Loading...
20-104573City of Federal way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: LEMASTER Project Address: 33730 29TH CT SW Electrical Permit #:20 -104573 -00 -EL IFLE Inspection Request Line: (253) 835-3050 Parcel Number: 255700 0430 Project Description: Electrical connection for gas to gas furnace change out and run electrical for 2 1/2 -ton a/c Owner Applicant Contractor DAMON LEMASTER JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 33730 29TH CT SW 4601 S 134TH PL (ELECTRICAL) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA962DU (3/31/22) 98023-7718 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 2 Thermostat PERMIT EXPIRES Friday, 19 November, 2021 Permit Issued on Thursday, November 19, 2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W hi g on a the C' of Federal Way. COwner or agent: Date: THIS CARD IS TO REMAIN ON-SITE CITY OF Construction inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3450 PERMIT #: 20 104573 00 Address: 33730 29TH CT SW Project: DARLENE R LEMASTER FEDERAL WAY WA 98023-7718 Scheduled inspections maybe failed if this card is not on-site. DO NO"I' LOSE THIS C=ARD. Inspections are listed as close to seyuetntial order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work: must not be covered until it is approved. Check with your inspector it you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of [itis card. ❑ UFER Ground (4295) Ditch cover (4030)s❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) Approved By Date ❑ Feeders/Sub-panels (404.5) Approved r� By Date' ❑ Final - Electrical (4055) Approved liv1AL Date ❑ Temporary Power (4275) Q Approved By Date By ❑ Rough Electrical (4225) Approved ��}} By Date By Service (4235) Approved Date Ceiling Cover (4020) Approved Date ❑ Rough Electrical E] Final Electrical ❑ Right of Way Approved �T Approved Approved By Date biv__ Date By Date