21-101842-Permit FinalCity of Federal Way
Conununity Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: WOODSMALL
Project Address: 30857 22ND AVE S
Project Description: BLUEBEAM - Construction of a covered deck.
Building - Single Family
Permit #:21-101842-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 053700 0570
Owner
Applicant
Contractor
Lender
JAMES WOODSMALL
JAMES WOODSMALL
OWNER IS CONTRACTOR
OWNER IS LENDER
30857 22ND AVE S
30857 22ND AVE S
FEDERAL WAY WA 98003
FEDERAL WAY WA 98003
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
#2
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
0
New / Additional Sq. Feet - 3rd Floor.... .................
0
Occupancy # 1 -Construction Type .........................
Type V - B
New / Additional Sq. Feet - Garage ........................
0
Plumbing Work Valuation? .....................................
0
Number of Stories ......................
I
Is this an Online or O.T.C. application? ..................
No
New / Additional Sq. Feet - Total ...........................
352
Comprehensive Plan Designation.... ....................... SF - High -Density
Residential
Total Valuation: 6,846.40
New / Additional Sq. Feet - 2nd Floor .................... 0
New / Additional Sq. Feet - Basement ....................
0
New / Additional Sq. Feet - Deck ...........................
352
Mechanical to be Included? .....................................
No
Mechanical Work Valuation? ..................
0
New / Additional Sq. Feet - Other ...........................
0
Plumbing to be Included? ........................................
No
Occupancy #1 -Use ................................................
Residence (1 or 2
family)
Zoning Designation.................................................
RS 7.2
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Tuesday, 8 February, 2022
Permit Issued on Thursday, August 12, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
PItEa City of Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUE Ts: (253) 835-3050
PERMIT #: 21 101842 00 Address: 30857 22ND AVE S
Project: JAMES WOODSMALL FEDERAL WAY WA 98003-4931
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0 SWM Precon Site Mtg (4400) Q Initial Erosion Control (4365) Q Footings/Setback (4110)
Approved To be done PRIOR to breaking ground Approved to place concrete
By Date By Date By Date
®
Foundation Wall (4115)
5❑
Drainage/Downspout (4040)
®
Slab/Concrete Floor (4255)
Approved to place concrete
Approved to backfiI I
Approved to place concrete
By
Date
By
Date
By
Date
Q
By
Underfloor Framing (4285)
Approved to sheath floor
Date
®
By
Floor Sheathing (4105)
Approved to install flooring
Date
®
By
Shear Walls (4245)
Approved to install siding
Date
12
By
Interim Erosion Control (4370)
Approved
Date
iD Roof Sheathing (4220)
Approved to install roofing
By Date
11 Fire/Draft Stops (4095)
Approved
By Date
ming inspection;
Prior to sche::�ac
13 Framing (4120)
14 Insulation (4150)
Electrical, Pluehanical Rough -in
Approved to insulate
Approved to install wallboard
and Fire/Draft ions must be signed-
offandIBC 109.3.4
By Date
By Date
15 Gypsum Wallboard Nailing (4130) 1ti Final Erosion Control (4375) E] Final - Building (4050)
Approved to install mud & tape Approved Approved
By Date By Date By Date 'a/ 1 1,
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date