, Lawn, Mod 0.2544
Pervious Total 0.5088
Impervious Land Use acre
ROADS FLAT 0.0459
ROADS MOD 0.2243
ROOF TOPS FLAT 0.4598
DRIVEWAYS FLAT 0.0369
SIDEWALKS FLAT 0.035
POND 0.1377
Impervious Total 0.9396
Basin Total 1.4484
Element Flows To:
Surface Interflow Groundwater
Trapezoidal Pond 1 Trapezoidal Pond 1
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 5
Routing Elements
Predeveloped Routing
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 6
Mitigated Routing
Trapezoidal Pond 1
Bottom Length:99.00 ft.
Bottom Width:50.00 ft.
Depth:5.15 ft.
Volume at riser head:0.5047 acre-feet.
Side slope 1:0 To 1
Side slope 2:0 To 1
Side slope 3:0 To 1
Side slope 4:3 To 1
Discharge Structure
Riser Height:4.15 ft.
Riser Diameter:12 in.
Notch Type:Rectangular
Notch Width:0.021 ft.
Notch Height:1.100 ft.
Orifice 1 Diameter:0.8125 in.Elevation:0 ft.
Orifice 2 Diameter:0.7656 in.Elevation:2.25 ft.
Element Flows To:
Outlet 1 Outlet 2
Pond Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
365.90 0.113 0.000 0.000 0.000
365.96 0.113 0.006 0.004 0.000
366.01 0.114 0.013 0.006 0.000
366.07 0.114 0.019 0.007 0.000
366.13 0.114 0.026 0.008 0.000
366.19 0.114 0.032 0.009 0.000
366.24 0.114 0.039 0.010 0.000
366.30 0.115 0.045 0.011 0.000
366.36 0.115 0.052 0.012 0.000
366.42 0.115 0.059 0.012 0.000
366.47 0.115 0.065 0.013 0.000
366.53 0.115 0.072 0.014 0.000
366.59 0.116 0.078 0.014 0.000
366.64 0.116 0.085 0.015 0.000
366.70 0.116 0.092 0.016 0.000
366.76 0.116 0.098 0.016 0.000
366.82 0.116 0.105 0.017 0.000
366.87 0.117 0.112 0.017 0.000
366.93 0.117 0.118 0.018 0.000
366.99 0.117 0.125 0.018 0.000
367.04 0.117 0.132 0.019 0.000
367.10 0.117 0.139 0.019 0.000
367.16 0.118 0.145 0.020 0.000
367.22 0.118 0.152 0.020 0.000
367.27 0.118 0.159 0.021 0.000
367.33 0.118 0.166 0.021 0.000
367.39 0.118 0.172 0.021 0.000
367.45 0.119 0.179 0.022 0.000
367.50 0.119 0.186 0.022 0.000
367.56 0.119 0.193 0.023 0.000
367.62 0.119 0.200 0.023 0.000
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 7
367.67 0.119 0.207 0.023 0.000
367.73 0.119 0.213 0.024 0.000
367.79 0.120 0.220 0.024 0.000
367.85 0.120 0.227 0.025 0.000
367.90 0.120 0.234 0.025 0.000
367.96 0.120 0.241 0.025 0.000
368.02 0.120 0.248 0.026 0.000
368.07 0.121 0.255 0.026 0.000
368.13 0.121 0.262 0.026 0.000
368.19 0.121 0.269 0.030 0.000
368.25 0.121 0.276 0.032 0.000
368.30 0.121 0.283 0.034 0.000
368.36 0.122 0.290 0.035 0.000
368.42 0.122 0.297 0.036 0.000
368.48 0.122 0.304 0.037 0.000
368.53 0.122 0.311 0.038 0.000
368.59 0.122 0.318 0.039 0.000
368.65 0.123 0.325 0.040 0.000
368.70 0.123 0.332 0.041 0.000
368.76 0.123 0.339 0.042 0.000
368.82 0.123 0.346 0.043 0.000
368.88 0.123 0.353 0.044 0.000
368.93 0.124 0.360 0.045 0.000
368.99 0.124 0.367 0.046 0.000
369.05 0.124 0.374 0.048 0.000
369.10 0.124 0.381 0.051 0.000
369.16 0.124 0.389 0.054 0.000
369.22 0.125 0.396 0.058 0.000
369.28 0.125 0.403 0.061 0.000
369.33 0.125 0.410 0.065 0.000
369.39 0.125 0.417 0.069 0.000
369.45 0.125 0.424 0.073 0.000
369.51 0.126 0.432 0.078 0.000
369.56 0.126 0.439 0.082 0.000
369.62 0.126 0.446 0.086 0.000
369.68 0.126 0.453 0.091 0.000
369.73 0.126 0.461 0.095 0.000
369.79 0.127 0.468 0.100 0.000
369.85 0.127 0.475 0.104 0.000
369.91 0.127 0.482 0.109 0.000
369.96 0.127 0.490 0.114 0.000
370.02 0.127 0.497 0.119 0.000
