Loading...
20-101386-Structural Plan-04-09-2020-V11'-6"1'-0"1'-6"1'-6"1'-6"1'-6"1'-0" 21'-9"1'-4" 23'-0" 24'-3" 1'-4" 25'-5"1'-4" 1'-4" 26'-8"1'-4" 1'-0"1'-6"1'-6"1'-0"Nelco Architecture, Inc.Phone:Suite 1300Seattle, WA 98101(206) 408-85001200 Fifth Ave.WWW.NELSONWORLDWIDE.COM            Proj. No:Reviewed By:SEAL:CITY STAMP:IRGMS/PM IRG GREENLINEBUILDING AWEYERHAEUSER WAYS SFEDERAL WAY, WA 98001CR.00180070.000 CLIENT:PROJECT:11111 SANTA MONICA BLVD.SUITE 800LOS ANGELES, CA 90025Date:No:Description:Permit Submittal02/05/2020EXTERIOR DETAILSA8.3TRELLIS DETAIL2A8.3TRELLIS DETAIL1A8.3GENERAL NOTES:KEY NOTES:1.ALL INSULATION SHALL BE PER THE COVERSHEET AND THE WSEC.2.ANY FUTURE INSTALLED EXPOSED INSULATION AND FACING SHALL CONFORM TOIBC SECTION 7201.STRUCTURAL FILL PER GEOTECHNICAL REPORT AND STRUCTURAL DRAWINGS.2.CONCRETE FOOTING PER STRUCTURAL.3.CONCRETE WALK, SLOPE AWAY FROM BUILDING AT 1:48 AT LANDINGS.4.CONCRETE SLAB PER STRUCTURAL.5.CONCRETE TILT UP WALL PANELS. PER STRUCTURAL, PAINT PER EXTERIOR ELEVATIONS.6.EXTEND TPO ROOFING UP OVER PANEL AND UNDER METAL COPING, AT PARAPETS PERMANUFACTURERS RECOMMENDATIONS, WHERE PARAPET EXCEEDS RECOMMENDED HEIGHT,INSTALL TERMINATION BAR AS REQUIRED.7.REVEAL, TYP. SEE DETAIL 3/A8.18.2X WOOD NAILER, PER STRUCTURAL.9.ALUMINUM STOREFRONT SYSTEM - SEE EXTERIOR ELEVATIONS.10.STEEL JOIST PER STRUCTURAL.11.METAL COPING, PER EXTERIOR ELEVATIONS.12.WOOD DECK, PER STRUCTURAL.13.RIGID INSULATION, PER COVERSHEET.14.TPO ROOFING SYSTEM, PER ROOF PLAN.15.VAPOR BARRIER WITH 4" SAND AT FUTURE OFFICE AREAS ONLY, AS NOTED ON FLOOR PLANS.16.CONTINUOUS STEEL ANGLE LEDGER PER STRUCTURAL.17.OVERFLOW SCUPPER BEYOND, SEE DETAIL 11/A8.1 & 9/A8.118.STEEL CANOPY, PER STRUCTURAL. PAINT PER EXTERIOR ELEVATIONS.19.CONCRETE TRUCK COURT.20.CONCRETE PAD PER STRUCTURAL.21.HIGH POINT OF TPO ROOF BEYOND.22.SECTIONAL INSULATED O/H DOOR23.DOCK BUMPER24.3/8" BENT PLATE "Z" GUARD, TO 3'-6" AFF.25.STEEL ANGLE TO 4'-0'' AFF, SEE STRUCTURAL.26.HM FRAME AND DOOR, PAINT PER ELEVATIONS.27.2X WOOD PURLIN, PER STRUCTURAL28.STEEL TRELLIS PER STRUCTURAL. SEE EXTERIOR ELEVATIONS AND ROOF PLAN.29.STEEL COLUMN PER STRUCTURAL.30.INTERSTITIAL ROOF FRAMING, TBD31.PHENOLIC RESIN PANEL, SIMULATED WOOD GRAIN TEXTURE, ORER 1.5" HAT CHANNELAPPLIED TO CONCRETE PANEL; COLOR MIX TBD.32.3/4" IN SET PER ELEVATION33.STANDING SEAM ROOF OVER METAL DECK WITH STEEL CHANNEL GUTTER34.CONCRETE BASE PER STRUCTURAL, TYP.X28T.O. BEAM23'-1"282828282828283318183434343434343433995599TIGTIGTIGTIGTIGTIGTIGTIGTIGTIGTIGTIGTIGTIGTIG 01/22/20 - 9:20am2180307S-0.0.dwg2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB T A C O M A SEATTLE SPOKANE TRI-CITIES Nelco Architecture, Inc. Phone: Suite 1300 Seattle, WA 98101 (206) 408-8500 1200 Fifth Ave. WWW.NELSONWORLDWIDE.COM Proj. No:Reviewed By: SEAL: CITY STAMP: IRG CLR/LAH IRG GREENLINE BUILDING A WEYERHAEUSER WAYS S FEDERAL WAY, WA 98001 AHBL 2180307.20 CLIENT: PROJECT: 