Loading...
20-101386-CO-ECG Plans-04-18-2022ΡΓ∆∆Σ ΝΕ ∆ΡΛ ΙΝΑ ΜΝ− 0775,//0,/05,//04 οθδοθδχ αξ Υηβηµησξ Λο Ργδδσ Ηµχδω DESCRIPTION 020 DRAWING NO.SHEET NO.\\\\esm8\\engr\\ESM-JOBS\\1886\\001\\016-0015\\plots\\Clear and Grade\\CV-01.dwg4/18/2022 2:34 PMPlotted:File:Plotted By: Brandon Avalos223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4 Ε∆Χ∆Θ≅Κ ς≅Ξ+ ς≅ 87//2 Ογνµδ9 ∋142( 727,5002 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H EXISTING CONDITIONSEX-01 CV-01 COVER SHEET NOT TO SCALE µ NORTH LAKE LAKE GENEVA LAKE KILARNEY BROOK LAKE HYLEBOS STATE PARK PANTHER LAKE PANTHER LAKE PARK CELEBRATION PARK 5 18 S 348TH ST 99 161 S 336TH ST S 320TH ST S 356TH ST S 342ND ST S 352ND ST SW 330TH ST S 340TH ST S 344TH ST S 343RD ST PACIFIC HWY SS 324TH ST 9TH AV S13TH PL SWEYERHAUSERWY S38TH AV S1ST AV S1ST AV S1ST WY SMILITARY RD SPEASLEY CANYON RDT.E.S.C. AND GRADING PLANGR-01 - GR-07 οθδοθδχ ενθ 2 1 ΒΚ∆≅ΘΗΜΦ ≅ΜΧ ΦΘ≅ΧΗΜΦ ΟΚ≅ΜΡ ενθ ςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅! Βησξ νε Εδχδθκ ςξ LEGENDLG-013 ΡΗΣ∆ Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒ Χ≅Μ≅ ΝΡΣ∆ΜΡΝΜ 7736 ΗΛΟ∆ΘΗ≅Κ ΓΗΦΓς≅Ξ+ ΡΤΗΣ∆ Γ ΧΝςΜ∆Ξ+ Β≅ 8/131 GR-0812 POND CROSS SECTIONS ΟΘΝΙ∆ΒΣ ΒΝΜΣ≅ΒΣΡ9 {CIVIL ENGINEER }ESM CONSULTING ENGINEERS LAURA BARTENHAGEN, PE, LEED AP 33400 8TH AVE S SUITE #205 FEDERAL WAY, WA 98003 (253) 838-6113 { LANDSCAPE ARCHITECT} ESM CONSULTING ENGINEERS LEANNE KUHLMAN 33400 8TH AVE S SUITE #205 FEDERAL WAY, WA 98003 (253) 838-6113 {GEOTECHNICAL ENGINEER} GEOENGINEERS STEVE HELVEY 1101 FAWCETT AVE SUITE #200 TACOMA, WA 98402 {ARCHITECT }CRAFT ARCHITECTS PLLC KATHY CRAFT 2505 3RD AVE, SUITE #324 SEATTLE, WA 98121 (206) 720-7001 {OWNER / AGENT} FEDERAL WAY CAMPUS, LLC TOM MESSMER 8847 IMPERIAL HIGHWAY, SUITE H DOWNEY, CA 90242 {WETLAND CONSULTANTS} TALASAEA ASSOCIATES BILL SHIELS / JENNIFER MARRIOTT 15050 BEAR CREEK RD NE WOODINVILLE, WA 98077 (425) 861-7550 {TRANSPORTATION ENGINEER} TENW JEFF SCHRAMM 816 6TH ST S KIRKLAND, WA 98033 (425) 250-0581 Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 Φ∆Μ∆Θ≅Κ ΜΝΣ∆Ρ 1.PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO PRE-CONSTRUCTION MEETING. 2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FEDERAL WAY REVISED CODE (FWRC), APPLICABLE ORDINANCES, AND THE CITY COUNCIL CONDITIONS OF PROJECT APPROVAL. THESE DOCUMENTS ARE SUPPLEMENTED BY THE MOST RECENT VERSION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (WSDOT/APWA), THE KING COUNTY ROAD STANDARDS (KCRS), AND THE KING COUNTY SURFACE WATER DESIGN MANUAL (KCSWDM). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL ENGINEER TO CORRECT ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO THE CITY OF FEDERAL WAY. 3.THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO THE FEDERAL WAY ENGINEERING REVIEW CHECKLIST. SOME ELEMENTS MAY HAVE BEEN OVERLOOKED OR MISSED BY THE CITY ENGINEERING PLAN REVIEWER. ANY VARIANCE FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF FEDERAL WAY, PRIOR TO CONSTRUCTION. 4.APPROVAL OF THIS ROAD, GRADING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (I.E. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICITY, ETC.) 5.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF FEDERAL WAY, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTION REPRESENTATIVE. 6.A SIGNED COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 7.ON-SITE CONSTRUCTION NOISE SHALL BE LIMITED AS PER FWRC (SECTION 19.105.040); NORMALLY THIS IS 7:00 A.M. TO 8:00 P.M., MONDAY THROUGH FRIDAY, AND 9:00 A.M. TO 8:00 P.M. ON SATURDAYS. 8.RIGHT-OF-WAY CONSTRUCTION IS ALLOWED 8:30 A.M. TO 3:00 P.M. MONDAY THROUGH FRIDAY. WRITTEN AUTHORIZATION TO WORK OUTSIDE OF THESE HOURS MUST BE GRANTED BY THE PUBLIC WORKS DIRECTOR. 9.IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF-SITE WORK WITHIN THE ROAD RIGHT-OF-WAY. 10.FRANCHISED UTILITIES OF OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL CITY REQUIREMENTS AND THE REQUIREMENTS OF KCRS CHAPTER 8 ARE SUBMITTED TO THE CITY OF FEDERAL WAY AT LEAST THREE DAYS PRIOR TO CONSTRUCTION. 11.VERTICAL DATUM SHALL BE KCAS OR NGVD-29. 12.GROUNDWATER SYSTEM CONSTRUCTION SHALL BE WITHIN A RIGHT-OF-WAY OR APPROPRIATE DRAINAGE EASEMENTS, BUT NOT UNDERNEATH THE ROADWAY SECTION. ALL GROUNDWATER SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE WSDOT/APWA STANDARD SPECIFICATIONS. 13.ALL UTILITY TRENCHES IN THE RIGHT-OF-WAY SHALL BE BACKFILLED 5/8{”} CRUSHED ROCK AND COMPACTED TO 95% DENSITY. WHEN TRENCH WIDTH IS 18 INCHES OR LESS, AND IS WITHIN THE TRAVELED WAY, TRENCH WILL BE BACKFILLED WITH CONTROL DENSITY FILL (SELF-COMPACTED FLOWABLE FILL) AS DEFINED BY WSDOT 2-09.3(1)E. THE AGGREGATE WILL BE 3/8-INCH MINUS. 14.ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95% DENSITY IN ACCORDANCE WITH WSDOT 2-06.3. 15.OPEN CUTTING OF EXISTING ROADWAYS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE PUBLIC WORKS DIRECTOR AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH KCRS 8.03(B) 3. 16.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23 TRAFFIC CONTROL, SHALL APPLY. 