Loading...
20-101386-CO-Response Letter-04-29-2022-V1 April 29, 2022 Job No. 1886-001-016-0015 Mr. Leonard Spadoni City of Federal Way 33325 8th Avenue S Federal Way, WA 98003 RE: Permit #20-101386-CO Woodbridge Building A; 3120 South 344th Street, Federal Way PW Development Comments for Onsite - RESPONSE Dear Mr. Spadoni: ESM Consulting Engineers, LLC, is submitting the following responses to the comment letter we received from you dated April 25, 2022. In an effort to provide concise and direct responses, we have copied the review comments below in italics and our responses are in bold. General Plan and Formatting 1. Add the city’s inspection notification phone number (253-835-2700), and the “One Call” utility locate number to the civil plan set. The City’s inspection notification phone number has been added to the cover sheet. The one call 811 utility locate number is already on the plan set. 2. Please remember that final acceptance of improvements will require the following: a. The correction of all defects as noted on the final punch list. b. Material submittals, shop drawings, and acceptable test/inspection reports. c. As-Built Plans – See PW Section 1.4.10 d. Statutory Warranty Deed – The developer shall submit a complete statutory warranty deed for all right-of ways and other lands to be dedicated to the public. Per PW Section 2.1.14 These comments have been noted and will be addressed prior to final acceptance. 3. The City’s standard general notes that apply to the plan shall be provided on the plans. The standard notes have been shown on sheets CV-01, GR-08 and DT-04. Mr. Leonard Spadoni April 29, 2022 Page 2 4. Construction Stormwater General permit with DOE 1/2021, is required. The NPDES permit information for both Woodbridge Buildings A and B has been submitted to the City. 5. Per SEPA MDNS condition response letter, item 5(I) a wheel wash is required. Construction general permit SWPP plan must be revised to address this condition. To be shown on T.E.S.C. plans. The SWPPP and plans have been revised to include the wheel wash. 6. SEPA MDNS condition for construction to be followed – Item 1, 2, 3, 4, 5, 6, 7, 8, 9 & 10. This information has been addressed as outlined in the compliance matrix submitted to the City on April 22, 2021. 7. Standard details to be most current PW Development Standards. Please include ROW Standard Drawings are not included. 3-02G, 4-10, 4-11, 4-20 a. Please add the Surveyor name and phone number to the Project Contacts on Plan Sheet 1. The details and survey information have been added on the relevant sheets. 8. Full build out of the retention ponds and water quality infrastructure to be completed and accepted by PW for either Building A, or B prior to C of O granted for either building. This comment has been noted and will be addressed as necessary prior to issuance of C of O. 9. Full build out of road frontage improvements and channelization improvements must be completed and accepted by PW for either Building A or B prior to C of O granted for either building. This comment has been noted and will be addressed as necessary prior to issuance of C of O. 10. A Forester must be present to supervise the activities in environmentally sensitive areas and forest buffer zones. A note has been added to reflect this information on sheet TR-01. Site Plan and Roadway Elements 11. All retaining walls that are over 4-feet and/or support a surcharge load will require a separate Building Permit. Mr. Leonard Spadoni April 29, 2022 Page 3 This comment has been noted and wall building permits will be applied for as required. 12. Show property lines, right-of-way lines and widths for proposed road and intersecting roads on plan view and show street cross-sections and reference applicable City Roadway section. This information has been shown on the frontage sheets. The applicable City Roadway section has been added under the road name. 13. Show all existing and proposed roadway features such as centerline, edge of pavement and shoulder, ditch line curbs and/or sidewalks. In addition, points of access to abutting properties and roadway continuations shall be shown. Reference SEPA MDNS response letter items 8,9, & 10. This information has been addressed as outlined in the compliance matrix submitted to the City on April 22, 2021. 14. Use PW Development most current Standard details for streets and features. It appears you have not included 3-02G, 4-10, 4-11, 4-20. Please correct. The details have been added as requested. 15. Provide channelization/Signage Table detail and station location. The channelization and illumination plans for Weyerhaeuser Way South have been completed and were submitted to the City on April 22, 2021. 16. The Geotechnical Recommendations to be followed for specific construction. This comment has been noted and will be addressed, as necessary. Drainage Conveyance 17. Again, storm system/detention pond full build out (As shown for Building A & B) will be required to be completed prior to certificate of occupancy is granted. This comment has been noted and will be addressed as necessary prior to C of O. 18. The City’s most current standard Drainage notes that apply to the plan shall be provided on the plans. The notes have been verified to be the most current standard drainage notes. 