Loading...
21-101105 Permit FinalCity of Federal Way Community Development Dept 33325 8th Ave S Fedeial Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name:. STAAB Project Address: 27723 21ST PL S Building - Single Family Permit #:21-101105-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 757562 0210 Project Description: BLUEBEAM - Structural repair of existing building after vehicle impacted garage. Repair materials include wall and roof framing, interior finishes, siding, and roofing. Owner Applicant Contractor Lender BARBARA A STAAB TRENT TINNEYWJE AMERICAN TECHNOLOGIES INC INSURANCE CLAIM 27723 21ST PL S 960 S HARNEY ST 835 S 192ND ST FEDERAL WAY WA 98003-6953 SEATTLE WA 98108 SEATAC WA 98148 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Plumbing to be Included? ........................................ No Total Valuation: 50,000.00 Is this an Online or O.T.C. application? .................. No No Fixtures Associated With This Permit !I PERMIT EXPIRES Sunday, 3 October, 2021 Permit Issued on Tuesday, April 6, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of FILM ton e City of Federal Way, 9 Owner or agent: Date: CITY OF Federal Way THIS CARD ISTO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101105 00 Address: 27723 21ST PL S Project: CHARLES V STAAB FEDERAL WAY WA 98003-6953 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE, THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Footings/Setback (4110) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install floo, ing By Date By Date By Date Shear Walls (4245) El Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install rooting Approved By Date By Date By Date Prior to scheduling a Framing inspection; ❑ Framing (4120) ❑ Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard Land Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date By Date ❑ Gypsum Wallboard Nailing (4130) ❑ Final - Building (4050) Approved to install mud &tape � AplApproved By Date By LDate ❑ Rough Electrical El Final Electrical Right of Way Approved Appl oved Approved By.,, Date By Date By Date