Project Name: WILDWOOD ELEMENTARY
Project Address: 2405 S 300TH ST
Building - Commercial
Permit #: 09 -103003 -00 -CO
_'M Inspection Request Line: (253) 835-3050
Parcel Number: 042104 9167
Project Description: REP - Mechanically attach 1/2" thicj wood fiber board over existing roof. Install 3 -ply hot
asphalt roof system and associated flashing.
Owner`
Applicant
Contractor
Lender
FEDERAL WAY PUBLIC
PACIFIC SHEET METAL &
PACIFIC SHEET METAL &
SCHOOLS
ROOFING
ROOFING
31405 18TH AVE S
111 S SPOKANE ST
PACIFSM974133 (6/23/11)
FEDERAL WAY WA 98003-5433
SEATTLE WA 98134
111 S SPOKANE ST
SEATTLE WA 98134
Census Category: 555 - Non-structural roofing permits
Includes: #1 #2
#3 #4
ilipcupancy Class:
Aruction Tv e:
binc Load:
71ft-Af u s. ft. 0 0
0
Additional Permit Information
Mechanical to be Included? .................................. No
Permit for Building Shell Only?............................No
dF
ASA
Nuiuki of Stories..................................................1
lov -W
Plumbing to be Included?......:..............,....:............No
No Fixtures Associated With This Permit H
PERMIT EXPIRES Monday, February 1, 2010
Permit Issued on Wednesday, August 5, 2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. r
Owner or agent: dater f
S ...:ss,l0 12/t�o9
THIS CARD IS TO RFMAIN ON-SITE
CITY OF _ Construction Ins xtion Record
Federal Way INSPECTION REQUW� : (253) 835-3050
PERMIT #: 09 -103003 -00 -CO Address: 2405 S 300TH ST
Owner: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY, WA 98003-4225
Scheduled inspections maybe failed.if this card is not on-site. DO NOT LOSE THIS CA It D. Inspections are listed as close to sequential order as -
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On=going inspections are logged on the back of this card.
For inspector reference only
❑ Rough Electrical ❑ FINAL - Electrical
Approved Approved
By Date By Date
Footings/Setback (4110)
Shear Walls (4245)
Foundation Wall (4115)El
Roof Sheathing (4220) ,
Drainag ownspout (4040)
Approved to install flooring
Approved to place concrete
Approved to place concrete
By
Approved to backfill
By
Date
By
Date
By
Date
For inspector reference only
❑ Rough Electrical ❑ FINAL - Electrical
Approved Approved
By Date By Date
Re -steel (4215)
Shear Walls (4245)
Slab/Concrete Floor (4255)
Roof Sheathing (4220) ,
Underfloor Framing (4285)
Approved to install flooring
Approved to place concrete or grout
Approved to place concrete
By
Approved to sheath floor
By
Date
By
Date
By
Date
For inspector reference only
❑ Rough Electrical ❑ FINAL - Electrical
Approved Approved
By Date By Date
Floor Sheathing (4105)
Shear Walls (4245)
Roof Sheathing (4220) ,
Approved to install flooring
Approved to install siding
Approved to install roofing
By
Date
By Date
By
Date
(4120)
Prior to scheduling a Framing inspection;
E]
Fire/Draft Stops (4095)Framing
Approved -
Electrical, Plumbing & Mechanical Rough -in and
Approved to insulate
By
Date
Fire/Draft Stop inspections must be signed -off and
By
Date
approved. IBC 109.3.4
i
E]
Suspended Ceiling Grid (4265)
E] Gypsum Wallboard Nailing (4130)
Insulation (4150)
Approved to install wallboard
Approved to install mud & tape
Approved to drop the
By
Date
By Date
By
Date
Final - Building (4050)
Final - Fire Department (4060)
Approved
Approved
!
i
By
Date
By •} Date
f
For inspector reference only
❑ Rough Electrical ❑ FINAL - Electrical
Approved Approved
By Date By Date
City of Federal Way
Community Development Services
RC. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: WILDWOOD ELEMENTAR
Project Address: 2405 S 300TH ST
Building - Cvmryterceial
Permit #: 09 -103003 -00 -CO
Inspection Request Line: (253) 835-3050
Parcel Number: 042104 9167
Project Description: REP - Mechanically attach 1/2" thicj wood fiber board over existing roof. Install 3 -ply hot
asphalt roof system and associated flashing.
Owner
Applicant
Contractor
Lender
FEDERAL WAY PUBLIC
PACIFIC SHEET METAL &
PACIFIC SHEET METAL &
SCHOOLS
ROOFING
ROOFING
31405 18TH AVE S
1 I 1 S SPOKANE ST
PACIFSM974133 (6/23/11)
FEDERAL WAY WA 98003-5433
SEATTLE WA 98134
111 S SPOKANE ST
SEATTLE WA 98134
Census Category: 555 - Non-structural roofing permits
Includes: # l #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.) 0 0 0 0
Additional Permit Information
17.
McClz7nicai to bu Inclucled'?.................................. No Number of Stories .................................................. 1
Pcrrnit for Building Shell ()Illy? ........ ::.................. No Plumbing to be Included? .......................................
