20-104516Plumbing
City of Federal Way r Permit #:20-104516-00-PL
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003 FILSEE Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MAINA/FLITCH
Project Address: 2501 SW 323RD ST Parcel Number: 873180 1060
Project Description: ncludes all new quarter turn angle stops and stainless steel braided supply lines for all fixtures.
A new water shutoff will be installed on the main water line as well as water heater. A new
Pressure Reducing Valve will be installed on the main water line. Replace water lines with Pex
Plumbin Fix4urt)
Bathtubs 2 Dishwashers V� 1 Laundry Washe�ts 1
Lavatories 3 Showers 2 Sinks 4
Water Heaters I
ERMIT FIRES Sunday, 16
PC r it st red Tuesday, Noy her 020
I hereby certify that the above information is correct and that the struction on the above described property
and the cce ncy a use will be in accordance with the laws, rules and regulations of the State of
Washin ton and theCit of Federal Way.
Owner or agen Date:
Owner
Applicant
Contractor
EUNICE MA INA
RICH HARTHARTS SERVICES
HARTS SERVICES
2501 SW 323RD ST
2522 N PROCTOR ST SUITE 331
HARTSS*824P4 (10/24/22)
FEDERAL WAY WA 98023
TACOMA WA 98406
9523 19TH AVE E
TACOMA WA 98445
Plumbin Fix4urt)
Bathtubs 2 Dishwashers V� 1 Laundry Washe�ts 1
Lavatories 3 Showers 2 Sinks 4
Water Heaters I
ERMIT FIRES Sunday, 16
PC r it st red Tuesday, Noy her 020
I hereby certify that the above information is correct and that the struction on the above described property
and the cce ncy a use will be in accordance with the laws, rules and regulations of the State of
Washin ton and theCit of Federal Way.
Owner or agen Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQ UE TS: (2 53) 835-3050
PERMIT #: 20 104516 00 Address: 2501 SW 323RD ST
Project: KEVIN FLITCH FEDERAL WAY WA 98023-2520
Scheduled inspections maybe failed if this card is not on-site. DO NOT LOSL•: 'I'll IS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) E❑ Final - Plumbing (4075)
Approved to cover Approved i Approved
By '1-'I- - n'�' y
B Date I3� � Date B Date
❑ Rough Electrical Final Electrical ❑ Right of Way
Approved Approved Approved
By Date rBy Date. B) Date