11111 SANTA MONICA BLVD. SUITE 800 LOS ANGELES, CA 90025 Date:No:Description: PERMIT SUBMITTAL 2/03/2019 01/22/20 - 9:20am2180307S-0.0.dwg2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB T A C O M A SEATTLE SPOKANE TRI-CITIES Nelco Architecture, Inc. Phone: Suite 1300 Seattle, WA 98101 (206) 408-8500 1200 Fifth Ave. WWW.NELSONWORLDWIDE.COM Proj. No:Reviewed By: SEAL: CITY STAMP: IRG CLR/LAH IRG GREENLINE BUILDING A WEYERHAEUSER WAYS S FEDERAL WAY, WA 98001 AHBL 2180307.20 CLIENT: PROJECT: 11111 SANTA MONICA BLVD. SUITE 800 LOS ANGELES, CA 90025 Date:No:Description: PERMIT SUBMITTAL 2/03/2019 11. STATEMENT OF SPECIAL INSPECTIONS IBC SI SO TITLE ü1705.2 ü STEEL CONSTRUCTION (SEE TABLES 15A, 15B, 15C, 15D, AND 15E) 1705.3 ü CONCRETE CONSTRUCTION (SEE TABLE 13) ü 1705.6 SOILS (SEE TABLE 12A) ü 1705.12.1 1705.13.1 STRUCTURAL STEEL - SEISMIC FORCE RESISTING SYSTEM 1705.12.2 STRUCTURAL WOOD - SEISMIC FORCE RESISTING SYSTEM 12A. REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS IBC TABLE 1705.6 SPECIAL INSPECTION OR TEST TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION 1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY N/R ü 2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL N/R ü 3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIAL N/R ü 4. VERIFY USE OF PROPER MATERIALS, DENSITIES, AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF COMPACTED FILL ü N/R 5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY N/R ü 15B. REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - CONSTRUCTION INSPECTION OF BOLTING SPECIAL INSPECTION OR TEST TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION REFERENCED STANDARD AISC 360 TABLE N5.6-1 1. PRIOR TO BOLTING, VERIFY AND INSPECT THE FOLLOWING:- A. MANUFACTURER'S CERTIFICATIONS FOR FASTENER MATERIALS ü N/R - B. FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS N/R ü - C. PROPER FASTENER SELECTED FOR JOINT DETAIL N/R ü AISC 360 A3.1 D. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL N/R ü - E. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITIONS AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS N/R ü - F. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED ü N/R - G. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS, AND OTHER FASTENER COMPONENTS N/R ü - AISC 360 TABLE N5.6-2 2. DURING BOLTING, VERIFY AND INSPECT THE FOLLOWING: A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED N/R ü - B. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING OPERATION N/R ü - C. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING N/R ü - AISC 360 TABLE N5.6-3 3. AFTER BOLTING, VERIFY AND INSPECT THE FOLLOWING: A. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS ü N/R - 15A. REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - CONSTRUCTION INSPECTION OF WELDING SPECIAL INSPECTION OR TEST TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION REFERENCED STANDARD AISC 360 TABLE N5.4-1 1. PRIOR TO WELDING, VERIFY AND INSPECT THE FOLLOWING: A. WELDING PROCEDURE SPECIFICATIONS (WPS)ü N/R - B. MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES ü N/R AISC 360 A3.5 C. MATERIAL IDENTIFICATION OF STRUCTURAL STEEL MEMBERS N/R ü AISC 360 A3.1 D. WELDER IDENTIFICATION SYSTEM N/R ü -- E. FIT-UP OF GROOVE WELDS, INCLUDING JOINT GEOMETRY N/R ü -- 1) JOINT PREPARATION 2) DIMENSIONS: ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL 3) CLEANLINESS: CONDITION OF STEEL SURFACES 4) TACKING: TACK WELD QUALITY AND LOCATION 5) BACKING TYPE AND FIT (IF APPLICABLE) F. CONFIGURATION AND FINISH OF ACCESS HOLES N/R ü -- G. FIT-UP OF FILLET WELDS N/R ü -- 1) DIMENSIONS: ALIGNMENT, GAPS AT ROOT 2) CLEANLINESS: CONDITION OF STEEL SURFACES 3) TACKING: TACK WELD QUALITY AND LOCATION H. CHECK WELDING EQUIPMENT N/R ü -- AISC 360 TABLE N5.4-2 2. DURING WELDING, VERIFY AND INSPECT THE FOLLOWING: A. USE OF QUALIFIED WELDERS N/R ü - B. CONTROL AND HANDLING OF WELDING CONSUMABLES N/R ü -1) PACKAGING 2) EXPOSURE CONTROL C. NO WELDING OVER CRACKED TACK WELDS N/R ü - D. ENVIRONMENTAL CONDITIONS N/R ü -1) WIND SPEED WITHIN LIMITS 2) PRECIPITATION AND TEMPERATURE E. WELDING PROCEDURE SPECIFICATIONS FOLLOWED N/R ü - 1) SETTINGS ON WELDING EQUIPMENT 2) TRAVEL SPEED 3) SELECTED WELDED MATERIALS 4) SHIELDING GAS TYPE AND FLOW RATE 5) PREHEAT APPLIED 6) INTERPASS TEMPERATURE MAINTAINED 7) PROPER POSITION F. WELDING TECHNIQUES N/R ü - 1) INTERPASS AND FINAL CLEANING 2) EACH PASS WITHIN PROFILE LIMITATIONS 3) EACH PASS MEETS QUALITY REQUIREMENTS AISC 360 TABLE N5.4-3 3. AFTER WELDING, VERIFY AND INSPECT THE FOLLOWING: A. WELDS CLEANED N/R ü - B. SIZE, LENGTH, AND LOCATION OF WELDS ü N/R - C. WELDS MEET VISUAL ACCEPTANCE CRITERIA ü N/R - 1) CRACK PROHIBITION 2) WELD TO BASE METAL FUSION 3) CRATER CROSS SECTION 4) WELD PROFILES 5) WELD SIZE 6) UNDERCUT 7) POROSITY D. ARC STRIKES ü N/R - E. k-AREA ü N/R - F. BACKING REMOVED AND WELD TABS REMOVED, IF REQUIRED ü N/R - G. REPAIR ACTIVITIES ü N/R - H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER ü N/R - SI =SPECIAL INSPECTION SO =STRUCTURAL OBSERVATION ü =ITEM IS REQUIRED N/R =ITEM IS NOT REQUIRED SPECIAL INSPECTIONS INDICATED ARE FOR STRUCTURAL ELEMENTS ONLY. SEE ARCH, MECH AND ELEC DRAWINGS FOR ADDITIONAL SPECIAL INSPECTIONS. 11.1 INSPECTION/TESTING REQUIREMENTS: SEE DRAWINGS, SPECIFICATIONS, AND IBC SECTIONS 110, AND CHAPTER 17. 11.2 INSPECTIONS BY THE BUILDING OFFICIAL (IBC SECTION 110): 11.2.1 FOOTING AND FOUNDATION INSPECTIONS SHALL BE MADE AFTER EXCAVATIONS ARE COMPLETE AND ANY REQUIRED REINFORCING IS IN PLACE. ANY REQUIRED FORMS SHALL BE IN PLACE PRIOR TO INSPECTION. 11.2.2 CONCRETE SLAB AND UNDER FLOOR INSPECTIONS SHALL BE MADE AFTER ALL IN SLAB OR UNDER FLOOR REINFORCING, CONDUIT, PIPING AND OTHER ANCILLARY EQUIPMENT ITEMS AND ACCESSORIES ARE IN PLACE BUT PRIOR TO CONCRETE PLACEMENT OR FLOOR SHEATHING INSTALLATION. 