17.CONTRACTOR SHALL PROVIDE AND INSTALL ALL REGULATORY AND WARNING SIGNS PER THE LATEST EDITION OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 18.ALL UTILITIES SHALL BE ADJUSTED TO FINAL GRADE AFTER PAVING ASPHALT WEARING COURSE. 19.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION ONLY. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CFW DRAWING NUMBERS 3-22, 3-23. ROCKERIES MAY NOT EXCEED SIX FEET IN HEIGHT FOR CUT SECTIONS OR FOUR FEET IN HEIGHT FOR FILL SECTIONS UNLESS DESIGNED BY A GEOTECHNICAL OR STRUCTURAL ENGINEER LICENSED IN THE STATE OF WASHINGTON. ” GR-0913 T.E.S.C. AND GRADING NOTES AND DETAILS TREE RETENTION PLANTR-014 \pxqj;NORTH LAKE ADD TO EAST TACOMA LOT 7 FEDERAL WAY BLA #17-100484-SU REC #20171103900001 SD BLA BEING POR S 1/2 OF SE 1/4 16-21-4 & POR NW 1/4 & NE 1/4 & SE 1/4 & SW 1/4 21-21-4 & LOTS 1 THRU 8 BK 18 NORTH LAKE ADD TO EAST TACOMA & LOTS 8 & 10 THRU 15 & POR LOT 9 LOUISE'S NORTH LAKE TRACTS TGW RDS ADJ Κ∆Φ≅Κ Χ∆ΡΒΘΗΟΣΗΝΜ ΒΗΣΞ ΟΤΑΚΗΒ ςΝΘϑΡ Χ∆Ο≅ΘΣΛ∆ΜΣ NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 409.80HV105S SS D P P PP 10 8 T x x x xx x xx x TC.B.P x x x xx x xx x D S COSP COSP P P S T T PP P P T T PP D P IR S T T COS G W G D COS S T PB PB PB PB PB PB PB PB PB PB PB PB PB T PB D D PB PB D PB W D D D D D D D D T T T S P W W D D S SGATE µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 40 7/& 16080 Χ≅ΣΤΛ9 Μ−Φ−Υ−Χ− 18 (PUBLIC RIGHT OF WAY)(PUBLIC RIGHT OF WAY) MINOR ARTERIAL (PUBLIC RIGHT OF WAY)(PUBLIC RIGHT OF WAY)(PUBLIC RIGHT OF WAY)ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−Ρ− 225ΣΓ ΡΣΘ∆∆Σ2/ΣΓ ≅Υ∆ΜΤ∆ Ρ− ΚΝΝΟ ΘΝ≅ Χ (PRIVATE ROAD) ΚΝΝ Ο Θ Ν ≅ Χ (PRIVATE ROAD) 2 2 Θ Χ Ο Κ ≅ Β ∆ Ρ − SECTION 22 SECTION 21 ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ− ΕΝΘ∆ΡΣ∆Χ ΑΤΕΕ∆Θ 50.0' FORESTED BUFFER 50.0' FORESTED BUFFER Κ∆Φ∆ΜΧ BOLLARD INFORMATION SIGN S SANITARY SEWER MANHOLE STORM DRAIN CATCH BASIN STORM PIPE INLET/OUTLET P GUY ANCHOR POWER POLE T TELEPHONE MANHOLE WATER VALVE LUMINARY WITH ARM GAS MARKER POST LUMINARY GAS VALVE G POWER POLE WITH TRANSFORMER P POWER VAULT TELEPHONE RISER TELEPHONE JUNCTION BOC WATER METER FIRE HYDRANT POWER JUNCTION BOXPB GATE ENDUTILITY VAULT STORM CULVERT SANITARY SEWER MANHOLE COS OVERHEAD POWER LINESUNDERGROUND POWER LINESUNDERGROUND NATURAL GAS LINESUNDERGROUND WATER LINES UNDERGROUND FIBER OPTIC LINES UNDERGROUND TELEPHONE LINES SANITARY SEWER FORCE MAIN IR IRRIGATION CONTROL BOX Α≅ΡΗΡ ΝΕ Α∆≅ΘΗΜΦ (AKA PRIMARY STATE HIGHWAY NO. 2 - PUBLIC RIGHT OF WAY)ΡΣ≅ Σ∆ ΘΝΤ Σ∆ 0 7 TRAIL TRAIL TRAIL TRAIL TRAIL ASPHALT CONCRETE WALK CONCRETE CURB GRAVEL STORAGE AREA ECOLOGYBLOCK WALL GRAVEL ROADGRAVEL PATHASPHALT PAVEMENTASPHALT PAVEMENT ASPHALT WALK {\Ff:\r13c4\com\fonts\romans|c0;LOT 1, CITY OF FEDERAL WAY BOUNDARY LINE ADJUSTMENT NO. 16-102886-00-SU, RECORDED UNDER RECORDING NUMBER 20170210900007, IN KING COUNTY, WASHINGTON.} Κ∆Φ≅Κ Χ∆ΡΒΘΗΟΣΗΝΜ WASHINGTON COORDINATE SYSTEM (WCS) - NORTH ZONE (BASED UPON NAD 83\\11) UTILIZING THE WASHINGTON STATE REFERENCE NETWORK (WSRN) IN NOVEMBER, 2015. Α≅ΡΗΡ ΝΕ ΓΝΘΗΨΝΜΣ≅Κ Χ≅ΣΤΛ NGVD 29 ELEVATIONS REFERENCED TO CITY OF FEDERAL WAY BENCH MARK NO. 144 TOP OF 2" IRON PIPE INSIDE MONUMENT CASE LOCATED AT THE INTERSECTION OF S 320TH ST AND 32ND AVE S ELEVATION=462.933 NGVD 29 Υ∆ΘΣΗΒ≅Κ Χ≅ΣΤΛ Σ∆ΛΟΝΘ≅ΘΞ Α∆ΜΒΓ Λ≅ΘϑΡ TRAIL BURIED COMMUNICATIONS EASEMENT AND SEWER EASEMENT RECORD NO. 20001214000760 (VACATED RIGHT OF WAY)S. 338TH STREET\pxql;VACATED RIGHT OF WAY - {\Fsimplex|c0;SEE KING COUNTY ORDINANCE NO. }00328 (AKA V-1353) DATED FEBRUARY 2, 1970 AND RECORDED UNDER RECORDING NO. 7111090451(VACATED RIGHT OF WAY) 29TH AVENUE S. (VACATED RIGHT OF WAY) 31ST AVENUE S.(VACATED RIGHT OF WAY)S. 340TH STREET\pxql;VACATED RIGHT OF WAY - {\Fsimplex|c0;SEE KING COUNTY ORDINANCE NO. }00328 (AKA V-1353) DATED FEBRUARY 2, 1970 AND RECORDED UNDER RECORDING NO. 7111090451APPROXIMATE LOCATIONOF TELEPHONE EASEMENT RECORDINGNO. 9201160717(VACATED RIGHT OF WAY) 30TH AVENUE S.15'OWNER: FEDERAL WAY CAMPUS, LLC 8847 IMPERIAL HIGHWAY, SUITE H DOWNEY, CA 90242 APPROXIMATE LOCATION OF15' X 15' TELEPHONE EASEMENTRECORDING NO. 920116071768'23'ASPHALT TELEPHONE EASEMENT RECORDING NO. 5678223 ASPHALT ASPHALTASPHALTPOWER VAULT ASPHALT PAVEMENT CONCRETE WALKCONCRETE CURBINGRESS AND EGRESS EASEMENT OVER EXISTING ROADS RECORDING NO. 2011022300000630'20'TELEPHONE EASEMENT RECORDING NO. 820390510WATER EASEMENT RECODING NO. 6693957WATER EASEMENT RECORDING NO. 6693956(VACATED RIGHT OF WAY) 30TH AVENUE S. GUARD RAIL WIRE FENCE GATE CONCRETE WALK A 44925 T S SGIRE DRETE GNTE FO IHSAW T ON \pxql;VACATED RIGHT OF WAY - {\Fsimplex|c0;SEE KING COUNTY ORDINANCE NO. }00328 (AKA V-1353) DATED FEBRUARY 2, 1970 AND RECORDED UNDER RECORDING NO. 7111090451TRAIL TRAILTRAILAPPROXIMATE LOCATIONOF TELEPHONE EASEMENT RECORDINGNO. 