No Fixtures Associated With This Permit II
PERMIT EXPIRES Monday, February 1, 2010
Permit Issued on Wednesday, August 5, 2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: A R 071 Date: 1
CITY OF
Federal Way
PERMIT #:
THIS CARD IS TO REMAIN ON-SITE
Construction Ins Action Record
INSPECTION RFQUWG: (253) 835-3050
09 -103003 -00 -CO Address: 2405 S 300TH ST
Owner: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY; WA 98003-4225
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On=going inspections are logged on the back of this card.
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ❑ Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud & tape Approved to drop tile
By Date By Date By Date
❑ -
Footings/Setback(4110)
El
Foundation Wall (4115)
❑
DrainagelDownspout (IF40)
0)
By
Approved to place concrete
By
Approved to place concrete
By
Approved to backfill
By
Date
By
'Date
By
Date
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ❑ Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud & tape Approved to drop tile
By Date By Date By Date
❑ -
Re -steel (4215)
Shear Walls (4245)
Approved to install siding
Slab/Concrete Floor (4255)
Roof Sheathing (4220)'
Approved to install roofing
By
Underfloor Framing (4285)
By
Approved to place concrete or grout
By
Date
Approved to place concrete
Approved to sheath floor
By
Date
Fire/Draft Stops (4095)
Approved
By
Date
E]
By
Date
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ❑ Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud & tape Approved to drop tile
By Date By Date By Date
❑ -
Floor Sheathing (4105)
Approved to install flooring
Shear Walls (4245)
Approved to install siding
❑
Roof Sheathing (4220)'
Approved to install roofing
By
Date
By
By Date
By
Date
E]
Fire/Draft Stops (4095)
Approved
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
E]
Framing (4120)
Approved io insulate
By
Date
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
BY
Date
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ❑ Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud & tape Approved to drop tile
By Date By Date By Date
❑ -
final - Fire Department (4060)
Final - Building (4050)
Approved
Approved
By
Date
By t
Date o.{
For ins s reference only
O Rough Electrical 0 FINAL - Electrical
Approved Approved
By Date By Date
COMMUNITY DEVELOPMENT SERVICES
253-83560-27• FAX 253-835-2609
od+rmf! vfr. rn[rrar g rnrn
PERMIT
APPLICATION
SF MF CD ME EL PL DE EN FP
PROPERTY
SITE ADDRESS
24o 5 S , 3004h
st ' Eos t AL WAY , W A -
AUG 0
SIIITE/UNIT #
ZONING ASSESSOR'S TAX/PARCEL #CITY
l L KA L V AY
_
CUSL
PROJECT
NAME OF PROJECT
(Tenant or Homeowner Name)
❑ BUILDING ❑ PLUMBING ❑ MECHANICAL
TYPE OF PERBUT
❑ DEMOLITION El ELECTRICAL El ENGINEERING ❑FIRE PREVENTION
E Kl5T lROT
LT ROOF 5VSTV-M
PROJECT DESCRIPTION
Detailed description of u)ork to
this
hO ASSOCIAIED fLASIAING
be included on permit only
PEONY
NAME
PRIMARY PHONE
PROPERTY OWNER
�rt.i L POBLIC SC906LS
(253 )945 -loon
MAMING ADDRESS, CITY, STATE, ZIP
E-MAIL
31405 184,h AVE. S, F10ERA►. WAY) WA -
CONTRACTOR APPLICANT
PROJECT CONTACT
OWNER IS ALSO:
NAME
hCiv« S1+1rf-t mgsk,L'a R��,Nc�
PRIMARY PHONE
(24WW'L -5354
MAILING CRESS' ate' STD' ZIP
spom1ta ST. SEA. WA. 9813N
FAX
(1a�) G%2 - 4lol
CONTRACTOR
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE #
1RCXFSMg1q'53
\ti i3% ion
NAME i�`
PRD#ARY PRONE
O N Tft �► �'C o R +
( ) -
APPLICANT
MADAVG ADDRESS. CITY. STATE, ZIP
FAX
PRDRAKY PHONE
b) (ow. - 5 3 64
PROJECT CONTACT
NAME -- —
D L A Kf'
(The individual to receive and
MAIIdG ADDRESS, CITY, STATE, ZIP e a 1I
S'v. E-A . w A • v 131
FAX
66 L y1 OJ.
respond to all correspondence
this
concerning application)
w $ . wy knl )
(106 ) -
ALTERNATE CONTACT NAME: PRIMARY PHONE
NAME
E-MAD.
OWNER -FINANCED
PROJECT FINANCING
Required for projects with
MAILING ADDRESS, CITY, STATE, ZIP
PRIMARY PHONE
value of $5, 000 or more
(RCW J9.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the
best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply
with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that
the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred
in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the
city, but only where such claim
arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city
as apart of this application.
$O
SIGNATURE:
DATE
_
PRINT NAME: Q-LI- K
MG
MI l.J�rl Q [i
Bulletin #100 — 4/21/2009 Page 1 of 4