19. If PVC is used as storm drain material then a PVC adapter required at CB/MH's (for PVC pipe only. Applies to all locations. Mr. Leonard Spadoni April 29, 2022 Page 4 The drainage notes on sheet DT-04 have been revised to include this note. 20. Cover over PVC pipe (SDR 35) shall be 3' minimum. Applies in all locations. The cover has been verified to be met as required. 21. Solid waste enclosures require drainage collection and conveyance system and pollution management per FWRC 19.125.150 (Attachment A). The proposed trash enclosure has an area of 315 square feet and will be covered as required by FWRC 19.125.150. A side sewer service and grease interceptor has been added and is shown in the background of this plan set. A field changed will be obtained from Lakehaven Water & Sewer District to the approved sewer plans. Retention/Detention General 22. Full buildout of detention pond must be completed prior to certificate of occupancy for either building A or B is granted. This comment has been noted and will be addressed as necessary prior to C of O. 23. Dam Safety Compliance required. Detention pond is over 10-acre feet: Detention ponds and other open impoundment facilities must comply with requirements for dam safety (WAC 173-175). Under current regulations (as of February 2012), if the impoundment has a storage capacity (including both water and sediment storage volumes) greater than 10 acre-feet above natural ground level and a dam height of more than 6 feet, then dam safety design and review are required by the Washington State Department of Ecology (Ecology). If the storage capacity is less than 10 acre-feet above natural ground level, then the facility is exempt from Ecology review. If the dam height is less than 6 feet but capacity is greater than 10 acre-feet, then Ecology reviews on a case-by-case-basis to determine the hazard potential downstream in the event of a failure. 13 Acre Feet - 67,165 SF, 9.5’ deep. The detention pond required live storage volume is 413,100 cubic feet (9.48 acre-feet) storing the Level 3 flow control of the 100-year storm event. The detention pond available volume is 442,438 cubic feet (10.22 acre-feet), providing a 7 percent factor of safety. The sediment storage volume is 50,150 cubic feet (1.15 acre-feet), for a total pond volume of 492,588 cubic feet (11.31 acre-feet). The maximum berm height between existing natural ground and the top of live storage is 5.7 feet, which is less than the 6 feet. Per WAC 173-175-020 Applicability (1), dated October 25, 2019: Only water that can be stored above natural ground level or which could be released by a failure of the dam is considered in assessing the storage volume. Mr. Leonard Spadoni April 29, 2022 Page 5 The volume of water that is stored 5.7 feet above natural ground level (elevations 376.3 to 382.0) is 346,525 cubic feet (7.96 acre-feet), which is the volume that is required to be under a maximum 10 acre-feet as to not trigger the dam safety requirement. In summary, the proposed stormwater detention pond stores less than 10 acre-feet with a 5.7 feet height berm and does not trigger the dam safety requirement. 24. Rip rap pads for outflow are required. Rip rap pad sized per 2021 KCSWDM Rip rap pads underlain by sand and gravel filter or filter fabric. Applies in all locations. Rip rap pad has been added for the proposed discharge location to Stream EA. 25. Support straps shall be 1 in top 1/3 of control tee and 1 in bottom 1/3 of control tee. Per DWG 4-14. The support straps have been updated as requested. 26. Storm Filter/Water Quality Vaults 1. Approval letter from manufacturer, including total contributing area, impervious area, detention release rate, maximum release rate, media, cartridge flow rate, minimum drop required. 2. Formal quote from manufacturer, for bond information. 3. 2-year maintenance agreement from Stormwater Management Inc., including cartridge removal and vault cleaning. 4. Yearly (minimum) Certificate of Compliance stating that maintenance has been completed by Stormwater Inc. (Direct it to Surface Water Division Manager). This information will be provided as soon as obtained from the manufacturer. 27. Water quality treatment shall be provided for new pollution-generating surfaces, where surfaces were taken to sub-grade, within the public right-of-way. Additional water quality treatment has been provided onsite to mitigate for the replaced pavement reconstruction and new Weyerhaeuser Way South widening pavement (1.8 acres). The TIR has been updated to reflect this information. 28. Flow control shall be provided for new surfaces, where surface is taken to sub- grade, in right-of-way and meet most current regulations. Additional flow control has been provided onsite to mitigate for the replaced pavement reconstruction and new Weyerhaeuser Way South widening pavement (1.8 acres). The TIR has been updated to reflect this information. Mr. Leonard Spadoni April 29, 2022 Page 6 If there are any questions or a need for further clarification, please feel free to contact me at (253) 838-6113 and we would be happy to discuss them with you. Sincerely, ESM CONSULTING ENGINEERS, LLC LAURA BARTENHAGEN, P.E., LEED® AP Principal \\esm8\engr\esm-jobs\1886\001\016-0015\document\letter-026.docx