11.2.3 FRAMING INSPECTIONS SHALL BE MADE AFTER ALL SHEATHING, FRAMING, BLOCKING AND BRACING ARE COMPLETE AND ALL PIPES, DUCTS, ELECTRICAL, PLUMBING, ETC., ARE INSTALLED AND APPROVED PRIOR TO COVER. 11.2.4 IN ADDITION TO THE INSPECTIONS SPECIFIED ABOVE, THE BUILDING OFFICIAL IS AUTHORIZED TO MAKE OR REQUIRE OTHER INSPECTIONS OF ANY CONSTRUCTION WORK TO ASCERTAIN COMPLIANCE WITH THE PROVISIONS OF THE IBC OR OTHER LAWS ENFORCED BY THE BUILDING OFFICIAL. 11.3 STRUCTURAL TESTS AND SPECIAL INSPECTIONS (IBC CHAPTER 17): 11.3.1 SEE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 11.3.2 STRUCTURAL TESTS AND SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF CHAPTER 17 OF THE IBC AS WELL AS ANY ADDITIONAL REQUIREMENTS OF THE BUILDING OFFICIAL. OMISSION FROM THE LIST BELOW OF TESTING AND INSPECTION REQUIREMENTS SHALL NOT RELIEVE THE CONTRACTOR FROM PROVIDING TESTING AND INSPECTION REQUIRED BY THE SPECIFICATIONS, THE IBC AND THE BUILDING OFFICIAL. 11.3.3 TESTING AND SPECIAL INSPECTIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF CHAPTER 17 OF THE IBC FOR THE ITEMS LISTED IN THIS SECTION. 11.4 STRUCTURAL OBSERVATION 11.4.1 STRUCTURAL OBSERVATION SHALL BE PERFORMED DURING CONSTRUCTION IN A MANNER AS REQUIRED TO BECOME GENERALLY FAMILIAR WITH THE IN PLACE CONSTRUCTION. 11.4.2 STRUCTURAL OBSERVATION EXTENT SHALL BE AS INDICATED ABOVE. TIMING AND DURATION OF OBSERVATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR DURING CONSTRUCTION. 11.4.3 CONSTRUCTION OBSERVATION REPORTS AND FINDINGS SHALL NOT BE VIEWED AS A WARRANTY OR GUARANTEE BY THE STRUCTURAL ENGINEER. 11.5 SPECIAL INSPECTOR: SHALL BE CURRENTLY WABO CERTIFIED AND UNDER THE SUPERVISION OF A REGISTERED PROFESSIONAL ENGINEER. 11.5.1 THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. 11.5.2 THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, ENGINEER OF RECORD, ARCHITECT OF RECORD, AND OTHER DESIGNATED PERSONS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE GENERAL CONTRACTOR FOR CORRECTION, THEN, IF NOT IN CONFORMANCE, TO THE PROPER DESIGN AUTHORITY AND BUILDING OFFICIAL. 11.5.3 THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE IBC. THE REPORT SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. 15.1 STRUCTURAL STEEL CONSTRUCTION: SPECIAL INSPECTION AND NONDESTRUCTIVE TESTING OF STRUCTURAL STEEL ELEMENTS SHALL BE IN ACCORDANCE WITH THE QUALITY CONTROL AND QUALITY ASSURANCE REQUIREMENTS OF AISC 360, AS NOTED IN TABLES 15A, 15B, 15C, AND AWS D1.1, INCLUDING: 15.1.1 INSPECTION OF ERECTED STEEL SYSTEM. 15.1.2 REVIEW OF MATERIAL TEST REPORTS AND CERTIFICATIONS FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. 