Loading...
20-101386-Civil Details-04-09-2020-V1NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\construction plans\\DT-01.dwg3/19/2020 9:02 AMPlotted:File:Plotted By: Jeff HiivaEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!DETAILS AND NOTESWASHINGTONCITY OF FEDERAL WAY1886-001-016 DT-01 LGB JJH 03/23/2020 ΧΣ,/0 12 33 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H \A1;PER PLAN 5'-6" MIN. \A1;1/2" \A1;9"\A1;6"\A1;9" MIN. \A1;1" MIN.\A1;4" MIN.. 4"MIN. (TYP.) 6" MIN. AT DRIVEWAYS 1/2" MAX. AT BLDG. DOORS. NOTE: CONC. SURFACING FINISH AND/OR PATTERN PER LANDSCAPE PLANS NOT TO SCALE Β∆Λ∆ΜΣ ΒΝΜΒΘ∆Σ∆ ΡΗΧ∆ς≅Κϑ ςΗΣΓ ΗΜΣ∆ΦΘ≅Κ ΒΤΘΑ \A1;18' PARKING STALL \A1;26' DRIVE AISLE \A1;18' PARKING STALL SCALE: 1"=5' Ο≅ΘϑΗΜΦ % ΧΘΗΥ∆ ≅ΗΡΚ∆ Ρ∆ΒΣΗΝΜ 2%VARIES 2% 03/20/2020 NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\construction plans\\DT-02.dwg3/19/2020 9:03 AMPlotted:File:Plotted By: Jeff HiivaEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!DETAILS AND NOTESWASHINGTONCITY OF FEDERAL WAY1886-001-016 DT-02 LGB JJH 03/23/2020 ΧΣ,/1 13 33 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H ΣΞΟΗΒ≅Κ 7−4&ω07& Ο≅ΘϑΗΜΦ SCALE: 1"=20' \A1;26' DRIVE AISLE \A1;18' \A1;8.5'\A1;18' \A1;8.5' 03/20/2020 NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\construction plans\\DT-03.dwg3/20/2020 8:44 AMPlotted:File:Plotted By: Jeff HiivaEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!DETAILS AND NOTESWASHINGTONCITY OF FEDERAL WAY1886-001-016 DT-03 LGB JJH 03/23/2020 ΧΣ,/2 14 33 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H SEE DETAIL BELOW EVENLY SPACED (4) PLACES HOOK CLAMPS SEE NOTE 1) (24 BARS EVENLY SPACED, TO UPPER & LOWER BANDS LONG SMOOTH BARS WELDED 3/4" THICK x 4" WIDE, OVERFLOW FORMED TO FIT IN GROOVE 3/4" THICK x 4" WIDE LOWER ALUMINUM BAND OF C.B. RISER NOTES: 1. FOR DIFFERENT DIAM. C.B.'S STEPS PER UPPER ALUMINUM BAND 3/4" x 4" WIDE 1.25'STDRD DWG 3-05 ELEV.=PER PLAN 18" BARS EQUALLY 3/4"%%C SMOOTH SPACED (4"O.C. MAX.)15%%DSEE NOTE 1(TYP.)Χ∆ΑΘΗΡ Β≅Φ∆ Χ∆Σ≅ΗΚ NOT TO SCALE ELEVATION PER PLAN 2. METAL PARTS: ALUMINUM. BARS AROUND LOWER ALUMINUM AND 7" O.C. MAX. SPACING OF ADJUST DIMENSIONS TO MAINTAIN 2.0' BAND. PROVIDE MAINT. ACCESS BY WELDING (4) CROSS BARS TO (4) VERTICAL BARS AS SHOWN. HINGE UPPER ENDS W/ FLANGES/ BOLTS & PROVIDE LOCKING MECHANISM (W/PADLOCK) ON LOWER END. LOCATE LADDER STEPS DIRECTLY BELOW. DEBRIS CAGE FLUSH OR CONTRACTOR TO INSTALL BELOW CONCRETE LIP ΟΚ≅Μ ΥΗ∆ς AND BELOW FINISH GRADE NOTE: CLEANOUT MUST BE DETECTABLE BOTH ABOVE 6"%%c S.D. TO SURFACE LENGTH AS REQUIRED 6"%%c 45%%d ELBOW END PLUG 6"%%c 45%%d WYE 6"%%c S.D. LENGTH AS REQ'D. 5!⋅ ∋Ρ−Χ−( ΒΚ∆≅ΜΝΤΣ NOT TO SCALE FLUSH WITH GRADE 6"%%c CAP EXISTING OR PROPOSED GRADE 6"%%c S.D. VERIFY SLOPE WITH PLANS AND INVERTS ΡΒ≅Κ∆9 0!