20-103303City of Federal Way
Applicant
Community Development Dept.
RUBY V TEMPLEMAN
S8th Ave S
FILI
Federalal Way, WA 98003
402 E MAIN ST SUITE 130
Ph: (253) 835-2607 Fax: (253) 835-2609
FEDERAL WAY, WA 98023
Project Name: TEMPLEMAN
Project Address: 31824 32ND PL SW
Mechanical
Permit #:20 -103303 -00 -ME
Inspection Request Line: (253) 835-3050
Project Description: GAS FURNACE, HEAT PUMP, DUCTWORK INSTALLATION
Parcel Number: 698000 0620
Owner
Applicant
Contractor
RUBY V TEMPLEMAN
BRIAN GRIFFISGRIFFIS HEATING INC
GRIFFIS HEATING INC (GENERAL)
31824 32ND PL SW #62D
402 E MAIN ST SUITE 130
GRIFFH]088DZ (1/5/21)
FEDERAL WAY, WA 98023
AUBURN WA 98002
402 E MAIN ST SUITE 130
AUBURN WA 98002
Additional Permit Information
Mechanical Work Valualion?................................. 10394.00 is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Compressors / Heat Pumps 1 Ducting
I Furnaces
PERMIT EXPIRES Monday, 22 February, 2021
Permit Issued on Wednesday, August 26, 2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ONOL I OI A Date:
As�
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 103303 00 Address: 31824 32ND PL SW Unit 62
Project: RUBY V TEMPLEMAN FEDERAL WAY WA 98023-2233
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE TEAS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test � e -C A gy p" Aa Approved
By Date By Date By Date 7
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date