Loading...
20-105033City y Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: YOUNG Project Address: 33120 10TH PL SW Project Description: GAS FURNACE REPLACEMENT Owner WILLIAM & SHIRLEY YOUNG 33120 10TH PL S FEDERAL WAY WA 98023-5216 Applicant RACHAEL AILSHIEPACIFIC HEATING & COOLING 8607 DURANGO ST SW LAKEWOOD WA 98499 Mechanical Permit #:20 -105033 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 926495 0650 Contractor PACIFIC AIR SYSTEMS (GENERAL) PACIFAS093KA (9!8/21) 12811 PACIFIC HWY SW LAKEWOOD WA 98499 Additional Permit Informatiq� Mechanical Work Valuation? .................................. R070 I. sltlilte yr (: F.C. altplicatiUlt'?........ .......... 1'cs Meeh 1 xtures 4� d Furnaces i r PER ht7tNIRES Tt�esda , 22 J , 2021 Perp it Is. uec! alt Th u rsday, e m ) r 24, 2020 I hereby certify that the ab formation is correct and that ell on the above described property and the ❑cc nc he a will be in acWrdance with the laws, rules and regulations of the State of hi n h Federal Way. Owner or agen ❑ate: z < _14%, CITY OF Federal Way THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 20 105033 00 Address: 33120 10TH PL SW Project: WILLIAM & SHIRLEY YOUNG FEDERAL WAY WA 98023-5216 Scheduled inspections may be failed if this card is not on-site. 1)0 NOT LOSE Tlll_S CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if You are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) El Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approv d By Date By Date lid �- Date