<0/& ∋ΣΞΟ∆ !Φ! ΡΣΘ∆∆Σ(\A1;8'\A1;33'\A1;5.5' EXISTING ASPHALT ROADWAY VARIES ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ Ρ∆ΒΣΗΝΜ ∆,∆ ΡΣ≅ΜΧ≅ΘΧ,ΧΤΣΞ ≅ΒΟ , ≅ΤΣΝΛΝΑΚΗ∆ ΧΘΗΥ∆ς≅ΞΡ ≅ΜΧ Ο≅ΘϑΗΜΦ ≅Θ∆≅Ρ Γ∆≅ΥΞ,ΧΤΣΞ ≅ΒΟ , ≅Θ∆≅Ρ ΡΤΑΙ∆ΒΣ ΣΝ ΣΘΤΒϑ ΣΘ≅ΕΕΗΒ ΟΒΒ Ο≅Υ∆Λ∆ΜΣ , ≅Θ∆≅Ρ ΡΤΑΙ∆ΒΣ ΣΝ Γ∆≅ΥΞ ΣΘΤΒϑ ΣΘ≅ΕΕΗΒ 2 INCHES OF HOT MIX ASPHALT, CLASS 1/2 INCH, PG 58-22. 4 INCHES OF CRUSHED SURFACING BASE COURSE. 3 INCHES OF HOT MIX ASPHALT, CLASS 1/ 2 INCH, PG 58-22. 6 INCHES OF CRUSHED SURFACING BASE COURSE. 6 INCHES OF CRUSHED SURFACING BASE COURSE 6 INCHES OF PCC PAVEMENT (28-DAY COMPRESSIVE STRENGTH OF 6,000 POUND PER SQUARE INCH [PSI] AND A MODULUS OF RUPTURE OF 600 PSI) 6" OF SUBBASE CONSISTING OF SELECT GRANULAR FILL TO PROVIDE UNIFORM GRADING AND PAVEMENT SUPPORT, TO MAINTAIN DRAINAGE, AND TO PROVIDE SEPARATION FROM FINE-GRAINED SUBGRADE SOIL. NATIVE SUBGRADE OR STRUCTURAL FILL PREPARED IN ACCORDANCE WITH THE "SITE DEVELOPMENT AND EARTHWORK" SECTION. 6" OF SUBBASE CONSISTING OF SELECT GRANULAR FILL TO PROVIDE UNIFORM GRADING AND PAVEMENT SUPPORT, TO MAINTAIN DRAINAGE, AND TO PROVIDE SEPARATION FROM FINE-GRAINED SUBGRADE SOIL. NATIVE SUBGRADE OR STRUCTURAL FILL PREPARED IN ACCORDANCE WITH THE "SITE DEVELOPMENT AND EARTHWORK" SECTION. NATIVE SUBGRADE OR STRUCTURAL FILL PREPARED IN ACCORDANCE WITH THE "SITE DEVELOPMENT AND EARTHWORK" SECTION. NOT TO SCALE Γ∆≅ΥΞ ΧΤΣΞ ΟΝΘΣΚ≅ΜΧ Β∆Λ∆ΜΣ ΒΝΜΒΘ∆Σ∆ Ο≅Υ∆Λ∆ΜΣ Ρ∆ΒΣΗΝΜ {NOTE: }PROVIDE 3/4" DIAMETER SMOOTH DOWELS AT ALL CONSTRUCTION JOINTS AT 12" O.C. EXTENDING 60' FROM FACE OF BUILDING. \A1;PER PLAN (10' TYP) 2% {NOTES: }1.CEMENT CONCRETE SHALL BE CLASS 4,000 PSI. 2.COMPACTION FOR CONCRETE WALKS TO BE 95% MAXIMUM DENSITY. 3.EXPANSION JOINTS CONSISTING OF 3/8" BY 6" PREMOLDED JOINT MATERIAL SHALL BE PLACED AT 15 FOOT INTERVALS, OR AS DIRECTED BY THE ARCHITECTURAL PLANS. {1/4" EDGE GROOVE SHALL BE PROVIDED AT JOINT EDGES. 4.SEE ARCHITECTURAL PLANS FOR JOINT PATTERNS.} NOT TO SCALE Γ∆≅ΥΞ ΧΤΣΞ Β∆Λ∆ΜΣ ΒΝΜΒΘ∆Σ∆ ΗΜ Ο≅Υ∆Λ∆ΜΣ ≅Θ∆≅ 2% 03/20/2020 Ε,Ε NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\construction plans\\DT-04.dwg3/20/2020 7:52 AMPlotted:File:Plotted By: Greg FedoreEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!DETAILS AND NOTESWASHINGTONCITY OF FEDERAL WAY1886-001-016 DT-04 LGB JJH 03/23/2020 ΧΣ,/3 15 33 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H 2%2% SCALE: 1"=5' ΧΘΗΥ∆ς≅Ξ ≅ΒΒ∆ΡΡ Ρ∆ΒΣΗΝΜ Ε,Ε \A1;15'\A1;15' CURB RAMP DETAIL SCALE: 1"=5' CURB RAMP #8 SPOT ELEVATION CHART POINT ELEVATION A 400.80 (@ FL) B 400.77 (@ FL) C 401.10 D 401.07 A µ CURB RAMP #9 SPOT ELEVATION CHART POINT ELEVATION A 403.04 (@ FL) B 403.05 (@ FL) C 403.49 D 403.50 \A1;5'\A1;6'\A1;5'\A1;6'B C D A B C D 5% 5% 0.2%7.5%7.5%0.2% 0.6% 0.6% 03/20/2020