Loading...
19-105869-00-SU-Answer Letter-12-11-2020-V11 | P a g e Eunhee Kim/Eui S Kim 37325 8th Ave S Federal Way, WA 98003 PERMIT #20-101562-00SM December 11, 2020 City of Federal Way Department of Planning Services Attention: Becky Chapin, Senior Planner, 253-835-2641, becky.chapin@cityoffederalway.com Re: File #19-105869-00-SU Graceland Short Plat, 37345 8th Avenue South, Federal Way Answer to Technical Comment Letter dated March 19, 2020 We, applicant answer to Technical Comment Letter dated March 10, 2020 per Comments; COMMUNICATION DEVELOPMENT-PLANNIN DIVISION Becky Chapin, ANSWER 1: • Noted on the drawings • Changed scale to 1 inch = 60 ft • Building setback are fixed. • Added. 2 | P a g e ANSWER 2: • The City accepted “WETLAN DETERMINATION RECONNAISSANT REPORT” prepared by BAI Inspection Services LLC, dated June 30, 2020. (See Exhibit #001). ANSWER 3: The Map is revised on drawing Sheet 1 of 3 and is attached to this report. ANSWER 4: The trees are drawn on the map with existing trees and new trees with minimum 20 trees per each lot. ANSWER 5: The Open space are more than 10% per each lot. Maximum building coverage area will be 2,000 sq feet per lot and the coverage ratio is 6 % of the lot area. 3 | P a g e ANSWER 6: The pedestrian and bicycle access will be added and utilized by using 5 ft side walk on 373th Street S and 8th Ave S shown on the final plan. PUBLIC WORKS-DEVELPOMENT SERVICES Ann Dower ANSWER 1: For Right-of-Way improvements, the applicant got the City’s Modification letter of Permit #20-101562- 00-SM dated July 1, 2020. (See Exhibit #002). ANSWER 2: Street section are shown on the C-01 and C-02 plan. ANSWER 3: noted on each plan. ANSWER 4: updated and stamped with signature. ANSWER 5: shows all distance to the structure. ECHNICAL INFORMATION REPORT ANSWER 6: Civil Engineer, Eui Kim, licensed #53437, signed and stamped. 4 | P a g e ANSWER 7: • Engineering plan C-01, C-02 an C-03 are designed and added. • Erosion and sediment control plan is added on C-3 plan. • Imperative area 3,547 sf are considered in Technical Information Report page 10 and BMP plan is added on C-3 plan. • A conveyance system of each property will be submitted at the time of each lot development. • No detention facility until individual development finalized. • Water quality treatment is not required per Wetland Determination Reconnaissance Report( Exhibit #003). • BMP plan and noted is attached on C-03 plan. • Enhanced basic water quality is not required per Wetland Determination Reconnaissance Report attached. • Revised TIR report attached (see Exhibit #004) PUBLKIC WORKS-TRAFFIC DIVISION Sarady Long ANSWER 1: Street design of 373th Street S and 8th Ave S are added on C-1 and C-2 plan attached. 5 | P a g e ANSWER 2: Tapers and transition are 40 ft at the connection to East of 373th Street, ANSWER 3: Driveway serving the individual lot has 25 ft width shown on the C-1 plan. ANSWER 4: Lighting pole is shown at the corner of 373th Street and 8th Ave S on C-1 plan. LAKEHAVEN WATER &SEWER DISTRICT Brian Asbury ANSWER : Lakehaven’s certificate was issued and application will submit after getting the subdivision approved. 6 | P a g e FINAL ISSUE-LOCAL IMPROVEMENT DISTRICT WAIVER OF PROTEST COVENANT: Applicant finds that the Modification of Right-of-Way Letter dated July 1, 2020 by the City is not matched with the existing street conditions (See street plan C-1 Plan) and also, it is a big difference between P-Type of Street required ON THE FINAL PLAN by the City after subdivision completed. Modified Right-of-way requires Applicant to install one-foot extension of the current 10 ft street from the center of the street of 373th Street and 5 ft asphalt sidewalk for 373th Street but the current street has 2 ft shoulder only and total 6 ft improvement cannot be possible. Also, one ft extension of the asphalt street and 5 ft crushed sidewalk required for 8th Ave S but the current condition has no space for a 6 ft distance of these modifications (see C-1 plan). Besides, the current street capacity covers a full traffic demand even this subdivision approved per Capacity Reserve Certificate (CRC) of the City of Federal Way (Exhibit #005) dated March 17, 2020. So, the final Right-of-Way to make P-Type Road needs to be delayed per the City’s construction schedule of the whole line of 373th Street and 8th Ave S Street. In conclusion, even the City proposed Local Improvement District (LID) Waiver Protest Covenant (Exhibit #002) attached the letter of Right-of-Way modification dated July 1, 2020, which is asking Applicant agreement but the city has no LID program. So, if it is not possible to sign on the sheet of LOCAL IMPROVEMENT DISTRICT(LID)/WAIVER OF PROTEST COVENANT, Applicant propose a Bond deposit of $34,440.00 with the Federal Way City’s Amount calculation (Exhibit #003). Please review the proposed Bond deposit and change the Bond form agreement into the letter dated July 1, 2020. Then, Applicant will sign it. [END] Regards, --------------------------------- ------------------------------------- Eui S Kim, PE Eunhee Kim On behalf of Eunhee Kim, Applicant Applicant/Property Owner EXHIBITS: • #001: “WETLAN DETERMINATION RECONNAISSANT REPORT” prepared by BAI Inspection Services LLC, dated June 30, 2020 • #002: City’s Modification letter of Permit #20-101562-00-SM dated July 1, 2020. • #003: Propose Bond deposit $34,440.00 with the Amount calculation. • #004: Revised Technical Information Report dated December 10, 2020 • #005: Capacity Reserve Certificate (CRC) • #006: DRAWINGS: Surveyor map 3 sheets and civil design plan for street design 3 sheets.