Commercial Plan Review Letter 3COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor Eric LaBrie March 18, 2022 ESM Consulting Engineers LLC 33400 8th Avenue South, Suite 205 Federal Way, WA 98003 eric.labrie@esmcivil.com Re: Permit #20-101386-CO; COMMENT LETTER #3 Woodbridge Building “A,” 3120 South 344th Street, Federal Way Dear Eric LaBrie: City staff has conducted a review of the above-mentioned building permit application for Woodbridge Building “A.” A review of the resubmitted materials indicates the following issues that must be addressed before building permit approval. Please direct questions regarding any of the technical comments to the appropriate staff representative. COMMUNITY DEVELOPMENT – PLANNING DIVISION Stacey Welsh, 253-835-2634, stacey.welsh@cityoffederalway.com 1. Conditions of Approval – Please review the enclosed Conditions Compliance spreadsheet. PUBLIC WORKS – DEVELOPMENT SERVICES DIVISION Leonard Spadoni, 253-835-2732, leonard.spadoni@cityoffederalway.com 2. Conditions of Approval – Please address the comments in the enclosed Conditions Compliance spreadsheet. 3. Stationing must be tied to an existing monument. Clearly identify, both on the street improvement plans and on the horizontal control plans, which monument was used for stationing. PUBLIC WORKS – TRAFFIC DIVISION Sarady Long, 253-835-2743, sarady.long@cityoffederalway.com 4. Conditions of Approval – Please address the comments in the enclosed Conditions Compliance spreadsheet. CLOSING The purpose of this plan review is to verify code compliance, to the extent possible and reasonable, given the information provided on the plans and the City’s plan review resources and capabilities. In no way does any Eric LaBrie Page 2 of 2 March 18, 2022 20-101386-00-CO Doc. ID 82150 City approval constitute a guarantee of code compliance; authorize any work in violation of any applicable codes; or relieve the owner of responsibility for complying with pertinent codes and ordinances. Revised or resubmitted plans shall be provided in the same format and size as the originally submitted plans. Revised/resubmitted drawings shall indicate, by means of clouding or written response, what changes have been made from the original drawings. Plans for all involved departments will be forwarded from the Community Development Department to all review staff. Please use this link https://www.cityoffederalway.com/node/4588 to request a link to upload your resubmittal documents. If you have questions about this process, please contact the permit center at 253-835-2607, or by email at ElectronicSubmittal@cityoffederalway.com. Please note, the application fee collected at initial submittal of the permit application covers the initial review and one resubmittal only. The City will be charging applicants for any additional staff time necessary to complete each review following the first resubmittal. Further corrections may be necessary as a result of submitting additional information. If you have any questions, please call me at 253-835-2634, or stacey.welsh@cityoffederalway.com. Sincerely, Stacey Welsh, AICP Principal Planner enc: March 18, 2022, Conditions Compliance Spreadsheet June 10, 2021, ESA Memo Resubmittal Information Form c: Greg Kirk, Plans Examiner Leonard Spadoni, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer Dana Ostenson, dostenson@industrialrealtygroup.com John Everett, john.everett@esmcivil.com