9201160717\pxt4;PRESCRIPTIVE RIGHTS FOR AN EXISTING GAS LINE NOTE: FORMER EASEMENT PER RECORDING NO. 8010100959 WAS EXTINGUISHED BY RECORDING NO. 1990817001304 ASPHALT ASPHALTASPHALT ASPHALT WIRE FENCE BURIED COMMUNICATIO NS EASEMENT AND SEWER EASEMENT RECORD NO. 15'(VACATED RIGHT OF WAY)S. 342ND STREETDQ CATEGORY III 703 SF DR CATEGORY III 3,240 SF EB CATEGORY III 1,601 SF (TO BE FILLED) ED CATEGORY III 3,234 SF (TO BE FILLED PORTIONS OFFSITE) EE CATEGORY III 1,881 SF (TO BE FILLED) ς∆ΣΚ≅ΜΧΡ9 Β Ο , 0 Ψ Ν Μ ∆ Θ Ρ , 8 − 5 Ψ Ν Μ ∆ NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\EX-01.dwg4/18/2022 2:37 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!EXISTING CONDITIONSWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 EX-01 LGB JJH 04/19/2022 ∆Ω,/0 1 02 Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 PARCEL #6142600005 PARCEL #6142600200 NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 BW BACK OF WALK OHW ORDINARY HIGH WATER TOP/TOE OF SLOPE STREAM WITH BUFFERWETLAND WITH BUFFER STORM DRAIN PIPE N.G.P.E. FENCE INSIDE DIAMETER INVERT ELEVATION INCHES LENGTH POUNDS LINEAL FEET MAXIMUM MANUFACTURER MANHOLE MINIMUM MECHANICAL JOINT MISCELLANEOUS NORTH NUMBER NOT TO SCALE ON CENTER OUTSIDE DIAMETER POINT OF INTERSECTION POWER POLE POINT OF VERTICAL INTERSECTION POLYETHYLENE PERFORATED POLYVINYL CHLORIDE PAVEMENT POINT OF VERTICAL TANGENCY POINT OF CURVATURE POINT OF TANGENCY QUANTITY RETAINING RAILROAD RADIUS REDUCER REINFORCED REQUIRED RIGHT OF WAY SOUTH SCHEDULE SQUARE FEET SHEET SPECIFICATIONS SQUARE STATION STANDARD TOP OF CURB TELEPHONE THREADED THROUGH TYPICAL VERTICAL WEST WITH WITHOUT FL FLANGE AVENUE ASBESTOS CEMENT PIPE ADJACENT ALUMINUM AMERICAN NATIONAL STANDARDS INSTITUTE ANGLE POINT ASPHALT AMERICAN SOCIETY OF TESTING AND MATERIALS ASSEMBLY BLIND FLANGE BUILDING BLOCK BLOW OFF BEGIN VERTICAL CURVE CENTER CATCH BASIN CAST IRON CENTERLINE CLEAR CORRUGATED METAL PIPE CLEANOUT CONCRETE CONDUIT CONNECTION CONTRACTOR CONTINUED CUBIC YARDS CLASS CUBIC FEET CUBIC FEET PER SECOND DEGREE OF CURVATURE DUCTILE IRON DIAMETER DEPARTMENT OF TRANSPORTATION DIMENSION DRAWINGS DRAIN EDGE OF PAVEMENT EAST ELEVATION ELEVATION ELECTRICAL END VERTICAL CURVE EXISTING FIGURE FINISHED FLOWLINE FEET FORCE MAIN GAUGE GALVANIZED GALVANIZED IRON GATE VALVE W/O W/ W VERT TYP THRU THRD TEL TC STD STA SQ SPECS SHT SF SCH S R/W REQ REINF RED R RR RET QTY PT PC PVT PVMT PVC PERF PE PVI PP PI OD OC NTS NO N MISC MJ MIN MH MFR MAX LF LB IE ID GV GI GALV GA FM FT FIN FIG EXIST EVC ELEC EL ELEV E EOP D DWGS DIM DOT DIA/%%C DI DC CFS CF CL CY CONT CONTR CONN C CONC CO CMP CLR CI CB CTR BVC BO BLK BLDG BF ASSY ASTM ASPH AP ANSI ALUM ADJ AC AVE ≅ΑΑΘ∆ΥΗ≅ΣΗΝΜΡ (NR) (R) NON-RADIAL BEARING RADIAL BEARING < > DELTA ARC LENGTH FIRE HYDRANT REDUCER BEND TEE (W/ VALVES) CROSS (W/ VALVES) DETECTOR CHECK VALVE AIR-VAC ASSEMBLY BLOWOFF ASSEMBLY DOMESTIC / IRRIGATION METER CONCRETE BLOCKING BUTTERFLY VALVE GATE VALVE BEEHIVE MANHOLE STORM DRAIN MANHOLE CATCH BASIN TYPE 2 W/SOLID LID CATCH BASIN TYPE 1 W/SOLID LID BUILDING SETBACK LINE EASEMENT LINE BOUNDARY LINE SPOT ELEVATION SANITARY SEWER CLEANOUT VERTICAL CURB AND GUTTER EXISTING 821.54 RIP RAP PAD STRAW BALE GRAVEL CONE PROPOSED MONUMENT IN CASE FOUND MONUMENT IN CASE PROPOSED MONUMENT (AS DEFINED) 820 821.54 PROPOSED SANITARY SEWER GRAVITY SANITARY SEWER MANHOLE ROOF DRAIN CATCH BASIN TYPE 2 W/GRATE CATCH BASIN TYPE 1 W/GRATE CONCRETE SIDEWALK ROLLED CURB AND GUTTER ROADWAY CENTERLINE CONTOUR (MINOR) RIGHT-OF-WAY Κ∆Φ∆ΜΧ CLEARING LIMITS FILTER FABRIC FENCE CUTOFF SWALE INTERCEPTOR DITCH CONSTRUCTION ENTRANCE ROCK CHECK DAM SEDIMENT FILTER YARD DRAIN (ROUND LID) YARD DRAIN STORM DRAIN CLEAN-OUT D SANITARY SEWER STORM DRAINAGE S ROCKERY WATER STRAIGHT/RIGHT TURN ARROW HANDICAP PARKING INFORMATION SIGN TRAFFIC SIGN BIKE LANE STRAIGHT ARROW RIGHT TURN ARROW LEFT TURN ARROW STRAIGHT/LEFT/RIGHT TURN ARROW LEFT/RIGHT TURN ARROW STRAIGHT/RIGHT TURN ARROW TRAFFIC OM OM FOUND MONUMENT (AS DEFINED) T.E.S.C.P.SURVEY WETLAND FLAG BIKE RACK DEBRIS PILE FIRE PIT BOLLARD U HORSE SHOE PIT MAILBOX M MILE POST MARKER SOIL LOG SIGN COS SEPTIC DISTRIBUTION BOX S S SANITARY SEWER STUB MARKER POST SV SEPTIC VENT CO STORM PIPE INLET/OUTLET D D STORM DRAIN STUB MARKER POST ROOF DRAIN CATCH BASIN TV CABLE TV MARKER POST CABLE TV RISER SATELLITE DISH LUMINAIRE W/ARM LUMINAIRE LANDSCAPE LIGHT YARD LIGHT (UNDER 10' TALL) G GAS STUB MARKER POST GAS VALVE OC OIL FILLER CAP P GUY ANCHOR P GUY POLE POWER GRATE PB ELECTRICAL JUNCTION PULL/BOX P ELECTRICAL STUB MARKER POST ELECTRICAL METER POWER POLE W/DROP LINE & LIGHT POWER POLE W/DROP LINE, LIGHT & TRANSFORMER POWER POLE W/DROP LINE & TRANSFORMER POWER POLE W/LIGHT POWER POLE W/LIGHT & TRANSFORMER POWER POLE POWER POLE W/TRANSFORMER PAD MOUNTED TRANSFORMER P POWER VAULT/MANHOLE SIGNAL CONTROL BOX SIGNAL JUNCTION BOX TRAFFIC PEDESTRIAN POLE TRAFFIC SIGNAL POLE TRAFFIC SIGNAL POLE W/LIGHT FO FIBER OPTIC MANHOLE FO FIBER OPTIC STUB MARKER POST T TELEPHONE GUY ANCHOR T TELEPHONE ANCHOR POLE TELEPHONE JUNCTION BOX (UG) T TELEPHONE MANHOLE T TELEPHONE STUB MARKER POST TELEPHONE POLE TELEPHONE RISER FIRE DEPT CONNECTION HOSE BIB IR IRRIGATION CONTROL VALVE W WATER MANHOLE W WATER STUB MARKER POST MW MONITORING WELL PIV POST INDICATOR VALVE SPRINKLER HEAD W WATER VAULT WATER WELL FO FIBER OPTICS FENCE HOG WIRE FENCE, SPLIT RAIL FENCE, WIRE FENCE WROUGHT IRON RAILROAD TRACKSCREEK OR STREAM CENTERLINE EXISTING FEATURES BARRICADE MAILBOX SD SERVICE 6" CPEP WITH INVERT @ END OF PIPE 866.0 0+33 (STATION ALONG MAINLINE) 