Loading...
21-104372City of Federal Way Applicant Community Development Dept. TERRENCE MCGOVERN 33325 8th Ave S FILE Federal Way, WA 98003 4601 S 134TH PL Ph: (253) 835-2607 Fax: (253) 835-2609 FEDERAL WAY WA Project Name: MCGOVERN Project Address: 32607 39TH PL SW Project Description: Replace gas furnace and install 2 -ton a/c Mechanical Permit #:21 -104372 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 873195 0030 Owner Applicant Contractor TERRENCE MCGOVERN JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 32607 39TH PL SW 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9 (12/29/21) 98023-2648 4601 S 134TH PL TUKWILA WA 98168 Mechanical Work Valuation? Air Conditioners - Stand Alon( Additional Permit Information 8497 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures 1 Furnaces 1 PERMIT EXPIRES Monday, 18 April, 2022 Permit Issued on Wednesday, October 20, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WaORILINP nd the CiFederal Way. Owner or agent:Date- Fl m m ) ate THIS CARD IS TO REMAIN ON-SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUC TS: (253) 835-3050 PERMIT #: 21 104372 00 Address: 32607 39TH PL SW Project: TERRENCE E MCGOVERN FEDERAL WAY WA 98023-2648 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) F11 Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test By Date 00�1 Approved By/X0 Date / '^ By Date Right of Way Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date