370.08 0.128 0.504 0.170 0.000
370.13 0.128 0.512 0.382 0.000
370.19 0.128 0.519 0.680 0.000
370.25 0.128 0.526 1.025 0.000
370.31 0.128 0.534 1.379 0.000
370.36 0.129 0.541 1.707 0.000
370.42 0.129 0.548 1.976 0.000
370.48 0.129 0.556 2.171 0.000
370.54 0.129 0.563 2.302 0.000
370.59 0.129 0.571 2.446 0.000
370.65 0.130 0.578 2.566 0.000
370.71 0.130 0.586 2.681 0.000
370.76 0.130 0.593 2.790 0.000
370.82 0.130 0.600 2.895 0.000
370.88 0.130 0.608 2.996 0.000
370.94 0.131 0.615 3.094 0.000
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 8
370.99 0.131 0.623 3.189 0.000
371.05 0.131 0.630 3.281 0.000
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:16 PM Page 9
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.448
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.5088
Total Impervious Area:0.9396
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.05411
5 year 0.086967
10 year 0.107811
25 year 0.132396
50 year 0.149314
100 year 0.165046
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.031581
5 year 0.048359
10 year 0.062431
25 year 0.084111
50 year 0.103458
100 year 0.125873
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.061 0.022
1950 0.069 0.033
1951 0.110 0.083
1952 0.038 0.020
1953 0.030 0.025
1954 0.043 0.026
1955 0.076 0.025
1956 0.059 0.040
1957 0.052 0.026
1958 0.052 0.029
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 10
1959 0.044 0.023
1960 0.079 0.064
1961 0.043 0.035
1962 0.029 0.020
1963 0.039 0.026
1964 0.051 0.027
1965 0.036 0.040
1966 0.034 0.024
1967 0.081 0.030
1968 0.045 0.025
1969 0.046 0.024
1970 0.039 0.025
1971 0.042 0.027
1972 0.086 0.050
1973 0.041 0.037
1974 0.042 0.027
1975 0.064 0.025
1976 0.044 0.026
1977 0.007 0.022
1978 0.040 0.032
1979 0.022 0.019
1980 0.102 0.067
1981 0.033 0.025
1982 0.076 0.045
1983 0.057 0.026
1984 0.037 0.022
1985 0.021 0.023
1986 0.094 0.039
1987 0.082 0.052
1988 0.034 0.023
1989 0.021 0.022
1990 0.185 0.066
1991 0.103 0.055
1992 0.044 0.033
1993 0.042 0.022
1994 0.014 0.019
1995 0.054 0.034
1996 0.126 0.084
1997 0.106 0.088
1998 0.030 0.022
1999 0.102 0.056
2000 0.043 0.034
2001 0.009 0.018
2002 0.049 0.042
2003 0.068 0.024
2004 0.089 0.085
2005 0.060 0.026
2006 0.063 0.039
2007 0.140 0.138
2008 0.179 0.084
2009 0.083 0.041
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1850 0.1382
2 0.1790 0.0884
3 0.1399 0.0848
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 11
4 0.1258 0.0843
5 0.1104 0.0837
6 0.1055 0.0835
7 0.1031 0.0665
8 0.1023 0.0660
9 0.1016 0.0639
10 0.0939 0.0561
11 0.0889 0.0549
12 0.0864 0.0517
13 0.0829 0.0497
14 0.0825 0.0452
15 0.0808 0.0417
16 0.0793 0.0412
17 0.0758 0.0397
18 0.0757 0.0395
19 0.0690 0.0392
20 0.0683 0.0385
21 0.0636 0.0373
22 0.0628 0.0351
23 0.0612 0.0342
24 0.0601 0.0339
25 0.0587 0.0333
26 0.0568 0.0328
27 0.0544 0.0319
28 0.0523 0.0296
29 0.0521 0.0289
30 0.0511 0.0268
31 0.0487 0.0267
32 0.0460 0.0266
33 0.0452 0.0263
34 0.0441 0.0261
35 0.0438 0.0260
36 0.0436 0.0258
37 0.0432 0.0256
38 0.0430 0.0255
39 0.0427 0.0254
40 0.0419 0.0251
41 0.0417 0.0251
42 0.0416 0.0250
43 0.0410 0.0248
44 0.0402 0.0245
45 0.0395 0.0245
46 0.0388 0.0243
47 0.0384 0.0236
48 0.0373 0.0230
49 0.0364 0.0228
50 0.0342 0.0226
51 0.0342 0.0224
52 0.0326 0.0224
53 0.0304 0.0221
54 0.0299 0.0217
55 0.0292 0.0216
56 0.0219 0.0216
57 0.0211 0.0202
