Loading...
20-101386-CO-Response Letter-05-10-2022-V1 May 10, 2022 Job No. 1886-001-016-0015 Mr. Leonard Spadoni City of Federal Way 33325 8th Avenue S Federal Way, WA 98003 RE: Woodbridge Building A; 3120 South 344th Street, Federal Way Dear Mr. Spadoni: ESM Consulting Engineers, LLC, is submitting the following responses to the traffic comments received on the plans for Woodbridge Building A on May 5, 2022. In an effort to provide concise and direct responses, we have copied the plan comments below in italics and our responses are in bold. 1. Sheet ST-02 – Remove “BY TRAFFIC ENGINEER” The text has been removed. 2. Sheet GR-05 – “Should this be located out of driveway?” This existing catch basin is located in the Weyerhaeuser Way South roadway flowline and represents a low point; therefore, it is not proposed to be relocated. 3. Sheet FR-01 – “This is within limit access, confirm pavement design approved by WSDOT.” Per attached email correspondence with Duffy McColloch, WSDOT has no changes to the proposed pavement area to be replaced or to the proposed pavement section. The Traffic Control Plans (TCPs) will be revised under the WSDOT permit as necessary and coordinated with Rick Johnson for review and approval prior to starting the work. 4. Sheet FR-02 – “Conflict with illumination plan showing relocation.” Sheet FR-02 has been revised to match the illumination plan. Mr. Leonard Spadoni May 10, 2022 Page 2 5. Sheet FR-02 – “To where? Specify and refer to illumination plan.” The information has been revised as requested. 6. Sheet FR-02 – “This should be the same as channelization design by TENW.” The channelization information has been updated to match the design by TENW. 7. Sheet FR-03 – “Island per Dwg. No. 3-58 and plans prepared by TENW.” The island has been revised to reference the design by TENW. 8. Sheet FR-03 – “Conflict with Channelization and Illumination plan prepared by TENW refer to Dwg. No. 3-58.” The island has been revised to reference the design by TENW. 9. Sheet FR-03 – “Approved by King County Metro? Install bus stop and shelter on east side of the street. There is an existing bus shelter on the east side of the road.” The bus service at this location is Pierce Transit and the proposed relocated bus stop and shelter were coordinated with Pierce Transit in August 2017 to be relocated to the north, across the street, with a new crosswalk location as shown per the approved Process III site plan (approved February 4, 2019). 10. Sheet FR-04 – “Install new crosswalk markings including detectable warning surface at the splitter islands to meet current ADA at all approaches.” A note has been added to address this comment. 11. Sheet FR-05 – “New location? Bus shelter per detail on Sheet FR-03?” There is an existing bus shelter at this same location that is being relocated to the back of the added 8 feet wide sidewalk. A detail for this bus shelter has been added to this sheet. 12. Sheet FR-05 – “Install new crosswalk markings including detectable warning surface to meet current ADA.” A note has been added to address this comment. Mr. Leonard Spadoni May 10, 2022 Page 3 If there are any questions or a need for further clarification, please feel free to contact me at (253) 838-6113 and we would be happy to discuss them with you. Sincerely, ESM CONSULTING ENGINEERS, LLC LAURA BARTENHAGEN, P.E., LEED® AP Principal \\esm8\engr\esm-jobs\1886\001\016-0015\document\letter-027.docx