21 L.F. (STUB LENGTH) 866.0 (I.E. AT END OF STUB) 866.0 21 L.F.0+33 CONCRETE BLOCK WALL WATER PIPE W TELEPHONE (BURIED) OIL GAS POWER (BURIED) TV CABLE (BURIED) POWER (AERIAL) TELEPHONE (AERIAL) TV CABLE (AERIAL) C C G OIL P P T T GUARD RAIL FENCE, BOARD FENCE, BARB-WIRE FENCE, CHAIN-LINK FENCE, ELECTRIC SANITARY SEWER FORCE MAIN FM TOP OF WALLTOW/TW BOTTOM OF WALLBOW/BW FINISH GRADEFG STORM DRAINSD SANITARY SEWERSS WATER SAMPLING STATIONWSS FIRE DEPARTMENT CONNECTIONFDC ROADWAY CAP/PLUG 812 820 812 CONTOUR (MAJOR) STREET LIGHT BOLLARDS DOWNSPOUTS FOOTING DRAIN FLOWPATH Δ CL/ NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\LG-01.dwg4/18/2022 2:40 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!LEGENDWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 LG-01 LGB JJH 04/19/2022 ΚΦ,/0 2 02 GRADE BREAKRIDGE LINE\pxt1;GB \pxt1;GB N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H BUILDING SETBACK LINEBSBL Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 TT P T COS G W G D COS PB PB PB PB PB PB PB PB PB PB T PB W D AAA AAAAAA AAAE002 C.B. PP PPPP µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 25 4/& 10050 Χ≅ΣΤΛ9 Μ−Φ−Υ−Χ− 18 (PUBLIC RIGHT OF WAY) MINOR ARTERIAL (PUBLIC RIGHT OF WAY)(PUBLIC RIGHT OF WAY)ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−Ρ− 225ΣΓ ΡΣΘ∆∆Σ(PRIVATE ROAD) SECTION 22 SECTION 21 ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ− 50' FORESTED BUFFER \A1;10.0' PROPOSED UTILITY EASEMENT \A1;10.0' PROPOSED POWER EASEMENT Λ≅Μ≅Φ∆Χ ΕΝΘ∆ΡΣ ΑΤΕΕ∆Θ \A1;50.0' FORESTED BUFFER ΚΝΝΟ ΘΝ≅Χ (PRIVATE ROAD) LANDSCAPE ARCHITECT LEANNE D. KUHLMAN CERTIFICATE No. 743 WASHINGTON REGISTERED STATE OF A CONTINUOUS MANAGED FOREST BUFFER IS PROVIDED AROUND THE PERIMETER OF THE CP-1 ZONE. THE DEPTH OF THIS BUFFER IS 50' WHEN ABUTTING WEYERHAEUSER WAY SOUTH AND 100' WHEN ABUTTING HIGHWAY 18. A GENERAL MAINTENANCE PLAN WILL BE SUBMITTED WITH THE LAND MODIFICATION PERMIT (COMMERCIAL GRADE AND FILL). {NATIVE VEGETATION NOT WITHIN THE FORESTED BUFFER AND OUTSIDE OF GRADING LIMITS WILL BE LEFT UNDISTURBED. } ΣΘ∆∆ ΟΘ∆Ρ∆ΘΥ≅ΣΗΝΜ FORESTED BUFFER ΤΜΧΗΡΣΤΘΑ∆Χ Υ∆Φ∆Σ≅ΣΗΝΜ ΤΜΧΗΡΣΤΘΑ∆Χ Υ∆Φ∆Σ≅ΣΗΝΜ ΤΜΧΗΡΣΤΘΑ∆Χ Υ∆Φ∆Σ≅ΣΗΝΜ \pxqc;FUTURE POND EXPANSION NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\TR-01.dwg4/18/2022 2:54 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!TREE RETENTION PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 TR-01 LGB JJH 04/19/2022 ΣΘ,/0 3 02 AR ϑ∆Ξ Λ≅Ο NOT TO SCALE APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 100.0' FORESTED BUFFER ΤΜΧΗΡΣΤΘΑ∆Χ Υ∆Φ∆Σ≅ΣΗΝΜ ΤΜΧΗΡΣΤΘΑ∆Χ Υ∆Φ∆Σ≅ΣΗΝΜ \A1;10.0' EXISTING WATER EASEMENT \pxqc;BUILDING B COMPLETED UNDER PERMIT NO. 22-100735-00 EN FUTURE BUILDING A FUTURE STORM DETENTION POND NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. Know what's below. before you dig.Call R µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 (PUBLIC RIGHT OF WAY) ς∆Ξ ∆ Θ Γ ≅ ∆ Τ Ρ ∆ Θ ς ≅ Ξ Ρ − N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG EN G NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-01.dwg4/18/2022 3:00 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-01 LGB JJH 04/19/2022 ΦΘ,/0 4 02 SEE SHEET GR-03 FOR CONTINUATION STRIPPING = 22,005 CY CUT = 73,299 CY FILL = 50,512 CY APPROXIMATE EARTHWORK QUANTITIES FOR PERMIT PURPOSES ONLY. QUANTITIES ARE "NEAT LINE" YARDAGE'S WITHOUT ALLOWANCE FOR SHRINK OR SWELL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CALCULATE ALL YARDAGE'S FOR BID PURPOSES. 1.0' FT. OF STRIPPING WAS ASSUMED. PERVIOUS AREA=236,966 SF IMPERVIOUS AREA=436,471 SF ΒΝΜΡΣΘΤΒΣΗΝΜ Ρ∆ΠΤ∆ΜΒ∆ 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL PERIMETER PROTECTION, SUCH AS FILTER FABRIC FENCE, WHERE INDICATED. 5.GRADE AND INSTALL ROCK-LINED CONSTRUCTION ENTRANCE(S). 6.INSTALL SEDIMENT BARRIERS OVER EXISTING CATCH BASINS. 7.CLEAR TO LIMITS SHOWN ON PLANS AND INSTALL INTERCEPTOR DITCHES. 8.CONSTRUCT SEDIMENT PONDS. 9.ROUGH GRADE PARKING AREA AND BUILDING PAD. 10.INSTALL SANITARY SEWER SYSTEM. 11.INSTALL STORM DRAINAGE SYSTEM AND STORMWATER CARTRIDGE FILTERS. 12.INSTALL DOMESTIC WATER SYSTEM. 13.INSTALL SEDIMENT BARRIERS OVER CATCH BASINS. 14.FINE GRADE FOR CURB AND GUTTER, SIDEWALK, PAVEMENT, AND LANDSCAPING. 15.INSTALL CURB, GUTTER, AND SIDEWALK. 16.PAVE PARKING AREA. 17.REMOVE SEDIMENT BARRIERS. 18.COMPLETE LANDSCAPING. 19.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF FEDERAL WAY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. 20.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH CITY OF FEDERAL WAY STANDARDS. 21.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 22.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 23.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 24.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED, HYDROSEEDED AND BMPS REMOVED IF APPROPRIATE.SEE SHEET GR-02 FOR CONTINUATIONΡΝΗΚΡ Θ∆ΟΝΘΣ ΜΝΣ∆Ρ9 THE FOLLOWING SOILS REPORT NOTES FOR THE SITE SHALL BE CONSIDERED PART OF THESE CONSTRUCTION DOCUMENTS: SOILS INVESTIGATION: AS PERFORMED BY: GEOENGINEERS, INC 1101 SOUTH FAWCETT AVE, SUITE 200 TACOMA, WA 98402 FILE NUMBER 22247-001-02 DATED: MARCH 9, 2017 1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR THE SITE BE OBSERVED AND COMPLIED WITH DURING ALL PHASES OF THE SITE PREPARATION, GRADING OPERATIONS, FOUNDATION, SLAB, AND PAVING CONSTRUCTION AS APPLICABLE FOR THE PROJECT. 