21-102248 - PermitCity or Federal Way
Community Development DepL
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PAK
Project Address: 33404 33RD PL S
Project Description: BLUEBEAM - Construction of ramp.
Building - Single Family
Permit #:21-102248-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 614360 0d26
Owner
Applicant
Contractor
Lender
CHOLU PAK
JINSOON PAK
OWNER IS CONTRACTOR
OWNER 1S LENDER
3309 S 334TH ST
3309 S 334TH ST
FEDERAL WAY WA 98001
FEDERAL WAY WA 98001
Census Category: 434 - Residential alt/add - no change in number of units
Includes;
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No Number of Stories..........,.,.................................,.... l
Is this an Online or O.T.C. application? .................. No Plumbing to be Included?......................................... No
Total Valuation: 8,000.00
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Wednesday, 2 February, 2022
Permit Issued on Friday, August 6, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washingto eIL
r".
eral Way.
Owner or agent: Date:
_N�
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 21 102248 00 Address: 33404 33RD PL S
Project: JINSOON PAK FEDERAL WAY WA 98001
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q SWM Precon Site Mtg (4400) 0 Initial Erosion Control (4365) 0 Footings/Setback (4110)
Approved To be done PRIOR to breaking ground Approved to place concrete
By Date By Date By Date
® Foundation Wall (4115) ® Drainage/Downspout (4040) N1 Slab/Concrete Floor (4255)
Approved to place concrete Approved to backfill Approved to place concrete
By Date By Date By Date
Shear Walls (4245)
Approved to install siding
By Date
10 Roof Sheathing (4220)
1 1 Fire/Draft Stops (4095)
12 Interim Erosion Control (4370)
Approved to install roofing
Approved
Approved
By Date
By Date
By Date
ior to scheduling a Framing inspection;
3 Framing (4120) 14 Insulation (4150)
Plumbing & Mechanical Rough -in
ire/Draft Stop inspections must be signed -
[.:Electrical,
Approved to insulate Approved to install wallboard
off and approved. IBC 109.3.4
By Date By Date
15 Gypsum Wallboard Nailing (4130)
Is Final Erosion Control (4375) 17 Final - Building (4050)
Approved to install mud & tape
Approved Approved
By Date
By Date Br/'�, Date (�///
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date