15.1.3 OBSERVATION OF WELDING OPERATIONS AND VISUAL INSPECTION OF IN-PROCESS AND COMPLETED WELDS SHALL BE AS FOLLOWS: A.VERIFY THAT WELD FILLER MATERIAL AND MANUFACTURER'S CERTIFICATE OF COMPLIANCE CONFORM TO AWS SPECIFICATION SPECIFIED. VERIFY WELDERS ARE CERTIFIED BY WABO, THAT PROPER ELECTRODES IN OVEN DRY CONDITIONS ARE USED, AND THAT PROPER METHODS AND PREPARATIONS ARE USED. B.PERIODIC SPECIAL INSPECTION OF WELDING SHALL BE PERFORMED FOR SINGLE PASS FILLET WELDS LESS THAN OR EQUAL TO 5/16" AND FLOOR AND DECK WELDS. C.CONTINUOUS SPECIAL INSPECTION OF WELDING SHALL BE PERFORMED ON COMPLETE AND PARTIAL PENETRATION GROOVE WELDS AND FILLET WELDS GREATER THAN 5/16". D.ALL WELDS SHALL BE CHECKED VISUALLY. E.ALL SHOP AND FIELD WELDING SHALL BE SUBJECT TO INSPECTION BY A WABO CERTIFIED WELDING INSPECTOR EMPLOYED BY THE OWNER. THE INSPECTOR SHALL UTILIZE RADIOGRAPHIC, ULTRASONIC, OR MAGNETIC PARTICLE TESTING AND ANY OTHER AID TO VISUAL INSPECTION THAT MAY BE DEEMED NECESSARY TO ASSURE THE ADEQUACY OF WELDING. THE OWNER SHALL CARRY OUT TESTING AND INTERPRETATION AT ANY STAGE AFTER WELDING. F.100% OF ALL COMPLETE PENETRATION WELDS SHALL BE CHECKED BY ULTRASONIC TESTING. G.ALL WELDS FOUND DEFECTIVE AND REPAIRED SHALL BE REINSPECTED BY THE SAME METHOD ORIGINALLY USED. THE COST OF REPAIR AND REINSPECTION SHALL BE BORNE BY THE CONTRACTOR. H.STANDARDS FOR ACCEPTANCE SHALL BE AS GIVEN IN AWS D1.1. 15.1.4 OBSERVATION OF BOLTING OPERATIONS. 15.1.5 CONTINUOUS SPECIAL INSPECTION SHALL BE PERFORMED FOR EACH JOINT OR MEMBER. PERIODIC SPECIAL INSPECTION SHALL BE PERFORMED ON ITEMS ON A RANDOM BASIS. PERIODIC SPECIAL INSPECTION NEED NOT DELAY FABRICATION OR ERECTION OPERATIONS. 15.1.7 OPEN-WEB STEEL JOISTS AND JOIST GIRDERS: SPECIAL INSPECTIONS OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS SHALL BE IN ACCORDANCE WITH TABLE 15E. 15.1.9 EPOXY ANCHORS: SPECIFIC REQUIREMENTS FOR INSPECTION OF ANCHORS INSTALLED IN HARDENED CONCRETE SHALL BE AS DESCRIBED IN THE RESEARCH REPORT ISSUED BY AN APPROVED SOURCE (ICC, IAPMO, ETC.). 15.1.10EXPANSION ANCHORS: SPECIFIC REQUIREMENTS FOR INSPECTION OF ANCHORS INSTALLED IN HARDENED CONCRETE SHALL BE AS DESCRIBED IN THE RESEARCH REPORT ISSUED BY AN APPROVED SOURCE (ICC, IAPMO, ETC.). 12.1 SPECIAL INSPECTIONS AND TESTS FOR EXISTING SITE SOIL CONDITIONS, FILL PLACEMENT, AND LOAD-BEARING REQUIREMENTS PER IBC 1705.6., AS NOTED IN TABLE 12A. 12.1.1 THE APPROVED GEOTECHNICAL REPORT AND THE CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN PROFESSIONALS SHALL BE USED TO DETERMINE COMPLIANCE. 12.2 SPECIAL INSPECTIONS AND TESTS FOR DEEP DRIVEN FOUNDATION ELEMENTS SHALL BE PERFORMED DURING INSTALLATION AND TESTING PER IBC 1705.7., AS NOTED IN TABLE 12B. 12.2.1 THE APPROVED GEOTECHNICAL REPORT AND CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN PROFESSIONALS SHALL BE USED TO DETERMINE COMPLIANCE. 16.1 REQUIRED VERIFICATION AND INSPECTION OF WOOD CONSTRUCTION: 16.1.1 SPECIAL INSPECTION OF THE FABRICATION PROCESS OF PREFABRICATED WOOD STRUCTURAL ELEMENTS AND ASSEMBLIES SHALL BE IN ACCORDANCE WITH IBC SECTION 1704.2.5. 