20-103440drniF 1{ qy'Electrical
v3nprncn+ fkFx.,Irr,YCs Permit #:20-103440 00 -EL
, Wq 9800,L=2
Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: WREN
Project Address: 32063 41ST PL SW
Parcel N
Project Description: ELECTRICAL WORK FOR GAS FURNACE AND AC REPLACEME Tumber: 873196 0570
Owner Applicant
MICHAEL WREN RACHAEL AILSHiI PACIFIC HEATING & Contactor
32063 41ST PL SW COOLING PACIFIC AIR SYSTEMS (ELECTRICAL
FEDERAL WAY WA 8607 DCOOLIN ST SW 02)
98023-2403 LAKEWOOD WA 98499 PACIFAS853LB (6/2/21)
12811 PACIFIC HWY S
LAKEWOOD WA 98023
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical 1= i x I I I t -e s
Circuits - Residential 1 Thermostat
PERMIT EXPIRES Saturday, 4 September, 2021
Permit Issued on Friday, September 4, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent:
--ONUNE- Date:
CITY OF As�
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 103440 00 Address: 32063 41ST PL SW
Project: PATRICIA M WREN FEDERAL WAY WA 98023-2403
Scheduled inspections may be failed if this card is not on-site. DO NOT L SE'riliti C,-1ItD Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved- Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 LIFER Ground (4295) 7TJ Ditch cover (4030) ❑ Slab/Concrete Floor (4255)
Approved
[By Date
❑ Pool Bonding (4195)
Approved
By Date
❑ Feeders/Sub-panels (4045)
Approved
BY Date
El Final - Electrical (4055)
Approved
�'C a
BY Date
Rough Electrical Final Electrical Right of Way
Approved g
Approved Approved
By Date By Date IBY Date
Approved
BY
Date
EJTemporary
Power (4275)
Approved
By
Date
❑
Rough Electrical (4225)
Approved
By
Date
Rough Electrical Final Electrical Right of Way
Approved g
Approved Approved
By Date By Date IBY Date
Approved to place concrete
BY
Date
❑
Service (4235)
Approved
BY
Date
El
Ceiling Cover (4020)
Approved
BY
Date
Rough Electrical Final Electrical Right of Way
Approved g
Approved Approved
By Date By Date IBY Date