Loading...
20-101669City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 99003 FILF!, Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: LAKOTA SEWAGE TREATMENT PLANT Project Address: 3203 SW DASH POINT RD Project Description: Replacement of an automatic transfer switch Electrical Permit #:20-101669-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 122103 9105 Owner Applicant Contractor LAKEHAVEN UTILITY DISTRICT KARRIE STEWARTSOURCE ELECTRIC SOURCE ELECTRIC LLC PO BOX 4249 LLC SOURCE*876QD (2/3/20) FEDERAL WAY WA 98063 7045 BANNER RD SW 7045 BANNER RD SE PORT ORCHARD WA 98367 PORT ORCHARD WA 98367 Additional Permit Information Is this an Online or O.T.C. application? ................ Yes Electrical Fixtures Add'1 New Feeder(s) 401-600 ; 1 PERMIT EXPIRES Friday, 23 April, 2021 Permit Issued on Thursday, April 23, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 4k THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 101669 00 Address: 3203 SW DASH POINT RD Project: LAKEHAVEN UTILITY DISTRICT FEDERAL WAY WA 98023-2340 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. M UFER Ground (4295) Ditch cover (4030) Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) 0 Rough Electrical (4225) ❑, Ceiling Cover (4020) Approved Approved Approved By Date . c/ . By Date By Date ❑ Final - Electrical (4055) Approved By Date ❑ Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date