58 0.0205 0.0199
59 0.0141 0.0194
60 0.0086 0.0190
61 0.0069 0.0185
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 12
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 13
Duration Flows
The Facility PASSED
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0271 13107 10596 80 Pass
0.0283 11914 10125 84 Pass
0.0295 10868 9648 88 Pass
0.0308 9935 9133 91 Pass
0.0320 9037 8532 94 Pass
0.0332 8243 7841 95 Pass
0.0345 7574 7065 93 Pass
0.0357 6977 6314 90 Pass
0.0369 6412 5557 86 Pass
0.0382 5910 4919 83 Pass
0.0394 5454 4229 77 Pass
0.0406 5026 3717 73 Pass
0.0419 4614 3292 71 Pass
0.0431 4263 2926 68 Pass
0.0443 3998 2522 63 Pass
0.0456 3713 2095 56 Pass
0.0468 3465 1876 54 Pass
0.0480 3236 1705 52 Pass
0.0493 3031 1564 51 Pass
0.0505 2834 1431 50 Pass
0.0518 2644 1320 49 Pass
0.0530 2470 1205 48 Pass
0.0542 2286 1114 48 Pass
0.0555 2102 1043 49 Pass
0.0567 1935 986 50 Pass
0.0579 1779 927 52 Pass
0.0592 1641 878 53 Pass
0.0604 1528 830 54 Pass
0.0616 1413 776 54 Pass
0.0629 1311 725 55 Pass
0.0641 1214 655 53 Pass
0.0653 1123 601 53 Pass
0.0666 1036 525 50 Pass
0.0678 983 489 49 Pass
0.0690 934 457 48 Pass
0.0703 888 431 48 Pass
0.0715 842 408 48 Pass
0.0727 798 389 48 Pass
0.0740 748 359 47 Pass
0.0752 703 325 46 Pass
0.0765 666 298 44 Pass
0.0777 628 269 42 Pass
0.0789 594 239 40 Pass
0.0802 559 213 38 Pass
0.0814 520 190 36 Pass
0.0826 468 165 35 Pass
0.0839 434 137 31 Pass
0.0851 392 117 29 Pass
0.0863 364 104 28 Pass
0.0876 325 93 28 Pass
0.0888 295 85 28 Pass
0.0900 271 81 29 Pass
0.0913 243 74 30 Pass
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 14
0.0925 217 69 31 Pass
0.0937 192 66 34 Pass
0.0950 175 64 36 Pass
0.0962 153 61 39 Pass
0.0974 134 58 43 Pass
0.0987 124 55 44 Pass
0.0999 112 53 47 Pass
0.1012 97 51 52 Pass
0.1024 88 48 54 Pass
0.1036 76 46 60 Pass
0.1049 67 44 65 Pass
0.1061 55 42 76 Pass
0.1073 52 40 76 Pass
0.1086 47 38 80 Pass
0.1098 44 36 81 Pass
0.1110 42 34 80 Pass
0.1123 41 30 73 Pass
0.1135 38 24 63 Pass
0.1147 35 21 60 Pass
0.1160 33 20 60 Pass
0.1172 30 17 56 Pass
0.1184 29 15 51 Pass
0.1197 27 12 44 Pass
0.1209 24 11 45 Pass
0.1221 21 11 52 Pass
0.1234 19 10 52 Pass
0.1246 16 10 62 Pass
0.1259 14 9 64 Pass
0.1271 12 8 66 Pass
0.1283 11 8 72 Pass
0.1296 11 8 72 Pass
0.1308 7 5 71 Pass
0.1320 6 4 66 Pass
0.1333 6 4 66 Pass
0.1345 5 3 60 Pass
0.1357 4 2 50 Pass
0.1370 4 2 50 Pass
0.1382 4 1 25 Pass
0.1394 4 0 0 Pass
0.1407 3 0 0 Pass
0.1419 3 0 0 Pass
0.1431 3 0 0 Pass
0.1444 3 0 0 Pass
0.1456 3 0 0 Pass
0.1468 3 0 0 Pass
0.1481 3 0 0 Pass
0.1493 3 0 0 Pass
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 15
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.1312 acre-feet
On-line facility target flow:0.1534 cfs.
Adjusted for 15 min:0.1534 cfs.
Off-line facility target flow:0.0857 cfs.
Adjusted for 15 min:0.0857 cfs.
17678 - Kislyak 4-75 DEEP 2/17/2021 4:34:49 PM Page 16
LID Report
17678 - Kislyak 4-75 DEEP 2/17/2021 4:35:13 PM Page 17
POC 2
POC #2 was not reported because POC must exist in both scenarios and both scenarios
must have been run.
17678 - Kislyak 4-75 DEEP 2/17/2021 4:35:13 PM Page 18
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
17678 - Kislyak 4-75 DEEP 2/17/2021 4:35:13 PM Page 19
Appendix
Predeveloped Schematic
17678 - Kislyak 4-75 DEEP 2/17/2021 4:35:14 PM Page 20
Mitigated Schematic