2. ANY PROVISIONS OF THE SOILS REPORT WHICH CONFLICT WITH INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRE FURTHER CLARIFICATION, SHALL BE BROUGHT TO THE ATTENTION OF THE SOILS ENGINEER. 3. A REPRESENTATIVE FOR THE SOILS ENGINEER SHALL BE AVAILABLE TO OBSERVE AND APPROVE THE EARTHWORK OPERATIONS AND TO VERIFY FIELD CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS CERTIFYING THAT THE METHODS AND MATERIALS OF THE EARTHWORK OPERATIONS WERE IN ACCORDANCE WITH THE RECOMMENDATION OF THE SOILS INVESTIGATION AND THAT THE WORK WAS PERFORMED TO THE SATISFACTION OF THE SOILS ENGINEER. THE SOILS ENGINEER SHALL BE CONTRACTED DIRECTLY WITH OWNER AND COORDINATE SOILS WORK BETWEEN OWNER AND CONTRACTOR. 4. THE CONTRACTOR SHALL MAKE ALL PROVISIONS FOR SOILS INSPECTIONS AS RECOMMENDED WITHIN SOILS REPORT. AS A MINIMUM, THIS INCLUDES THE OBSERVATION OF THE FOLLOWING BY A SOILS ENGINEER: {·}PLACEMENT OF STRUCTURAL FILL MATERIAL BENEATH FUTURE BUILDINGS AND PAVEMENT {·}ROCKERIES OVER 4 FEET AND THE ASSOCIATED GEOGRID PLACEMENT, AND CONSTRUCTION {·}ANY SLOPES 3 TO 1 AND STEEPER 5. WHERE NEW STRUCTURAL FILL WILL BE PLACED ON SLOPES STEEPER THAN 5H:1V, THE FILL SHOULD BE KEYED AND BENCHED INTO SUITABLE UNDERLYING NATIVE SOILS PER SOILS REPORT. ∂ ∂ ∂ %%UNOTES REDTOP BENTGRASS (Agrostis alba) 30%%% PERENNIAL RYEGRASS (Lolium perenne) 20%%% COLONIAL BENTGRASS (Agrostis tenuis) 20%%% RED FESCUE (Festuca rubra) 15%%% APPLICATION RATE: 30 LBS. / ACRE %%UNAME MIXTURE BELOW SPECIFIED AS A RATIO BY WEIGHT: SEED ALL AREAS THAT ARE BARE GROUND AND AT LEAST 18" FROM ANY PLANTED TREE OR SHRUB. FOR HYDROSEED, USE 7-8 LBS. OF SEED MIX PER 1,000 SQUARE FEET, APPROXIMATELY 9-10 LBS. OF 10-20-20 N-P-K FERTILIZER PER 1,000 SQUARE FEET, AND APPROXIMATELY 45-46 LBS. OF WOOD CELLULOSE FIBER MULCH PER 1,000 SQUARE FEET IN ALL AREAS TO BE SEEDED. ADD APPROXIMATELY 1 LB. OF TACKIFIER PER 1,000 SQUARE FEET FOR SLOPES AS NECESSARY. COMMON TIMOTHY (Phleum pratensis) 5%%% COMMON VELVETGRASS (Holcus lanatus) 5%%% {\LPROPORTION BY WEIGHT} ΤΟΚ≅ΜΧ Μ≅ΣΗΥ∆ Ρ∆∆Χ ΛΗΩΚΝΝΟ ΘΝ≅Χ(PRIVATE ROAD)\A1;50.0' FORESTED BUFFER \A1;13.4' R/W DEDICATION ϑ∆Ξ Λ≅Ο NOT TO SCALE APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 Know what's below. before you dig.Call R NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 (PUBLIC RIGHT OF WAY) ς∆Ξ∆ Θ Γ ≅ ∆ Τ Ρ ∆ Θ ς ≅ Ξ Ρ − N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG EN G NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-02.dwg4/18/2022 3:04 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-02 LGB JJH 04/19/2022 ΦΘ,/1 5 02 SEE SHEET GR-04 FOR CONTINUATIONSEE SHEET GR-01 FOR CONTINUATIONϑ∆Ξ Λ≅Ο NOT TO SCALE (PUBLIC RIGHT OF WAY)ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−\pxqc;WETLAND DQ (CAT. III) \A1;50.0' FORESTED BUFFER Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 ΡΝΗΚΡ Θ∆ΟΝΘΣ ΜΝΣ∆Ρ9 THE FOLLOWING SOILS REPORT NOTES FOR THE SITE SHALL BE CONSIDERED PART OF THESE CONSTRUCTION DOCUMENTS: SOILS INVESTIGATION: AS PERFORMED BY: GEOENGINEERS, INC 1101 SOUTH FAWCETT AVE, SUITE 200 TACOMA, WA 98402 FILE NUMBER 22247-001-02 DATED: MARCH 9, 2017 1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR THE SITE BE OBSERVED AND COMPLIED WITH DURING ALL PHASES OF THE SITE PREPARATION, GRADING OPERATIONS, FOUNDATION, SLAB, AND PAVING CONSTRUCTION AS APPLICABLE FOR THE PROJECT. 2. ANY PROVISIONS OF THE SOILS REPORT WHICH CONFLICT WITH INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRE FURTHER CLARIFICATION, SHALL BE BROUGHT TO THE ATTENTION OF THE SOILS ENGINEER. 3. A REPRESENTATIVE FOR THE SOILS ENGINEER SHALL BE AVAILABLE TO OBSERVE AND APPROVE THE EARTHWORK OPERATIONS AND TO VERIFY FIELD CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS CERTIFYING THAT THE METHODS AND MATERIALS OF THE EARTHWORK OPERATIONS WERE IN ACCORDANCE WITH THE RECOMMENDATION OF THE SOILS INVESTIGATION AND THAT THE WORK WAS PERFORMED TO THE SATISFACTION OF THE SOILS ENGINEER. THE SOILS ENGINEER SHALL BE CONTRACTED DIRECTLY WITH OWNER AND COORDINATE SOILS WORK BETWEEN OWNER AND CONTRACTOR. 4. THE CONTRACTOR SHALL MAKE ALL PROVISIONS FOR SOILS INSPECTIONS AS RECOMMENDED WITHIN SOILS REPORT. AS A MINIMUM, THIS INCLUDES THE OBSERVATION OF THE FOLLOWING BY A SOILS ENGINEER: {·}PLACEMENT OF STRUCTURAL FILL MATERIAL BENEATH FUTURE BUILDINGS AND PAVEMENT {·}ROCKERIES OVER 4 FEET AND THE ASSOCIATED GEOGRID PLACEMENT, AND CONSTRUCTION {·}ANY SLOPES 3 TO 1 AND STEEPER 5. WHERE NEW STRUCTURAL FILL WILL BE PLACED ON SLOPES STEEPER THAN 5H:1V, THE FILL SHOULD BE KEYED AND BENCHED INTO SUITABLE UNDERLYING NATIVE SOILS PER ∂ ∂ ∂ NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 TT µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-03.dwg4/18/2022 3:08 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-03 LGB JJH 04/19/2022 ΦΘ,/2 6 02SEE SHEET VIEW AT RIGHT FOR CONTINUATIONΚΝΝΟ ΘΝ≅Χ(PRIVATE ROAD)ϑ∆Ξ Λ≅Ο NOT TO SCALE SEE