Loading...
20-104388City of Federal Way Applicant Community Development Dept. MARK CLIREHUGH 33325 8th Ave S FILE Federal Way, WA 98003 4426221ST PL NE 4426 Ph: (253) 835-2607 Fax: (253) 835-2609 FEDERAL WAY WA 98023 Project Name: CLIREHUGH Project Address: 31817 48TH CIR SW Project Description: Install 3 ton AC unit to existing furnace at a home Mechanical Permit #:20 -104388 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 661320 0340 Owner Applicant Contractor MARK CLIREHUGH PAUL JOSEPHPerfect Climate Inc. PERFECT CLIMATE INC (GENERAL) 31817 48TH CIR SW UNIT 01-A 4426221ST PL NE 4426 PERFECI022D5 (3/12/22) FEDERAL WAY WA 98023 REDMOND WA 98053 4426 221ST PL NE V REDMOND WA 98053 ■ F, Additional Per of on Mechanical Work Valuation? .................................. 5600.00 Is this an Online or O.T.C. application?.................. Yes r 1mv. hanieal Fixtures t - Air Conditioners - Stand Alont 1 PERMIT EXPIRES Sunday, 9 Ma -y4 2021 Permit Issued on Tuesday, November 101,-2b20 I hereby certifyd he Z?- information is correct and that thezclnstruction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. T. , Owrlgr ent:0,or NNW Cate: r CITU OF Federal Way 10 K9 UV to 61 Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 20 104388 00 JUDI'Tii C CLIREHUGH Address: 31817 48TH CIR SW Unit 01-A FEDERAL WAY WA 98023 Scheduled inspections may be failed ifthis card is not on-site. DO NOT LOS E'I'llIS CAM). Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165) Q Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date ❑ Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date