Loading...
10-103345City of Federal Way Applicant Community Development Services P.O. Box 9718 ,�.0 9i Federal Way, WA 98063-9718 r�� J Ph: (253) 835-2607 Fax: (253) 835-2609 FAST WATER HEATER COMPANY Project Name: NIANG ' ` Project Address: 2016 S 301ST PL Project Description: REMOVE/REPLACE GAS WATER HEATER Me0 anical Permit #: 10 -10334.5 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 798290 0300 Owner Applicant Contractor SAMBA & KIMBERLY NIANG CAROL RANDALL FAST WATER HEATER CO (GENERAL) 2016 S 301ST PL FAST WATER HEATER COMPANY FASTWWH948BC (1/4/12) FEDERAL WAY WA 98003-4262 12601 132ND AVE NE 12601 132ND AVE NE KIRKLAND WA 98034 KIRKLAND WA 98034 47 Mechanical Valuation .......................... Hot Water Tanks.. - - . — . .................. 1 Additional Permit Information ...1084.00 Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures PERMIT EXPIRES Monday, January 31, 2011 Permit Issued on Wednesday, August 4, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington a i and the City of Federal Way. Owner or agent: ' Date: 0 v r FINA-LED gels/p � CITY OF 'gffo � Federal Way PERMIT #: Owner: THIS CARD IS TO RFMAIN ON-SITE %onstruction Ins ection Record INSPECTION REQUESTS: (253) 835-3050 10 -103345 -00 -ME Address: 2016 S 301ST PL SAMBA & KIMBERLY NIANG FEDERAL WAY, WA 98003-4262 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. rl Mechanical Rough -in ( 16S) Gas Piping 4125) El Final - Mechanical (4005) Approved Approved to release test Approved By Date By Date f3y...' Date (31_0 El Rough Electrical ❑Final Electrical E]Right of Way Approved Approved Approved By Date By Date By Date