011 Trip Generation Analysis TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: September 19, 2017 TO: Rick Perez / Sarady Long City of Federal Way FROM: Jeff Schramm TENW SUBJECT: Trip Generation Memo for the proposed IRG Greenline – Federal Way TENW Project #5219 This memorandum documents the trip generation estimate for the proposed IRG Greenline in Federal Way, WA and includes a project description and trip generation estimate. Project Description The project site is located on the west side of Weyerhaeuser Way S, east of I-5, and north of the proposed IRG Warehouse A and Warehouse B developments. A vicinity map of the surrounding area is shown in Attachment A. The project includes the development of up to 1,068,000 square feet of warehouse building area. The existing site is vacant. Primary vehicular access is proposed at three locations along Weyerhaeuser Way S. Project buildout is expected in 2020. A preliminary site plan concept is shown in Attachment B. Trip Generation The trip generation estimate for the proposed IRG Greenline industrial development was based on methodology documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual 9th edition for LUC 150 (Warehousing). Table 1 summarizes the total trip generation estimate. A detailed trip generation calculation can be found in Attachment C. Table 1 Trip Generation Summary New Trips Generated (PASSENGER VEHICLES ONLY) New Trips Generated (TRUCKS ONLY) Total New Trips Generated (ALL VEHICLES) Time Period In Out Total In Out Total In Out Total Daily 1,511 1,512 3,023 378 378 756 1,889 1,890 3,779 AM Peak Hour 192 51 243 48 13 61 240 64 304 PM Peak Hour 55 162 217 13 41 54 68 203 271 As shown in Table 1, the IRG Greenline industrial development is estimated to generate 3,779 new weekday daily trips with 304 new trips during the weekday AM peak hour (240 in, 64 out) and 271 new trips during the weekday PM peak hour (68 in, 203 out). Trip Generation Memo IRG Greenline TENW September 19, 2017 Page 2 If you have any questions regarding the information presented in this memo, please call me at (425) 250- 5001 or email me at schramm@tenw.com. cc: Tom Messmer – IRG Eric LaBrie, ESM Consulting Engineers Jeff Haynie, P.E. – TENW Principal Attachments: A. Project Site Vicinity B. Preliminary Site Plan C. Trip Generation Calculation Trip Generation Memo IRG Greenline ATTACHMENT A Vicinity Map Trip Generation Memo IRG Greenline ATTACHMENT B Preliminary Site Plan Trip Generation Memo IRG Greenline ATTACHMENT C Trip Generation Calculations ITE Land Use Units 1 LUC 2 In Out Trip Rate In Out Total Truck Trip Percentage 2 Enter Exit Total Enter Exit Total Daily Proposed Use: Warehouse 1,068,000 GFA 150 50%50%eqn 1,889 1,890 3,779 20%378 378 756 1,511 1,512 3,023 Net New Daily Trips = 1,889 1,890 3,779 378 378 756 1,511 1,512 3,023 AM Peak Hour Proposed Use: Warehouse 1,068,000 GFA 150 79%21%eqn 240 64 304 20%48 13 61 192 51 243 Net New AM Peak Hour Trips = 240 64 304 48 13 61 192 51 243 PM Peak Hour Proposed Use: Warehouse 1,068,000 GFA 150 25%75%eqn 68 203 271 20%13 41 54 55 162 217 Net New PM Peak Hour Trips = 68 203 271 13 41 54 55 162 217 Notes: 2 Land Use Code and trip rates based on ITE Trip Generation Manual, 9th Edition, 2012. 1 GFA = Gross Floor Area. Non-Truck Trip GenerationTruck Trip Generation IRG Federal Way - Greenline Trip Generation Summary Directional Distribution Trips Generated 9/19/2017