SHEET GR-01 FOR CONTINUATION SEE SHEET VIEW AT LEFT FOR CONTINUATION SEE SHEET GR-05 FOR CONTINUATIONΚΝΝΟ ΘΝ≅Χ(PRIVATE ROAD)Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 (PUBLIC RIGHT OF WAY)ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG EN G NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-04.dwg4/18/2022 3:12 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-04 LGB JJH 04/19/2022 ΦΘ,/3 7 02 SEE SHEET GR-02 FOR CONTINUATION ϑ∆Ξ Λ≅Ο NOT TO SCALE SEE SHEET GR-05 FOR CONTINUATION \A1;50.0' FORESTED BUFFER WETLAND DR (CAT. III)Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ BOTTOM WIDTH BOTTOM LENGTH TOP WIDTH TOP LENGTH SIDE SLOPES OVERFLOW ELEV. TOP RISER PIPE ELEV BOTTOM ELEV 0' 89.5' 42' 131.5' 3:1 (TYP) 398.25 398.25392.25 TOP POND ELEV ORIFICE DIAMETER (IN) RISER SIZE (IN) 399.25 2.43" ∀0 APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 Know what's below. before you dig.Call R POND DEPTH 7' SURFACE AREA REQUIRED 3,583 SF SURFACE AREA PROVIDED 5,523 SF 1"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ ∀0 ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ ≅,≅ 1"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ ∀0 ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ Α,Α BOTTOM=392.25 TOP=399.25 \A1;4.0' \A1;89.5'3:13:1\A1;4.0' \A1;131.5' \A1;42.0' BOTTOM=392.25 TOP=399.25 3:13:1≅ ≅ \A1;42.0'\A1;131.5'ΑΑ \A1;4.0' \A1;4.0' NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020(PUBLIC RIGHT OF WAY)ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-05.dwg4/18/2022 3:19 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-05 LGB JJH 04/19/2022 ΦΘ,/4 8 02SEE SHEET GR-03 FOR CONTINUATION\A1;5.0' CONCRETE SIDEWALK (TYP) ϑ∆Ξ Λ≅Ο NOT TO SCALE SEE SHEET GR-04 FOR CONTINUATION \A1;50.0' FORESTED BUFFER SEE SHEET GR-06 FOR CONTINUATION \A1;EX. 30.0' TELEPHONE EASEMENT WETLAND DT (CAT. III) Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ BOTTOM WIDTH BOTTOM LENGTH TOP WIDTH TOP LENGTH SIDE SLOPES OVERFLOW ELEV. TOP RISER PIPE ELEV BOTTOM ELEV 0' 105' 42' 147' 3:1 (TYP) 399 398393 TOP POND ELEV ORIFICE DIAMETER (IN) RISER SIZE (IN) 400 2.58" ∀1 APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 POND DEPTH 6' SURFACE AREA REQUIRED 2,208 SF SURFACE AREA PROVIDED 6,174 SF 1"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ ∀1 ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ Β,Β BOTTOM=393.003:11"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ ∀1 ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ Χ,Χ BOTTOM=393.00 TOP=400.00 TOP=400.003:1\A1;4.0'\A1;147.0'\A1;4.0' \A1;105.0' \A1;4.0'\A1;42.0'\A1;4.0'3:13:1Χ ΒΒ Χ \A1;42.0' \A1;147.0' NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. Know what's below. before you dig.Call R 04/18/2022 P P µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-06.dwg4/18/2022 3:24 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-06 LGB JJH 04/19/2022 ΦΘ,/5 0/02 SEE SHEET GR-05 FOR CONTINUATION SEE VIEW AT RIGHT FOR CONTINUATION SEE VIEW AT LEFT FOR CONTINUATION SEE SHEET GR-07 FOR CONTINUATIONϑ∆Ξ Λ≅Ο NOT TO SCALE \A1;100.0' FORESTED BUFFER \A1;100.0' FORESTED BUFFER ΡΣ≅ Σ ∆ Θ Ν Τ Σ ∆ 07 \A1;EX. 30.0' TELEPHONE EASEMENT \A1;EX. 15.0' SANITARY SEWER EASEMENT APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. Know what's below. before you dig.Call R 04/18/2022 C.B.P P P P P µ ΒΝΜΣΝΤΘ ΗΜΣ∆ΘΥ≅Κ < 1& ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG EN G NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-07.dwg4/18/2022 3:28 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-07 LGB JJH 04/19/2022 ΦΘ,/6 00 02SEE SHEET GR-06 FOR CONTINUATIONϑ∆Ξ Λ≅Ο NOT TO SCALEΚΝΝΟ ΘΝ≅Χ(PRIVATE ROAD)\A1;100.0' FORESTED BUFFER APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 ≅ ≅ΑΑ \pxqc;STORM DETENTION POND TO SERVE AS SECONDARY TEMPORARY SEDIMENT POND DURING CONSTRUCTION NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. Know what's below. before you dig.Call R 04/18/2022 ΟΝΜΧ ≅,≅ ΟΝΜΧ Α,Α N ETRAB .G A RU A 40111ANO R WFOE A SH NGTON T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-08.dwg4/18/2022 3:30 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!POND CROSS SECTIONWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-08 LGB JJH 04/19/2022 ΦΘ,/7 01 02 1"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' ΟΝΜΧ ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ ≅,≅ STORM POND 2:1100 YEAR 2:1\A1;6' BERM 15' GRAVEL ACCESS ROAD DETENTION REQUIRED: 224,000 (CF) DETENTION PROVIDED: 395,600 (CF) ΟΝΜΧ ΥΝΚΤΛ∆Ρ9 \A1;1' SEDIMENT STORAGE 1"= 1"=ΡΒ≅Κ∆9 HORIZ. VERT. 20' 5' ΟΝΜΧ ΒΘΝΡΡ Ρ∆ΒΣΗΝΜ Α,Α 15' GRAVEL ACCESS ROAD \A1;6' BERM STORM POND BOTTOM=373.44 \A1;1' SEDIMENT STORAGE 2:12:12:1100 YEAR ≅ΘΛΝΘ∆Χ ∆Λ∆ΘΦ∆ΜΒΞ ΡΟΗΚΚς≅Ξ Χ∆Σ≅ΗΚ EL. = 383.0 EXISTING GROUND 2' TOP OF POND EMBANKMENT FRONT VIEW 3 1 1 3 SYNTHETIC INDUSTRIES 451 SIDE VIEW GEOTEXTILE FABRIC OR EQUIVALENT PER PLAN SPILLWAY OVERFLOW ELEVATION NOT TO SCALE EL. = 384.0 FLOW DIRECTION PER W.S.D.O.T. STD. SPEC. 9-27.3 GABION CRIBBING COMPACT TILL APPROACH \A1;LSD=7.56' EMERGENCY OVERFLOW ELEVATION \A1;LSD=7.56' EMERGENCY OVERFLOW ELEVATION I.E.=374.44\A1;1.5'OVERFLOW EL.