16.2.1 SPECIAL INSPECTION OF SITE BUILT WOOD ASSEMBLIES SHALL BE AS FOLLOWS: A.HIGH-LOAD DIAPHRAGMS SHALL BE INSTALLED WITH SPECIAL INSPECTION AS INDICATED IN IBC SECTION 1704.2. THE SPECIAL INSPECTOR SHALL INSPECT THE WOOD STRUCTURAL PANEL SHEATHING TO ASCERTAIN WHETHER IT IS THE GRADE AND THICKNESS SHOWN ON THE CONSTRUCTION DOCUMENTS. THE SPECIAL INSPECTOR SHALL VERIFY THE NOMINAL SIZE OF FRAMING MEMBERS AT ADJOINING PANEL EDGES, NAIL OR STAPLE DIAMETER AND LENGTH, THE NUMBER OF FASTENER LINES, AND SPACING BETWEEN FASTENERS IS AS SHOWN ON THE CONSTRUCTION DOCUMENTS. 13. REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION IBC TABLE 1705.3 SPECIAL INSPECTION OR TEST TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION REFERENCED STANDARD IBC REFERENCE 1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT N/R ü ACI 318: CH. 20, 25.2, 25.3, 26.6.1-26.6.3 1908.4 2. REINFORCING BAR WELDING: A. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706 N/R ü AWS D1.4 ACI 318: 26.6.4 - B. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5 16"; AND N/R ü AWS D1.4 ACI 318: 26.6.4 - C. INSPECT ALL OTHER WELDS ü N/R AWS D1.4 ACI 318: 26.6.4 - 3. INSPECT ANCHORS CAST IN CONCRETE N/R ü ACI 318: 17.8.2 - 4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS: B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4A N/R ü ACI 318: 17.8.2 - 5. VERIFY USE OF REQUIRED DESIGN MIX N/R ü ACI 318: CH. 19, 26.4.3, 26.4.4 1904.1, 1904.2, 1908.2, 1908.3 6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE ü N/R ASTM C 172 ASTM C 31 ACI 318: 26.4, 26.12 1908.10 7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES ü N/R ACI 318: 26.5 1908.6, 1908.7, 1908.8 8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES N/R ü ACI 318: 26.5.3-26.5.5 1908.9 10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS N/R ü ACI 318: 26.8 - 12. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED N/R ü ACI 318: 26.11.1.2(b)- 13.1 CONCRETE: SPECIAL INSPECTION AND TESTING PER IBC TABLE 1705.3 AS NOTED IN TABLE 13, INCLUDING: 13.1.3 CONTINUOUS SPECIAL INSPECTION OF BOLTS INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT OF CONCRETE. (BRACED FRAME ANCHOR BOLTS) 13.1.5 SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION OF ANCHORS INSTALLED IN HARDENED CONCRETE SHALL BE AS DESCRIBED IN THE RESEARCH REPORT ISSUED BY AN APPROVED SOURCE (ICC, IAPMO, ETC.). 18.1 SPECIAL INSPECTIONS AND TESTING FOR SEISMIC RESISTANCE: 18.1.1 SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE PER IBC 1705.12 SHALL BE REQUIRED FOR SEISMIC FORCE-RESISTING SYSTEMS IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C, D, E OR F FOR THE FOLLOWING: A.SPECIAL INSPECTIONS OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE THE QUALITY ASSURANCE REQUIREMENTS OF AISC 341. B.PERIODIC SPECIAL INSPECTION OF NAILING, BOLTING, ANCHORING AND OTHER FASTENING OF WOOD COMPONENTS WITHIN THE SEISMIC FORCE RESISTING SYSTEM, INCLUDING WOOD WOOD DIAPHRAGMS AND TILT PANEL TO DIAPHRAGM CONNECTIONS. 