21-101105 Permit FinalCity of Federal Way
Community Development Dept
33325 8th Ave S
Fedeial Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name:. STAAB
Project Address: 27723 21ST PL S
Building - Single Family
Permit #:21-101105-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 757562 0210
Project Description: BLUEBEAM - Structural repair of existing building after vehicle impacted garage. Repair
materials include wall and roof framing, interior finishes, siding, and roofing.
Owner
Applicant
Contractor
Lender
BARBARA A STAAB
TRENT TINNEYWJE
AMERICAN TECHNOLOGIES INC
INSURANCE CLAIM
27723 21ST PL S
960 S HARNEY ST
835 S 192ND ST
FEDERAL WAY WA 98003-6953
SEATTLE WA 98108
SEATAC WA 98148
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No
Plumbing to be Included? ........................................ No
Total Valuation: 50,000.00
Is this an Online or O.T.C. application? .................. No
No Fixtures Associated With This Permit !I
PERMIT EXPIRES Sunday, 3 October, 2021
Permit Issued on Tuesday, April 6, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
FILM
ton e City of Federal Way,
9
Owner or agent: Date:
CITY OF
Federal Way
THIS CARD ISTO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 101105 00 Address: 27723 21ST PL S
Project: CHARLES V STAAB FEDERAL WAY WA 98003-6953
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE, THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ Footings/Setback (4110) ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105)
Approved to place concrete Approved to sheath floor Approved to install floo, ing
By Date By Date By Date
Shear Walls (4245) El Roof Sheathing (4220) Fire/Draft Stops (4095)
Approved to install siding Approved to install rooting Approved
By Date By Date By Date
Prior to scheduling a Framing inspection;
❑ Framing (4120) ❑ Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard
Land Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4 By Date By Date
❑ Gypsum Wallboard Nailing (4130) ❑ Final - Building (4050)
Approved to install mud &tape � AplApproved
By Date By LDate
❑ Rough Electrical El Final Electrical Right of Way
Approved Appl oved Approved
By.,, Date By Date By Date