=382.00 \A1;1/4" ΒΑ ∀2 ΕΚΝς ΒΝΜΣΘΝΚ ΡΣΘΤΒΣΤΘ∆ SCALE: 1"=2' EL=382.00 EL=383.00 BOTTOM=373.44 EL=382.00 EL=383.00 EL=384.00 EL=374.44 EL=374.44 \A1;2' MIN2'MINAPPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 Know what's below. before you dig.Call R NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. 04/18/2022 N ETRAB .G A RU A 40111ANO R WFOE A SH NGTO N T E R ED SG ENG NEE EFOR P TS SS TA ER N A E G H NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME: DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.: PRINT: DATE OF \\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0015\\plots\\clear and grade\\GR-09.dwg4/18/2022 3:39 PMPlotted:File:Plotted By: Brandon AvalosEVERETTFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4≅ ΟΝΘΣΗΝΜ ΝΕ Ρ∆ΒΣΗΝΜ 10+ Σ−10 Μ−+ Θ− 3 ∆−+ ς−Λ−Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΗΚΧΗΜΦ !≅!T.E.S.C. AND GRADING NOTES AND DETAILSWASHINGTONCITY OF FEDERAL WAY1886-001-016-0015 GR-09 LGB JJH 04/19/2022 ΦΘ,/8 02 02 NOT TO SCALE ΘΝΒϑ,ΚΗΜ∆Χ ΒΝΜΡΣΘΤΒΣΗΝΜ ∆ΜΣΘ≅ΜΒ∆ Χ∆Σ≅ΗΚ R = 25' MIN. (OPTIONAL) 8" THICK MIN. 4" - 8" QUARRY SPALLS 100' (MIN.) EXISTING ROADWAY 20' MIN.(22' - 24' TYP.) ∆ΘΝΡΗΝΜ.Ρ∆ΧΗΛ∆ΜΣ≅ΣΗΝΜ ΒΝΜΣΘΝΚ ΜΝΣ∆Ρ9 WITH SEDIMENT RUNOFF WATER CATCH BASIN W/GRATE OVERFLOW FILTER FABRIC GEOTEXTILE MATERIAL FILTERED WATER NOT TO SCALE ΗΜΚ∆Σ ΟΘΝΣ∆ΒΣΗΝΜ Χ∆Σ≅ΗΚ 0.5' MIN. 1 3"1' FREEBOARD MIN.SWALE FLOW LINE KEY ROCK INTOSWALE 3" MIN. * DEPENDING ON SOIL CONDITIONS VARIES * VARIES *2' MIN.B 2 1 2 2 1 A ELEVATION 1 2 2" TO 4" QUARRY SPALLS 3" MIN. SPACING BETWEEN CHECK DAMS: L = THE DISTANCE SUCH THAT POINTS A & B ARE OF EQUAL %%uROCK CHECK DAM X-SECTION %%UINTERCEPTOR SWALE X-SECTION & ROCK CHECK DAM ΗΜΣ∆ΘΒ∆ΟΣΝΘ Ρς≅Κ∆ ϖ. ΘΝΒϑ ΒΓ∆Βϑ Χ≅Λ 3' MIN. NOTE: IF THE IDS OR SCC DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THEM SHALL BE INCREASED. ALL OF THE FOLLOWING PROVISIONS FOR WET SEASON CONSTRUCTION ARE DETAILED IN THE REFERENCED SECTIONS. THESE REQUIREMENTS ARE LISTED HERE FOR THE CONVENIENCE OF THE DESIGNER AND THE REVIEWER. 1.THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN. 2.STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. 3.COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE. 4.ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 5.MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. 6.FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE. 7.CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE-GRAINED SOIL. 8.SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 9.SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 10.PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR SURFACE WATERS. 11.ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS. 12.THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY. ς∆Σ Ρ∆≅ΡΝΜ ΡΟ∆ΒΗ≅Κ ΟΘΝΥΗΡΗΝΜΡ SEE GR-01 FOR INFLOW SILT FENCE OR EQUIVALENT DIVIDER KEY DIVIDER INTO SLOPE TO PREVENT FLOW AROUND SIDES POND LENGTH SHALL BE 3 TO 4 TIMES THE MAXIMUM POND WIDTH POND DIMENSIONS POND PLAN VIEW ≅ ≅ Α Α RISER PIPE, SEE DETAIL ABOVE VARIES \A1;6'W.S. ELEV. TOP ELEV. BOTTOM ELEV. 3:1 3:1 3:13:1SEE SEDIMENT POND TABLE ON SHEET GR-01 FOR ELEVATIONS\A1;6'ANTI-SEEP COLLARS WEIGHTED BASE TO PREVENT FLOATATION 3.58" DEWATERING OUTLET 12" CORRUGATED METAL RISER PIPE, OPEN AT TOP (PRINCIPAL SPILLWAY) PROVIDE A REBAR TRASH RACK WIRE BACKED SILT FENCE, STAKED HAYBALES, WRAPPED WITH FILTER FABRIC, OR EQUIVALENT APPROVED EQUAL. 6' MIN. 12" %%C S.D. 3:1 1' FREEBOARD 3 1 MIN. 2' SETTLING DEPTH SEDIMENT STORAGE 1.5' MAXIMUM DEPTH 6"%%C DEWATERING DEVICE (SEE RISER DETAIL) GEOTECHNICAL ENGINEERS RECOMENDATIONS. ALL BERMS SHALL BE CONSTRUCTED PER DISCHARGE CROSS SECTION A-A CROSS SECTION B-B EMBANKMENT COMPACTED TO 95%. PERVIOUS MATERIALS SUCH AS GRAVEL OR CLEAN SAND SHALL NOT BE USED. DISCHARGE TO STREAM RISER DETAIL COUPLING MAY BE USED TO PREVENT FLOTATION ALTERNATIVELY, METAL STAKES AND WIRECONC. BASE 6" MIN. TACK WELD WATERTIGHT WITH ASTM F667 AND AASHTO M294. ORIFICE. TUBING SHALL COMPLY POLYETHYLENE PERFORATED DRAINAGE TUBING, DIAMETER MIN. 2" LARGER THAN DEWATERING STRAPPING METAL RISER PIPE CORRUGATED OPEN TOP PROVIDE ADEQUATE DIAMETER PER PLANS. WRAP W/ FILTER FABRIC FULL LENGTH.3.58"%%C DEWATERING ORIFICE, SCHEDULE 40 STEEL STUB MINIMUM. EMERGENCY OVERFLOW SPILLWAY W/ RIP-RAP PAD NOT TO SCALE Ρ∆ΧΗΛ∆ΜΣ ΟΝΜΧ NOT TO SCALE \A1;6' RIP-RAP PAD=12' MIN. ROCK LINING=8' MIN. RIP-RAP PAD=2 FEET DEEP ROCK LINING=1 FOOT DEEP OUTLET PIPE PLAN PROFILE 1.ROCK LINING SHALL BE QUARRY SPALLS WITH GRADATION AS FOLLOW: PASSING 8-INCH SQUARE SIEVE:100% PASSING 3-INCH SQUARE SIEVE:40 TO 60% MAXIMUM PASSING 3/4-INCH SQUARE SIEVE:0 TO 10% MAXIMUM 2.RIP-RAP SHALL BE REASONABLY WELL GRADED WITH GRADATION AS FOLLOWS: MAXIMUM STONE SIZE:24 INCHES (NOMINAL DIAMETER) MEDIAN STONE SIZE:16 INCHES MINMUM STONE SIZE:4 INCHES \A1;6" ΝΤΣΕ≅ΚΚ ΘΝΒϑ ΚΗΜ∆Χ ΘΗΟ,Θ≅Ο Ο≅Χ Χ∆Σ≅ΗΚ STEEL POSTS) OF FILL SLOPES WITH (4' MAX AT BOTTOM12" MIN.2' MIN.6' MAX.IN 4"x4" TRENCH BURY BOTTOM OF FILTER MATERIAL USE STAPLES, WIRE RINGS OR EQUIVALENT TO ATTACH JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. FABRIC TO POSTS. STANDARD FILTER FABRIC MATERIAL FLOW 2' MIN.