15E. REQUIRED SPECIAL INSPECTIONS AND TESTS OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS IBC TABLE 1705.2.3 SPECIAL INSPECTION OR TEST TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION REFERENCED STANDARD 1. INSTALLATION OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS A. END CONNECTIONS - WELDING OR BOLTED N/R ü SJI SPECIFICATIONS B. BRIDGING - HORIZONTAL OR DIAGONAL N/R ü SJI SPECIFICATIONS N/R N/R N/R N/R N/R 01/22/20 - 9:20am2180307S-0.0.dwg2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB T A C O M A SEATTLE SPOKANE TRI-CITIES Nelco Architecture, Inc. Phone: Suite 1300 Seattle, WA 98101 (206) 408-8500 1200 Fifth Ave. WWW.NELSONWORLDWIDE.COM Proj. No:Reviewed By: SEAL: CITY STAMP: IRG CLR/LAH IRG GREENLINE BUILDING A WEYERHAEUSER WAYS S FEDERAL WAY, WA 98001 AHBL 2180307.20 CLIENT: PROJECT: 11111 SANTA MONICA BLVD. SUITE 800 LOS ANGELES, CA 90025 Date:No:Description: PERMIT SUBMITTAL 2/03/2019 AB ANCHOR BOLT ADDL ADDITIONAL ADJ ADJACENT AFF ABOVE FINISH FLOOR ARCH ARCHITECTURAL, ARCHITECT ASD ALLOWABLE STRESS DESIGN BLKG BLOCKING BM BEAM BNDY BOUNDARY BOT BOTTOM BRG BEARING BS BOTH SIDES BTWN BETWEEN BU BUILT UP CIP CAST IN PLACE CJ CONSTRUCTION/CONTROL JOINT CL CENTERLINE CLG CEILING CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONN CONNECT, CONNECTION CONT CONTINUOUS CSK COUNTERSINK CTR CENTER CVR COVER DIA DIAMETER ELEV ELEVATION EMB EMBEDMENT ENGR ENGINEER EQ EQUAL/EQUIVALENT EQUIV EQUIVALENT ES EACH SIDE EW EACH WAY (E), EX, EXIST EXISTING EXP EXPANSION EXT EXTERIOR FDN FOUNDATION FF FINISH FLOOR FFE FINISH FLOOR ELEVATION FOC FACE OF CONCRETE FOM FACE OF MASONRY FOS FACE OF STUD FS FAR SIDE FTG FOOTING GA GAGE GALV GALVANIZED GC GENERAL CONTRACTOR GL GLUE LAMINATED GLB GLUE LAMINATED BEAM GWB GYPSUM WALL BOARD HGR HANGER HSS HOLLOW STEEL SECTION HT HEIGHT I.F.INSIDE FACE INT INTERIOR JNT JOINT JST JOIST K, KIPS KIPS=1000 LBS L ANGLE LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LOC LOCATION MB MACHINE BOLT MECH MECHANICAL MFR MANUFACTURER MIW MALLEABLE IRON WASHER NS NEAR SIDE NTS NOT TO SCALE NWT NORMAL WEIGHT O/OVER OC ON CENTER O.F.OUTSIDE FACE OPP OPPOSITE HAND OSB ORIENTED STRAND BOARD PC PRE-CAST PDF POWER DRIVEN FASTENERS, PAF PAF POWER ACTUATED FASTENERS, PDF PERP PERPENDICULAR PL PLATE PLF POUNDS PER LINEAR FOOT PNL PANEL PE, PRE-ENGR PRE-ENGINEERED PROV PROVIDE PW PLYWOOD REF REFERENCE REINF REINFORCE, REINFORCEMENT REQ'D REQUIRED RF ROOF SCHED SCHEDULE SHTG SHEATHING SIM SIMILAR SIMP SIMPSON STRONG-TIE SOG SLAB ON GRADE SPCG SPACING SQ SQUARE STIFF STIFFENER SW SHEARWALL T&G TONGUE AND GROOVE THK THICK THRD THREADED T.O.TOP OF TOC TOP OF CONCRETE TOF TOP OF FOOTING TOPL TOP OF PLATE TOS TOP OF STEEL TOW TOP OF WALL TRANS, TRANSV TRANSVERSE TRTD TREATED TS TUBE STEEL (HSS) TYP TYPICAL UNO UNLESS NOTED OTHERWISE W/WITH W/O WITHOUT WF WIDE FLANGE WHS WELDED HEADED STUD WTS WELDED THREADED STUD WWF WELDED WIRE FABRIC KEY TO ABBREVIATIONS 1 2 NO EXCAVATION