Loading...
09-103910Mechanical City ityDev Federal Development Permit #: 09 -103910 -00 -ME Way Community Development Services P.O. Box 9718 Federal Way, WA 98063-9718 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BERGER Project Address: 2240 S 292ND ST Parcel Number: 422290 0020 Project Description: REPLACE GAS FURNACE Owner Applicant Con ractor DARRF .l. BERGER NA1DA KHAN WASHINGTON ENERGY SERVICES CO 2240!3 -292ND ST NORTHWEST PERMIT INC (GENERAL) FEDERAL WAY WA 98003-3822 1345 GULF RD WASFIIES9710B (9/2/11) POINT ROBERTS WA 98281 2800 TI IORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Mechanical Valuation-- .......................................2351.00 Is this an Online or O.T.C. application?...... ............. Yes Mechanical Fixtures A _ Furnaces ................. ...... ...... PERMIT EXPIRES Monday, April 5, 2010 Permit Issued on Wednesday, October 7, 2009 IA/nl I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of MStateWash' gton anjthe City o Federal Way. Owner or agent: Date FINpUM> 3/7-3/M THIS CARD IS TO REMAIN ON-SITE CITY Or - Construction I ___,pection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 09 -103910 -00 -ME Address: 2240 S 292ND ST Owner: DARRELL BERGER FEDERAL WAY, WA 98003-3822 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom),. Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card Mechanical Rough-in(41 5)Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) 7By Approwd By Approved to release test Approved Date Date By Date By Date,, Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date