ΣΞΟΗΒ≅Κ ΝΘ≅ΜΦ∆ Ε≅ΑΘΗΒ Ε∆ΜΒ∆ Χ∆Σ≅ΗΚ ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE AND/OR REMOVE THE TRAPPED SEDIMENT. IF THE FILTER FABRIC HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. SEDIMENT MUST BE REMOVED WHEN THE SEDIMENT IS 6" HIGH. SEDIMENT TRAP OR POND. 5. 3. 4. 2. 1.12" MIN.8" 4" 2" BY 2" BY 14 GA. WIRE OR EQUIVALENT. IF STANDARD STRENGTH FABRIC USED. 2" BY 4" WOOD POSTS, STEEL FENCE POSTS, REBAR OR EQUIVALENT 2" BY 2" BY 14 GA. WIRE FABRIC OR EQUIV. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. MINIMUM 4"x4" TRENCH BACKFILL TRENCH WITH NATIVE SOIL OR 3/4"-1.5" WASHED GRAVEL (ONLY ADJACENT TO CRITICAL AREAS) ORANGE FILTER FABRIC MATERIAL Φ∆Μ∆Θ≅Κ ΜΝΣ∆Ρ 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FEDERAL WAY ZONING CODE (FWZC), APPLICABLE ORDINANCES, AND THE CITY COUNCIL CONDITIONS OF PROJECT APPROVAL. THESE DOCUMENTS ARE SUPPLEMENTED BY THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (WSDOT/APWA), THE KING COUNTY ROAD STANDARDS (KCRS), AND THE KING COUNTY SURFACE WATER DESIGN MANUAL (SWDM). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO THE CITY OF FEDERAL WAY. 2.THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO THE FEDERAL WAY ENGINEERING REVIEW CHECKLIST. SOME ELEMENTS MAY HAVE BEEN OVERLOOKED OR MISSED BY THE CITY PLAN REVIEWER. ANY VARIANCE FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF FEDERAL WAY, PRIOR TO CONSTRUCTION. 3.APPROVAL OF THIS ROAD, GRADING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICITY, ETC.). 4.BEFORE ANY CONSTRUCTION OF DEVELOPMENT ACTIVITY A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF FEDERAL WAY, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTION REPRESENTATIVE. 5.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.CONSTRUCTION NOISE SHALL BE LIMITED AS PER FEDERAL WAY CODE (SECTION 115.25) NORMALLY THIS IS 7 AM TO 8 PM MONDAY THROUGH FRIDAY, AND 9 AM TO 8 PM SATURDAY. 7.IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF-SITE WORK WITHIN THE ROAD RIGHTS-OF-WAY. 8.FRANCHISED UTILITIES OF OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL CITY REQUIREMENTS AND THE REQUIREMENTS OF KCRS CHAPTER 8 ARE SUBMITTED TO THE CITY OF FEDERAL WAY AT LEAST THREE DAYS PRIOR TO CONSTRUCTION. 9.DATUM SHALL BE KCAS UNLESS OTHERWISE APPROVED BY THE DIRECTOR OF PUBLIC WORKS. 10.GROUNDWATER SYSTEM CONSTRUCTION SHALL BE WITHIN A RIGHT-OF-WAY OR APPROPRIATE DRAINAGE EASEMENT, BUT NOT UNDERNEATH THE ROADWAY SECTION. ALL GROUNDWATER SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE WSDOT/APWA STANDARD SPECIFICATIONS. 11.ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95% DENSITY. 12.ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95% DENSITY. WSDOT 2-06.3. 13.OPEN CUTTING OF EXISTING ROADWAYS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE DIRECTOR OF PUBLIC WORKS AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH KCRS 8.03(B) 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRED AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23 - TRAFFIC CONTROL, SHALL APPLY. 1.APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (I.E. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.) 2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED. 3.THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. 4.THE ESC FACILITIES SHOWN ON THESE PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER STANDARDS. 5.THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED (I.E. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS. 6.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. 7.ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY EMBANKMENTS, WHERE NO FURTHER WORK IS ANTICIPATED OR A PERIOD OF 15 DAYS, SHALL BE IMMEDIATELY STABILIZED WITH TH APPROVED ESC METHODS (I.E. SEEDING, MULCHING, NETTING, EROSION BLANKETS, ETC.) 8.ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN 15 DAYS. 9.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HORS FOLLOWING A STORM EVENT. 10.AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 11.STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 12.WET SEASON REQUIREMENTS AS DESCRIBED IN APPENDIX D, SECTION D.5.2 OF THE KCSWDM ARE IN EFFECT BEGINNING OCTOBER 1 THROUGH APRIL 30. 13.ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION OR DISPERSION SYSTEM, THE FACILITY SHALL {NOT} BE USED AS A TEMPORARY SETTLING BASIN. NO UNDERGROUND DETENTION TANKS OR VAULTS SHALL BE USED AS A TEMPORARY SETTLING BASIN. 14.WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE (I.E. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE). 15.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES. 16.MANAGEMENT PRACTICES PROVIDING SIGNIFICANT TREE PROTECTION SHALL BE PROVIDED PER SECTION 22-1568 (C)(6)A-G) OF FWRC. NOTE: THIS APPROVAL IS VOID 1 (ONE) YEAR AFTER APPROVAL DATE. THE CITY WILL NOT BE RESPONSIBLE FOR ERRORS AND/OR OMISSIONS ON THESE PLANS. FIELD CONDITIONS MAY DICTATE CHANGES TO THESE PLANS AS DETERMINED BY THE CITY ENGINEER. Know what's below. before you dig.Call R APPROVED DATE PERMIT NO. 20-101386-CO CITY OF FEDERAL WAY INSPECTION 253-835-2700 04/18/2022