FOR PIPE OR DUCTS PARALLEL TO FTG BELOW THIS LINE STEP AS REQ'D PIPE PARALLEL TO WALL PIPE SLEEVEEXCAVATION 6"MIN6"MIN6"MINNO PIPE THRUWALL AT THISLOCATIONTYPICAL DETAIL OF PIPE AT CONCRETE FOOTING COMPACTED STRUCTURAL FILL OR LEAN CONCRETE AT G.C. OPTION 1 1/2" CLR MIN 180-DEGREE HOOK - LAP 48 x BAR DIA HORIZ REINF 48 x BAR DIA (15" MIN) TYP ALL CORNER BARS ACI MIN CLR+ 12 " MAXLAP 24 DIA W/ HORIZ REINF 2" MIN6" MAXTYPPLACE ALTER- NATING CORNER BARS AS SHOWN 48 x BAR DIA (15" MIN) TYP SPLICE UNO NOTES: 1. VERTICAL REINFORCEMENT SHOWN IS ADDITIONAL IF NORMAL REINFORCEMENT IS NOT IN PROPER LOCATION. 2. CORNER BARS ARE SAME SIZE AND SPACING AS HORIZONTAL REINFORCEMENT. 3.90-DEGREE HOOKS MAY BE SUBSTITUTED FOR CORNER BARS. SEE NOTE #5. 4. REINFORCEMENT AT ALL WALL CORNERS, ENDS, AND INTERSECTIONS SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH APPROPRIATE DETAIL SHOWN. 5.USE ACI MINIMUM 90-DEGREE HOOK FOR EMBEDMENT LESS THAN 48 x BAR DIAMETERS PAST FACE OF WALL. 6.WALL DETAILS SHOWN, FOOTING DETAILS SIMILAR. PLAN VIEW - TYPICAL REINFORCEMENT PLACING DETAIL EXTERIOR PAVING PER ARCH 1'-0"0'-8"0'-8" PER ARCH PER ARCH PERARCHSUB GRADE PREPARATION PER GEOTECH REPORT 1/8" TOOLED RADIUS STAIR DETAIL SHOWN - RAMP DETAIL SIMILAR #4 NOSING BAR #4 AT 12" O.C. EA WAY 112" CLR TYP11 2" CLR TYP 1'-0" 6 " M IN 3 " C LR TYPICAL CONCRETE STAIR CONSTRUCTION FORM AND GROUT VERT PANEL JOINT BELOW GRADE REINFORCING SAME SIZE AND SPACING AS LONGIT FOOTING REINF - LAP 2'-0" MIN W/ LONGITUDINAL FOOTING REINF FIRM UNDISTURBED SOIL MIN DIMENSION SAME AS FTG THICKNESS 1 2 TILT UP PANEL 2'-3" MAX4'-0" MIN TYPICAL LONG FTG REINF 3 4" MIN 2" MAX FOOTING THICKNESS PER PLAN AND DETAILS TYPICAL STEPPED FOOTING AT TILT-UP WALLS TYPICAL CONTROL JOINT TYPICAL CONSTRUCTION JOINT 18" SAWCUT x 1/5 SLAB THICKNESS - 1 14" MIN - SAWCUT MUST BE MADE WITHIN 4 TO 12 HOURS AFTER CONCRETE HARDENS - BLADES SHALL NOT BE BLUNT AS TO CAUSE CHIPPING OF CONC - PROVIDE JOINT SEALANT PER SPECIFICATIONS - INSTALL PER MFR RECOMMENDATIONS AT AREAS W/ REINF STOP REINF AT SLAB JOINT TOOLED JOINT R=18 " MIN 7 8" DIA x 14" AT 12" OC DOWEL BASKETS OR PNA SQUARE DOWEL BASKET SYSTEM; TYPICAL AT CONTROL JOINTS 7 8" DIA x 1'-2" GREASED SMOOTH DOWEL AT 12" O.C. AT CL SLAB OR DIAMOND PL 3 8" x 4.5" AT 22" OC SECTION NTS 2 SECTION NTS 3 SECTION NTS 1 SECTION NTS 5 SECTION NTS 4 TYP AREAS OF SLAB ARE UNREINFORCED. SEE PLAN FOR AREAS W/ REINFORCEMENT 01/22/20 - 9:20am2180307S-0.0.dwg2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB T A C O M A SEATTLE SPOKANE TRI-CITIES Nelco Architecture, Inc. Phone: Suite 1300 Seattle, WA 98101 (206) 408-8500 1200 Fifth Ave. WWW.NELSONWORLDWIDE.COM Proj. No:Reviewed By: SEAL: CITY STAMP: IRG CLR/LAH IRG GREENLINE BUILDING A WEYERHAEUSER WAYS S FEDERAL WAY, WA 98001 AHBL 2180307.20 CLIENT: PROJECT: 11111 SANTA MONICA BLVD. SUITE 800 LOS ANGELES, CA 90025 Date:No:Description: PERMIT SUBMITTAL 2/03/2019