Loading...
21-101265-SU-2021 FW Concurency Application-03-15-2022-v1E:\TR Media Information\FW Concurency Application Rev. Jan2021.doc 2021 TRAFFIC CONCURRENCY REVIEW APPLICATION APPLICATION NO(S) Date Project Name Property Address/Location Parcel Number(s) Project Description PROPERTY OWNER Name: Phone/Fax: Address: City/State/Zip: Email: Cell: Signature: APPLICANT (If different than Owner) Name: Phone/Fax: Address: City/State/Zip: Email: Cell: Signature: Type of Development permit to be applied for: Commercial Multifamily (MF) Subdivision Short Subdivision Single Family (SF) None (Feasibility only) Other __________________________ Approval for City to perform Concurrency analysis: Yes No If NO: Applicant’s Traffic Engineer must perform Concurrency analysis consistent with City procedures; however, the application fee remains the same. PUBLIC WORKS DEPARTMENT 33325 8th Avenue South Federal Way WA 98003-6325 253-835-2700; Fax 253-835-2709 www.cityoffederalway.com Voda house 35027 21st Ave SW 2-Lot Short Plat Split existing single-family lot into (2) single-family lots 242103-9072 35027 21ST AVE SW FEDERAL WAY, WA 98023 3/10/2022 VASILIY AND OKSANA ODARCHUK 35027 21ST AVE SW FEDERAL WAY, WA 98023 253-740-6761 Hamid Korasani 6608 110th Ave. N. E. Kirkland, WA. 98033 425-214-2280hamidkorasani@yahoo.com E:\TR Media Information\FW Concurency Application Rev. Jan2021.doc I have read the above information regarding expiration deadlines and appeal process. I further understand that issuance of a concurrency certificate is not a guarantee that the City will issue a development permit or building permit. _______________________________________ _______________________ Property Owner/Agent Signature Date I have read the above information regarding expiration deadlines. I further understand that issuance of a concurrency certificate is not a guarantee that the City will issue a development permit or building permit. _______________________________________ _______________________ Property Owner/Agent Signature Date Required Information – Application is incomplete and will be returned if not filled out. Gross Square Feet (Commercial) Existing______________________ Proposed _____________________ Number of Dwelling Units Existing______________________ Proposed______________________ Number of Employees Existing______________________ Proposed______________________ Parcel size (acres or square footage) Existing______________________ Proposed______________________ Has the property previously been reviewed for concurrency? Yes___________ No__________ If yes, date of original application_____________________ Concurrency Permit No: ______________ Is this an amendment to an existing Concurrency Certificate? Yes___________ No_______________ Will the project be phased? _____________________________________________________________________ Development Build-Out Year _____________________________________________________________________ Note: - Commercial subdivisions and other projects constructed in phases shall be evaluated for concurrency as each phase is submitted for applicable development permits. - Once the concurrency test result has been determined, any changes to the development project require additional review will be billed on an hourly basis. Estimated Number of New Trip Generated by Project per Pre-application Summary: __________________________ If the applicant’s engineer has prepared a trip generation analysis, please provide the following. If not, staff will calculate the trip generation based on the above information. Existing PM Peak Hour Trips (if applicable) __________________________ Proposed PM Peak Hour Trips __________________________ Net New PM Peak Hour Trips __________________________ A Concurrency Reserve Certificate (CRC) is valid until the underlying development permit expires, is withdrawn or cancelled, whichever occurs first. In that case, a new concurrency application would be required. A Concurrency Reserve Certificate is valid only for the specific development approval consistent with the development parameters and City file number within the CRC issued. A Concurrency Reserve Certificate (CRC) runs with the land, and cannot be transferred to a different parcel. CONCURRENCY TEST EXPIRATION (FWRC 19.90) Permit Submittal: The following items are required for all applications: Completed and signed Concurrency Application Concurrency Application Fee paid (See Below) Net New PM Peak Hour Trip Less than 10 11 - 50 51 - 500 Greater than 500+ 2021 Application Fee $1,801.00 $5,167.00 $9,452.00 $15,152.00 SUBMITTAL REQUIREMENTS – STAFF USE ONLY 1 2 N/A N/A 2 per day 2/20/2022